CB106 — REFERENCED STANDARDS
Revised Ordinances of Honolulu (2026 S-11: Supplement 11, Ordinance No. 26-1 through Ordinance No. 26-18, June 30, 2026) · Revised Ordinances of Honolulu ch. 16B, § CB106
Corpus is an independent public-information project, not the official City of City and County of Honolulu website. Stable reference: corpuslaw.us/code/61da1bbf-5d1a-4939-858d-f77b500ecd29
SECTION CB106 REFERENCED STANDARDS
AHRI Air Conditions, Heating and Refrigeration Institute 2311 Wilson Blvd. Suite 400 Arlington, VA 22201 1380-2019 Demand Response Through Variable Capacity HVAC System in Residential and Small Commercial Applications CB104.2.2.1.1 ASME American Society of Mechanical Engineers Two Park Avenue New York, NY 10016-5990 ASME/BPVC-2019 Boiler and Pressure Vessel Code CB 104.2.1 CTA Consumer Technology Association 1919 S. Eads Street Arlington, VA 22202 ANSI/CTA-2045-B Modular Communications Interface for Energy Management T104.2.1 ANSI/CTA-2045-A 2018 Modular Communication Interface for Energy Management CB 104.2.2.1.2 IEC International Electrotechnical Commission IEC Regional Centre for North America 446 Main Street 16th Floor Worcester, MA 01608 IEC 62746-10-1-2018 Systems interface between customer energy management system and the power management system Part 10-1: Open Automated demand response CB104.2.2.1.2 OpenADR Open ADR Alliance 111 Deerwood Road Suite 200 San Roman, CA 94583 2.0a and 2.0b- 2019 Profile Specification Distributed Energy Resources CB104.2.2.1.2 UL Underwriters Laboratories LLC 333 Pfingsten Road Northbrook, IL 60062 9540-2020 Standard for Energy Storage Systems and Equipment CB104.2.3.2.2 16B-19 9540A-2019 Standard for Safety Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems CB104.2.3.2.2 (27) Amending Section R101.5. Section R101.5 is amended to read: R101.5 Compliance. Compliance and enforcement procedures are in accordance with ROH Chapter 16, Article 10, and Chapter 18, Article 7. (28) Adding Section R103.1. Section R103.1 is added to read: R103.1 General. Construction documents and other supporting data must be submitted to indicate compliance with this code. The construction documents shall be prepared, designed, approved and observed by a duly licensed design professional, as required by HRS Chapter 464. The responsible design professional must provide on the plans a signed statement certifying that the project is in compliance with this Section R103.2 of this code. Exception: Any building, electrical, or plumbing work that is not required to be prepared, designed, approved, or observed by a licensed professional architect or engineer, pursuant to HRS Chapter 464. Specifications and necessary computations need not be submitted when authorized by the code official. (29) Adding Section R103.2. Section R103.2 is added to read: R103.2 Information on construction documents. Construction documents must be drawn to scale upon suitable material or submitted in an electronic form acceptable to the code official. Construction documents must be of sufficient clarity to indicate the location, nature, and extent of work proposed and show, in sufficient detail, pertinent data, and features of the building, systems, and equipment as herein governed. All plans, reports, and documents must be certified by the project design professional or engineer, using the appropriate form shown below and submitted to the code official certifying that the plans and documents conform to the requirements of this code. [image omitted; see the official code] (30) Amending Section R202. Section R202 is amended to read: Section R202 General Definitions. (a) Add the definition of “High-Efficacy Lighting” to read: HIGH-EFFICACY LIGHTING means an efficacy of not less than 70 lumens per watt for lamps and 55 lumens per watt for fixtures (b) Add the definition of “LIGHT REFLECTANCE VALUE” to read: LIGHT REFLECTANCE VALUE means the amount of visible light that reflects from a surface expressed as a percentage, where zero means a surface absorbs all light and 100 means a surface reflects all light. (c) Add the definition of “OCCUPIABLE SPACE” to read: OCCUPIABLE SPACE means an enclosed space intended for human activities, excluding those spaces intended primarily for other purposes, such as storage rooms and equipment rooms, that are only occupied occasionally and for short periods of time. (31) Amending Section R401.2. Section R401.2 is amended to read: R401.2 Compliance. Buildings shall comply with Section R408 and either Sections R401.2.1, R401.2.2, R401.2.3, or R401.2.4. Single-family homes over 7,000 sf shall additionally comply with Section R401.3. R401.2.1 Prescriptive compliance. Buildings shall comply with Sections R401 through R404. R401.2.2 Total building performance. Buildings shall comply with Section R405. R401.2.3 Energy rating index. Buildings shall comply with Section R406. R401.2.4 Tropical zone. Buildings shall comply with Section R407. (32) Amending Section R401.2.1. Section R401.2.1 is re-numbered to R407.1: R407.1 Tropical zone. [no change in text] (33) Amending Section R401.3. Section R401.3 is re-numbered to read R401.4: R401.4 Certificate (Mandatory). [no change in text] R401.4.1 Sampling. [no change in text] (34) Adding Section R401.3. Section R401.3 is added to read: R401.3 Large home compliance. Single-family homes greater than 7,000 square feet shall comply with Section R401.3.1. Single-family homes greater than 7,000 