Sec. 8-21. - Permits and administration.
(a) Survey. (1) After the foundation of a new building or any addition to an existing building has been completed, the applicant shall furnish a survey prepared by a registered state surveyor showing the dimensional location of such foundation, and including the following required information: a. Accurate dimensions of front yard, side yards and rear yard setbacks; b. United States Geographical Survey (USGS) elevations of top of foundation at all corners and top of curb or crown of street. (2) The information required in subsection (a)(1) of this section may be shown upon a recertification of the plat filed at the time the building permit was secured. No further work is to proceed until the plat (spotted plat) is filed and approved. Such plats must be filed within ten business days from the date of the foundation inspection. (3) When required, a final topographical survey shall be furnished by the applicant after the final grading is completed. No final grade inspection shall be conducted until this survey is reviewed and approved. The final topographical survey shall indicate the finished grade elevations at the identical points shown on the approved grading plan. (4) All required surveys shall be prepared, signed and sealed by a surveyor in good standing licensed by the state. (b) Code amendments. (1) Section R105.1 of the 2021 International Residential Code and section 105.1 of the 2021 International Building Code shall be amended to add the following: (a) No permit shall be issued for the erection of any building or structure which is not completely in conformity with the applicable provisions of the Palatine Code. (b) No permit shall be issued hereunder for any premises unless the sanitary sewer mains and water mains of the village shall have been extended within rights-of-way or easements to the furthest property line of the premises if readily accessible within 250 feet from the property line or unless a temporary permit shall have been issued pursuant to authorization by the corporate authorities of the village for the installation on the premises of facilities other than modern plumbing facilities properly connected with the water distribution and sanitary sewer systems of the village, and unless there shall have been installed or unless provision is made in the plans and specifications for the installation on the premises of facilities for provision of potable water and the disposal of human waste and excreta and other similar sewage in accordance with the ordinances of the village. (c) No building permit shall be issued hereunder for the erection of a building for residential purposes on any tract or parcel of real estate unless the condition or all of the conditions, as the case may be, mentioned or enumerated in one of the following exist: 1. Water and sanitary sewer facilities, which are in good working order and available for the satisfactory servicing of the premises, shall have been extended to the farthest property line of the premises. Also, some street upon which the premises borders shall have been satisfactorily improved with a paved roadway surface which extends in such condition from the premises to an Illinois State highway or to another street extending in such condition to such a highway. Also, adequate storm sewer facilities shall have been installed in the vicinity of the premises to prevent the flooding of the premises by surface waters; 2. The building is to be constructed on a lot or parcel of real estate bordering upon a section of a street over which travel extends for ingress and egress purposes between a residence already erected at the time of the enactment of this condition and an existing improved public street or highway; or 3. Provision is made under contract entered into with the village by some person, co-partnership, trust or corporation for the installation of water and sanitary sewer facilities, surface drainage facilities and street improvements, such as are provided for in subsection (c)1 of this section, in the block upon which such lot or parcel of real estate is located, supported by a performance and indemnity bond in favor of the village and duly filed with the village in such amount and with such company as may be approved by the corporate authorities and in conformance with section 9.02 and 9.03 of the village subdivision code; site development and floodplain regulations code; provided, however, that no occupancy permit shall be issued for any building for which a building permit shall have been issued pursuant to this subsection (c) until all of the improvements provided for by the aforesaid contract shall have been fully installed and duly approved and accepted by the corporate authorities and each building permit issued pursuant to this subsection (c) shall so recite. (d) If deemed necessary by the code official, no permit shall be issued for the erection of any commercial or industrial building or structure until a crime prevention analysis has been performed upon the plans of such building or structure. (2) Section R105.1 of the 2021 International Residential Code and section 105.1 of the 2021 International Building Code shall be amended as follows: a. Add the following at the end of the section: Any of the work previously described in this section which has been started or completed without a permit and for which notice has been given to the owner of the property involved, or to the owner's agent or to the person doing the work shall make application for the required permit within ten business days of such notice. (3) Section R105.5 of the 2021 International Residential Code and section 105.5 of the 2021 International Building Code shall be amended as follows: a. Replace the reference to "180 days" with "90 days." b. Add the following sections: (a) Expiration. An issued building permit under which the work is not completed within one year from the date of issuance shall expire by statute of limitation, and all permit fees shall be forfeited to the village, unless the owner or duly appointed representative requests an extension in writing 30 calendar days before the above-described expiration dates. (1) Express permit expiration. An express permit under which the work is not completed within three months from the date of issuance shall expire by statute of limitation, and all permit fees shall be forfeited to the village, unless the owner or duly appointed representative requests an extension in writing 30 calendar days before the above-described expiration dates. (2) Demolition permit. All demolition permits for which the work is not completed within three months from the date of issuance shall expire by