§ 15.44.100 — Permit procedures
Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 15.44.100
Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/a0edd954-3368-40cb-82a8-98e2309cd902
15.44.100. - Permit procedures.
Application for a Floodplain Development Permit must be made to the Floodplain Administrator on forms furnished by the Floodplain Administrator prior to starting Development Activities. Specifically, the following information is required: A. Application Stage. 1. Plans drawn to scale with elevations of the project area and the nature, location, and dimensions of Existing Structures and proposed Structures, earthen fill placement, storage of materials or equipment, and drainage facilities; 2. Elevation in relation to the Flood protection elevation, or Highest Adjacent Grade, of the Lowest Floor, including crawl spaces or Basement, of all proposed Structures; 3. Elevation to which any non-residential Structure will be Floodproofed; 4. Elevation into which any proposed utility equipment and machinery will be elevated or Floodproofed; 5. Design certification from a registered professional engineer or architect that any proposed non-residential Floodproofed Structure will meet the Floodproofing criteria in subsection Sec. 15.44.130 of this chapter; 6. The boundary of the Special Flood Hazard Area as delineated on the FIRM or other Flood map or a statement that the entire lot is within the Special Flood Hazard Area; 7. The Base Flood Elevation (BFE) where provided; 8. Description of the extent to which any Watercourse will be altered or relocated by the proposed Development; 9. A foundation plan, drawn to scale, which must include details of the proposed foundation system to ensure all provisions of this chapter are met. These details include but are not limited to: a. The proposed method of elevation, if applicable (i.e., fill, solid foundation perimeter wall, solid backfilled foundation, open foundation, or on columns/posts/piers/piles/shear walls); and b. Openings to facilitate automatic equalization of hydrostatic Flood forces on walls when solid foundation perimeter walls are used in Zones A, AE. 10. Usage details of any enclosed area below the Lowest Floor; and 11. Certification that all other local, state, and federal permits required prior to Floodplain Development Permit issuance have been received. B. Construction Stage. 1. For all New Construction and Substantial Improvements, the permit holder must provide to the Floodplain Administrator an as-built certification of the floor elevation or Floodproofing level, using the appropriate FEMA Elevation Certificate or Floodproofing certificate, prior to the final inspection. When Floodproofing is utilized for non-residential Structures, the certification must be prepared by a professional engineer or architect. 2. Certificate deficiencies identified by the Floodplain Administrator must be corrected by the permit holder prior to issuance of the certificate of occupancy. C. Technical Review. 1. If the City does not have the expertise to evaluate the technical data that is part of the application, the City may contract for an independent engineering review or require a review by FEMA through the Letter of Map Change process. The applicant will pay the costs of an independent technical review and any other associated FEMA costs. D. Expiration of Floodplain Development Permit. 1. Start of Construction must begin on all work authorized by a Floodplain Development Permit within one hundred eighty (180) days of permit issuance, or the permit will expire. Thereafter, all work permitted by the permit must be pursued to completion.
(Ord. No. 1494, § 1, 9-19-2023)
Ask a question about Post Falls law
Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.
