Section 8.8.17. - Erosion Control.

Erosion control measures shall be maintained in place throughout the job and after completion of the work until permanent vegetation is established. The permittee shall be responsible for stabilization of all work areas by use of vegetation or other approved means. The permittee shall be responsible for replanting if vegetation does not begin growing within 30 days after the work has been completed. If temporary grassing is used then permanent grassing shall be provided at the earliest possible growing season. All permanent grassing shall be like kind for all disturbed areas to include sod where sod is located. The permittee may be required by the City Engineer to install ground cover material such as jute mesh or other matting in critical areas. A. Linear Projects. 1. All work shall be completed as it progresses along the route. All trench/cut work shall be backfilled and compacted to a 100% of the Standard Proctor Density, (SPD) under the roadway and 90% along the shoulder not under the roadway. Trench/cut shall be kept backfilled and at no point be more than 1 day behind the installation of utility lines or pipes. 2. Linear Trenchless Projects that have excavated points along the route for tie in to existing utilities or have points of connection along the route shall backfill and compact these holes within 5 calendar days of the excavation unless a time extension is granted by the Director of Engineering. Final grassing is not required at this time however temporary erosion control measures shall be placed and maintained until permanent stabilization is completed. B. Non-Linear Projects. As work progresses all holes shall be backfilled and compacted to 100% of the SPD under the roadway and 90% along the shoulder not under the roadway. C. On all projects that disturb the City right-of-way the, permittee shall install temporary and/or permanent vegetative measures in accordance with the season, within 5 working days following backfill and compaction of the trench/cut. All debris and excess material shall be cleaned and hauled from the site prior to installing vegetation or within 5 working days of completion of the work whichever is sooner. D. Spoil that is not hauled away by the end of each day may be left on the job for further use on the job if all spoil stockpiled on site is contained at the end of each working day in a manner satisfactory to the City Engineer. No spoil shall be left exposed or uncontained so that it may run into a drainage system during a rain event. E. For underground construction and maintenance, the permittee and/or his contractor are responsible for restoring disturbed areas as close as possible to original condition. This includes the replacement of grassing, shrubs, trees, etc. within kind species. Repairs and/or replacements of existing structures and irrigation systems that are located on the right-of-way are the responsibility of the permittee or their designated contractor and shall also be replaced.

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.