§ 8.8.7 — Open Cut Technology—Roadways
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.8.7
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/66187821-9f1a-4475-b1bf-e036ca8952d1
Section 8.8.7. - Open Cut Technology—Roadways.
Open Cut of a roadway is prohibited for new installations unless site conditions warrant it or as otherwise approved by the Department of Engineering. The open cut method may be used for repair of existing facilities. Repair of Open Cuts in paved roadways may be done one of the two methods described herein: A. Alternate Method 1 (concrete cap) General Construction Procedure. 1. The cut is to be made, the work one the buried structure completed then the cut shall be backfilled with good, dry local material from the original cut. If the material from the cut is wet or unsuitable then material approved by the City Engineer shall be used to backfill the hole. (A) Permanent repair of the cut shall be an additional 6 inches wide on each side to a depth of 7½ inches to provide for the placement of a concrete bridge (cap) to reduce differential settlement. Refer to the current detail on file in the Department of Engineering. 2. The backfill material shall be placed in 6 inch lifts and compacted to 100% of the SPD, beginning at the bottom of the cut and continuing to within 7½ inches below the finished surface of the roadway. The permittee shall take special care to maintain the optimum moisture content and control the thickness of each lift compacted. 3. Compaction testing shall be done as directed by the City Engineer on a random basis or may be required when there is suspicion that there may be a problem with the backfill or that the compaction is not adequate or done in accordance with the specifications. Testing shall be done by a certified testing firm acceptable to the City. The City shall pay for initial random testing. 4. Temporary Patch. A temporary patch material may be used in the cut to bring the roadway surface up to normal grade. In the event that weather prohibits a timely permanent repair from being completed, the permittee shall make permanent repair as soon as practical but in no cases longer than 45 days from placement of the temporary patch. All roadway cuts shall be permanently repaired within 45 calendar days as measured from the dated that the hole is backfilled and compacted. The permittee is responsible for continuous maintenance of the cut and any claims of damage to vehicles or property while the temporary patch material is in place. The permittee shall continue to be responsible for maintenance of the cut and claims of damage to vehicles or property for the warranty period. 5. Permanent Patch. Six (6) inches of class "A" concrete having a minimum compressive strength of 3,000 p.s.i, shall be placed in the trench/cut on the compacted backfill material. Sufficient curing times shall be allowed for the concrete before placement of the asphalt surface course but the final 1½ inches of permanent asphalt shall be placed within 5 working days after the concrete is placed. Allowances for additional time will be considered by the City Engineer when sufficient cause is given for the delay of placement of permanent asphalt. The permittee may elect to use a concrete mix design containing additives to produce accelerated curing. Mix designs shall be submitted to the Department of Engineering for approval prior to use. The permittee is responsible for having an approved testing laboratory design a mix design for an altered curing time. 6. Specifications: (A) Specifications for Concrete. Concrete used on city streets shall be "Class A" concrete with a minimum compressive strength of 3,000 p.s.i. Slump shall be within the range of 2 inches minimum to 4 inches, maximum. The top surface of the concrete shall be left a minimum of 1½ inches below the existing surface of the roadway to allow for placement of a permanent hot mix asphalt. A permanent hot mix asphalt patch 1½ inches thick shall be placed and compacted using approved compaction equipment over the concrete cap. (B) Asphalt Specifications. Asphalt will be 1½ inches thick or 165 lbs/square yard, Type E or other suitable mix approved by the City Engineer. (C) Specifications for Point Repair Cuts. Point repair cuts in the pavement shall be a minimum of 3 feet wide each way when alternate method 1 is used. The additional width on each side of the cut is to allow for placement of the concrete bridge. When alternate method 2 is used the cut shall be a minimum of 2 feet wide each way. The minimum width is to allow room for compaction equipment to be properly used during the backfilling of the hole. B. Alternate Method 2 (select backfill) General Construction Procedure. 1. The trench/cut shall be backfilled in 6 inch lifts using M-10 stone as defined by the Georgia Crushed Stone Association. Alternate backfill materials may be substituted with prior written approval from the Engineer. All Backfill material shall be compacted to 100% of the SPD for the entire depth of the trench/cut. Moisture shall be added to each lift as the trench/cut is filled in order to achieve maximum compaction. 2. The trench/cut shall be filled and compacted to within 1½ inches of the street surface level with M-10 material. Temporary patch material shall be placed and compacted on the select backfill. 3. Once the trench/cut is filled and temporary patch material is placed, then the roadway may be opened for traffic. 4. Upon approval by the Engineer, the permittee may substitute Graded Aggregate Base material as defined in the Department of Transportation, State of Georgia, Standard Specifications construction of Roads and Bridges, 1993 or most current edition; Section 815—Graded Aggregate, in lieu of M-10 stone. C. Temporary Patches. 1. The permittee shall fill the trench/cut to within 1½ inches of the roadway surface and place approved "cold mix" as a temporary patch, then open the roadway for traffic. 2. Within 45 days of placement of the temporary patch material, the permittee shall excavate the patch to a depth of 1½ inches below the surface of the roadway, and place 1½ inches of hot mix asphalt as a permanent patch.
(Ord. No. 09-4, § 1, 1-27-09)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.