For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.44.180 — Standards for zones with base flood elevations

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 15.44.180

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/78449a05-1a80-4ff4-aab9-a1c9bf70b677

15.44.180. - Standards for zones with base flood elevations.

The following provisions apply in all Special Flood Hazard Areas: A. New Construction and Substantial Improvements. 1. Where Base Flood Elevation data are available, New Construction or Substantial Improvement of any Structure or Manufactured Home must have the Lowest Floor, including the Basement, constructed at one foot above BFE. If solid foundation perimeter walls are used to elevate a Structure, openings sufficient to facilitate the unimpeded movement of floodwaters must be provided in accordance with the construction standards in subsection sec. 15.44.130 D. of this chapter. B. Non-residential Construction. 1. New Construction and Substantial Improvements of non-residential Structures within Zone AE on the Community's FIRM: a. Have the Lowest Floor (including the Basement) elevated at or above the Base Flood Elevation; or b. Together with attendant utility and sanitary facilities, be designed so that below the Base Flood Elevation, the Structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. 2. Provide that where a non-residential Structure is intended to be made watertight below the Base Flood Elevation: a. A registered professional engineer or architect must develop or review structural design, specifications, and plans for the construction and must certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the applicable provisions; and b. A record of such certificates, which includes the specific elevation (in relation to Mean Sea Level) to which such Structures are Floodproofed must be maintained with the Floodplain Administrator. C. Floodway Undetermined. Where the Floodway has not been determined, no New Construction, Substantial Improvements, or other Development (including fill) will be permitted in zones AE on the effective FIRM, unless it is demonstrated that the cumulative effect of the proposed Development when combined with all other existing and anticipated Development, will not increase the Water Surface Elevation of the Base Flood more than one foot at any point within the Community. Applicants of proposed projects that increase the Base Flood Elevation more than one foot must obtain and submit to the Floodplain Administrator a Conditional Letter Of Map Revision (CLOMR) at preconstruction. D. Application For CLOMR. Postconstruction, the applicant must apply to FEMA for a Letter of Map Revision (LOMR) for changes to the Flood hazard map proposed in the CLOMR.

(Ord. No. 1494, § 1, 9-19-2023)

Ask a question about Post Falls law

Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.