§ 15.44.220 — Requirement to submit new technical data
Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 15.44.220
Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/88a5cc43-f534-466d-997f-451b30fe7516
15.44.220. - Requirement to submit new technical data.
A. Base Flood Elevations may increase or decrease from physical changes affecting Flooding conditions. As soon as practicable, but not later than six (6) months after such information becomes available, the Floodplain Administrator must notify the FEMA of the changes by submitting technical or scientific data per title 44 Code of Federal Regulations section 65.3. Such a submission is necessary so that upon confirmation of those physical changes affecting Flooding conditions, risk premium rates and Floodplain Management requirements will be based on current data. B. Notify the FEMA in writing of acquisition by means of annexation, incorporation, or otherwise of additional areas of jurisdiction. C. For all Development proposals that impact Floodway delineations or Base Flood Elevations, the City must ensure that technical data reflecting such changes be submitted to FEMA within six (6) months of the date such information becomes available. These Development proposals include: 1. Floodway Encroachments that increase or decrease Base Flood Elevations or alter Floodway boundaries; 2. Fill sites to be used for the placement of proposed Structures where the applicant desires to remove the site from the Special Flood Hazard Area; 3. Alteration of Watercourses that result in relocation or elimination of the Special Flood Hazard Area, including the placement of culverts; 4. Subdivision or large-scale Development proposals requiring the establishment of Base Flood Elevations according to subsection sec. 15.44.130 C. of this chapter. D. The applicant is responsible for preparing technical data in a format required for a Conditional Letter Of Map Revision (CLOMR) or Letter of Map Revision (LOMR) and submitted to FEMA. Submittal and processing fees for these map revisions shall be the applicant's responsibility.
(Ord. No. 1494, § 1, 9-19-2023)
Ask a question about Post Falls law
Corpus searches the Post Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.
