CB105 — COMMISSIONING AND OPERATIONS
Revised Ordinances of Honolulu (2026 S-11: Supplement 11, Ordinance No. 26-1 through Ordinance No. 26-18, June 30, 2026) · Revised Ordinances of Honolulu ch. 16B, § CB105
Corpus is an independent public-information project, not the official City of City and County of Honolulu website. Stable reference: corpuslaw.us/code/4d7483af-a367-48e8-acf6-8e94e8d2a4fc
SECTION CB105 COMMISSIONING AND OPERATIONS
CB105.1 General. Buildings shall be designed and operated to aid in compliance with energy reporting, benchmarking, and performance-based requirements from the jurisdiction or building owner to aid in reducing overall energy consumption and grid impacts and diagnosing performance issues. CB105.2 Mechanical systems and service water-heating systems commissioning and completion requirements. Buildings containing 25,000 square feet or more of conditioned space shall comply with the commissioning and completion requirements of Section C408.2. Exceptions for system sizing shall not be allowed under the application of this stretch code. CB105.3 Energy reporting. A data acquisition system having the capability to store the data from the required meters and other sensing devices is required. Data stored by the data acquisition system shall be shared with the jurisdiction on an annual basis for no less than 36 months. Data shall be provided in hourly, daily, monthly, and yearly logged data for each end-use category required by Table CB105.3. TABLE CB105.3ENERGY USE CATEGORIES LOAD CATEGORY | DESCRIPTION OF ENERGY USE TABLE CB105.3ENERGY USE CATEGORIES LOAD CATEGORY | DESCRIPTION OF ENERGY USE Total HVAC system | Heating, cooling and ventilation, including but not limited to fans, pumps, boilers, chillers, and water heating. Energy used by 120-volt equipment, or by 208/120-volt equipment that is located in a building where the main service is 480/277-volt power, is permitted to be excluded from total HVAC system energy use. Interior lighting | Lighting systems located within the building. Exterior lighting | Lighting systems located on the building site but not within the building. Plug loads | Devices, appliances and equipment connected to convenience receptacle outlets. Process load | Any single load that is not included in HVAC, lighting or plug load category and that exceeds 5 percent of the peak connected load of the whole building, including but not limited to data centers, manufacturing equipment, and commercial kitchens. Electric vehicle charging | Electric vehicle charging loads. Building operations and other miscellaneous | The remaining loads not included in this table, including but not limited to vertical transportation systems, automatic doors, motorized shading systems, ornamental fountains, ornamental fireplaces, swimming pools, in-ground spas and snow-melt systems.
Ask a question about City and County of Honolulu law
Corpus searches the City and County of Honolulu sections it holds and shows the ones that match, with their citations. Free, no sign-in.