statute of limitation, and all permit fees shall be forfeited to the village, unless the owner or duly appointed representative requests an extension in writing 30 calendar days before the above-described expiration dates. (b) Removal of above-ground improvements/restoration of site. Within 30 days after the expiration of a permit pursuant to the provisions of this subsections (a) and (a)(1) of this section, the owner or applicant shall cause any above-ground improvements, constructed pursuant to the permit, to be removed and the site restored to either its original condition or a condition acceptable to the building official. (c) Approved permits. Approved permits will be held for 30 days after the notice of approval has been made to the applicant. Failure to pay for the approved permit within 30 days of such notice will result in a forfeiture of said permit. All fees incurred by the village up to that date will be charged to the applicant. (4) Section R106.1 of the 2021 International Residential Code and section 107.1 of the 2021 International Building Code. The first line shall be amended to read: Construction documents, special inspection reports, signed contracts, plat of survey (or site plan), structural calculations, and other data shall be submitted digitally, unless specified otherwise, with each application for a permit. For commercial, industrial and multifamily projects, a digital set of such information shall be submitted with each application for a permit. All plans, excluding detached single-family construction, shall be prepared and sealed by a licensed design professional in the state. Single-family projects are not subject to being prepared by a design professional when submittal conforms to the limits of the IRC or under the direction of the building official. All resubmittals shall be in complete sets unless otherwise directed by the building official. (5) Section R105.2, work exempt from permit, of the 2021 International Residential Code shall be amended as follows: a. Under the heading of "building," line one shall be amended to read as follows: "One story detached temporary structures used for tool and storage sheds, playhouses and similar temporary uses, provided the floor area does not exceed 64 square feet or a maximum height of ten feet and located in accordance with zoning regulations." b. Under the heading of "building," lines numbered two, five and ten shall be deleted in their entirety. c. Under the heading of "building," line seven shall be amended to read as follows: "Storable or prefabricated swimming pools that are disassembled in their entirety and put into storage between the dates of September 15 and May 15 of each year." d. Under the heading of "building," line three shall be amended to read as follows: "Retaining walls that are not over four feet in height measured from the bottom of the footing to the top of the wall or have an exposed wall height less than three feet, unless supporting a surcharge. Surcharges include, but are not limited to, sloping retained soils, structure footings supported by the retained soil, adjacent vehicular or other loads whether permanent or temporary that are supported by the retained soils, fences that are attached or directly adjacent to a retaining wall where wind pressures can act upon it and tiered walls where the offset of the walls is less than two times the exposed wall height of the lower wall." e. Under the heading of "building," add the following: tents less than 800 square feet in area for three or less days. f. Under the heading of "building," add the following to the end of line 9: "nor infringe upon the required zoning setbacks." g. Window replacements that do not alter the framing of the opening, and window replacements that do not alter the opening size or reduce the size of the opening. (6) Section 105.2, work exempt from permit, of the 2021 International Building Code shall be amended as follows: a. Under the heading of "building," line one shall be amended to read as follows: "One-story detached temporary structures used for tool and storage sheds, playhouses and similar temporary uses, provided the floor area does not exceed 64 square feet or a maximum height of ten feet and located in accordance with zoning regulations." b. Under the heading of "building," lines numbered two, six and ten shall be deleted in their entirety. c. Under the heading of "building," line nine shall be amended to read as follows: "Storable or prefabricated swimming pools that are disassembled in their entirety and put into storage between the dates of September 15 and May 15 of each year." d. Under the heading of "building," line four shall be amended to read as follows: "Retaining walls that are not over four feet in height measured from the bottom of the footing to the top of the wall or have an exposed wall height less than three feet, unless supporting a surcharge. Surcharges include, but are not limited to, sloping retained soils, structure footings supported by the retained soil, adjacent vehicular or other loads whether permanent or temporary that are supported by the retained soils, fences that are attached or directly adjacent to a retaining wall where wind pressures can act upon it and tiered walls where the offset of the walls is less than two times the exposed wall height of the lower wall." e. Under the heading of "building," add the following: tents and less than 800 square feet in area for three or less days. f. Under the heading of "building," add the following to the end of line 12: nor infringe upon the required zoning setbacks. g. Window replacements that do not alter the framing for residential use groups of Type R-2, R-3, R-4 which are individually owned, and that do not alter the opening size or reduce the size of the opening area. (7) Section R105.3.2 of the 2021 International Residential Code and section R105.3.2 of the 2021 International Building Code shall be amended as follows: a. Replace all references to "180 days" with "90 days." b. Add the following line to the end of the section: "Where application for permit is in response to the issuance of a stop work order, such application shall be deemed to have been abandoned in 30 days after the date of filing unless such application has been pursued in good faith."
(Code 1976, §§ 6-1.4—6-1.4.7; Ord. No. O-58-03, § 1, 3-10-2003; Ord. No. O-204-07, §§ 1—3, 12-10-2007, eff. 1-1-2008; Ord. No. O-30-10, § 1, 4-5-2010; Ord. No. O-69-11, § 1, 6-20-2011, eff. 7-18-2011; Ord. No. O-30-13, § 1, 4-8-2013; Ord. No. O-93-18, 8-13-2018, eff. 1-1-2019; Ord. No. O-111-24, exh. A(6-1.4), 12-2-2024)
Ask a question about Palatine law
Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.