square feet that have 2,000 square feet or more of conditioned space shall comply with Sections R401.3.1 and R401.3.2. (35) Adding Subsection R401.3.1. Subsection R401.3.1 is added to read: R401.3.1 Minimum efficiency. Buildings shall comply with the following requirements, except where a requirement is preempted by a variance approved pursuant to HRS § 196-6.5. These measures shall be treated as mandatory, and no credit shall be taken for the measures in the compliance path selected for compliance with Section R401.2: (a) Where used, installed electric water heaters, air conditioners over 2.5 tons (30,000 Btu), electric pool and spa pumps, and electric pool and spa heaters shall be smart appliances capable of responding to grid signals. (b) Exterior walls shall have a minimum area-weighted initial solar reflectance of 0.30 or a minimum insulation R-value of R-13. (c) Roofs shall be constructed with two of the following: (1) A minimum insulation R-value of R-30. (2) Attic venting in compliance with International Residential Code Section R806.1 Radiant barrier with an emittance of 0.05 or less, tested in accordance with ASTM C1371 or ASTM E408. (3) Roofs, based on slope, shall meet either an initial or three-year aged solar reflectance index (SRI) value in accordance with Table R401.3.1.4. Table R401.3.1.4ROOF SOLAR REFLECTANCE INDEX | Slope | Initial SRI | 3-year aged SRI Low-sloped roof | ≤2:12 | 82 | 64 Steep-sloped roof | >2:12 | 28 | 25 (36) Adding Subsection R401.3.2. Subsection R401.3.2 is added to read: R401.3.2 Additional efficiency. Buildings shall comply with the following requirements, except where a requirement is preempted by a variance approved pursuant to HRS § 196-6.5. These measures shall be treated as mandatory, and no credit shall be taken for the measures in the compliance path selected for compliance with Section R401.2: (a) Compliance must be completed in accordance with Section R401.2.2 or R401.2.3. (b) For projects complying via Section R406, maximum ERI value of 52 not including on-site power production calculated in accordance with RESNET/ICC 301. (c) For projects complying via Section R405, must be 10 percent lower than the standard reference design. (d) HVAC systems shall be multi-stage or variable capacity systems. (e) Thermostats shall be provided with a demand responsive control that complies with the communication and performance requirements of AHRI 1380 and capable of communicating with the Virtual End Node (VEN) using a wired or wireless bi-directional communication pathway that provides the homeowner the ability to voluntarily participate in utility demand response programs, where available. The thermostat shall be capable of executing the following actions in response to a demand response signal: (1) Automatically increasing the zone operating set point by the following values: 1°F (0.5°C), 2°F (1°C), 3°F (1.5°C), and 4°F (2°C). (2) Automatically decreasing the zone operating set point by the following values: 1°F (0.5°C), 2°F (1°C), 3°F (1.5°C), and 4°F (2°C). (3) The thermostat shall be capable of performing all other functions provided by the control when the grid-integrated controls are not available. (37) Amending Section R402.1. Section R402.1 is amended to read: R402.1 General (Prescriptive). The building thermal envelope shall comply with the requirements of Sections R402.1.1 through R402.1.5. Exceptions: The following “low energy buildings”, or portions thereof separated from the remainder of the building by building thermal envelope assemblies complying with this section, shall be exempt from the building thermal envelope provisions of Section R402. 1. Those with a peak design rate of energy usage less than 3.4 Btu/h-ft2 (10.7 W/m2) or 1.0 watt per square foot (10.7 W/m2) of floor area for space conditioning purposes. 2. Unconditioned space that does not contain occupiable space. (38) Amending Table R402.1.2. Row 1 of Table R402.1.2 (Climate Zone 1) is amended to read: [image omitted; see the official code] (39) Amending Section R402.2.5. Section R402.2.5 is amended to read: R402.2.5 Mass walls. Mass walls where used as a component of the building thermal envelope shall be one of the following: (a) Above-ground walls of concrete block (concrete masonry units) CMU, concrete, insulated concrete form, masonry cavity, brick but not brick veneer, adobe, compressed earth block, rammed earth, solid timber or solid logs. (b) Any wall having a heat capacity greater than or equal to 6 Btu/ft2. °F (123 kJ/m2.K). (c) Mass walls shall comply with the insulation requirements of Table R402.1.2 or the U-factor requirements of Table R402.1.4. Exceptions: Insulation or R-value for mass walls, indicated in Table R402.1.2, is not required when one of the following conditions is met: 1. Walls have a covering with a light reflectance value greater than or equal to 0.64; 2. Walls have overhangs with a projection factor greater than or equal to 0.3. The projection factor is the horizontal distance from the surface of the wall to the farthest most point of the overhang divided by the vertical distance from the first floor level to the bottom most point of the overhang; or 3. Concrete, CMU and similar mass walls are 6 inches or greater in thickness and have an unpainted finish with or without a clear sealer. (40) Amending Section R403.5.1. Section R403.5.1 is amended by deleting the word “Mandatory” and adding Exceptions 1 and 2 to read: R403.5.1 Heated water circulation and temperature maintenance systems. Exceptions: 1. Piping located under a floor slab. 2. Buried piping. (41) Amending Section R403.5.1.1. Section R403.5.1.1 is amended to read: R403.5.1.1 Circulation systems. Heated water circulation systems may be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water supply pipe. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. (42) Amending Section R403.5.1.2. Section R403.5.1.2 is amended to read: R403.5.1.2 Heat trace systems. Electric heat trace systems may comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. (43) Amending Section R403.5.3. Section R403.5.3 is amended to read: R403.5.3 Hot water pipe insulation (Prescriptive). Insulation for hot water piping with a thermal resistance, R-value, of not less than R-3 shall be applied. Exceptions: 1. Piping located under a floor slab. 2. Buried piping. 3. Piping serving only one dwelling unit. (44) Amending Section R403.6. Section R403.6 is amended to read: R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that complies with the requirements of the Housing Code, as specified in Chapter 16A, as applicable, or with other approved means of ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. R403.6.1 Whole-house mechanical ventilation system fan efficacy. Fans used to provide whole-house mechanical ventilation shall meet the efficacy requirements of Table 403.6.1. Exception: Where an air handler that is integral to tested and listed HVAC equipment is used to provide whole-house mechanical ventilation, the air handler shall be powered by an electronically commutated motor. TABLE R403.6.1WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACYa TABLE R403.6.1WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACYa FAN LOCATION | AIR FLOW RATE MINIMUM (CFM) | MINIMUM EFFICACY (CFM/WATT) | AIR FLOW RATE MAXIMUM (CFM) HRV or ERV | Any | 1.2 cfm/watt | Any Range hoods | Any | 2.8 cfm/watt | Any In-line fan | Any | 2.8 cfm/watt | Any Bathroom, utility room | 10 | 1.4 cfm/watt | <90 Bathroom, utility room | 90 | 2.8 cfm/watt | Any For SI: 1 cfm = 28.3 L/min.a. When tested in accordance with HVI Standard 916. (45) Adding an exception to Section R403.6.2. Section R403.6.2 is amended by adding the exception to read: Exception: For production home building, ceiling fan junction boxes shall be provided for bedrooms and the largest interior space that is not used as a bedroom, and ceiling fan equipment shall be provided as a buyer’s option. (46) Amending Section R404.1. Section R404.1 is amended by adding Section R404.1.2 to read: R404.1.2 High-efficacy lighting. An efficacy of not less than 70 lumens per watt for lamps and 55 lumens per watt for fixtures. (47) Adding Section R408. Section R408 is added to read: SECTION R408 SOLAR AND ELECTRIC VEHICLE READINESS R408.1 Solar conduit and electrical panel readiness. Construction documents shall indicate a location for inverters, metering equipment, battery equipment, energy storage equipment, and other equipment necessary to interconnect a residence with on-site solar energy generation facilities with the electrical grid in compliance with applicable laws, statutes, and utility tariffs. Construction documents shall indicate a pathway for routing of conduit from the solar panel location to the point of interconnection with electrical service. New single-family detached dwellings, two-family detached dwellings, and duplexes shall install for each residence an electrical panel with reserved space to accommodate not less than a five Kilowatt (AC) photovoltaic system. New multifamily dwellings shall install an electrical panel that includes space reserved to accommodate a photovoltaic system: (1) sized to serve common area electrical loads, or (2) sized to the roof space available. The reserved space shall be clearly labeled as solar PV ready. All feeders and electrical distribution equipment, including switchgear, switchboards, and panel boards that will be fed simultaneously by the electrical grid and other power sources shall be sized to support the installation of future solar energy generation systems per the interconnection requirements of the Electrical Code. New residential buildings shall also install conduit not less than one and one-half inches to provide a pathway from the electrical panel to the inverter location and from the inverter location to the underside of the roof sufficient to allow future installation of solar equipment. If conduits are to be installed between separate buildings or other structures, construction documents shall provide sufficient details to show that compliance with the Electrical Code’s restrictions on the number of power supplies to each building or other structure has been examined. R408.2 Electric vehicle readiness. In addition to what is required by the Electrical Code, if a building permit application involves installation of an electrical panel and parking area for a multifamily dwelling of three stories or less or a detached dwelling or duplex, a dedicated receptacle or junction box for an electric vehicle must be provided with a minimum AC Level 2 charge (208 to 240V AC 1-phase minimum 16A) in each enclosed attached garage. (Added by Ord. 23-25)
Ask a question about City and County of Honolulu law
Corpus searches the City and County of Honolulu sections it holds and shows the ones that match, with their citations. Free, no sign-in.
