Sec. 8-22. - Fees.
Section R108 of the 2021 International Residential Code and section 109 of the 2021 International Building Code shall be amended as follows: (1) Section R108.2 of the 2021 International Residential Code and section 109.2 of the 2021 International Building Code shall be amended to add the following: Schedule of fees. Each application for a permit shall be accompanied by a fee, as provided in the village fee schedule, computed according to the following schedule. All reference to fees in the adopted codes is hereby amended to the following: (1) Plan examination: See the village fee schedule for the fees for examining each set of plans submitted with applications for a building permit in accordance with the following schedule: a. Single-family detached dwellings, single-family detached dwelling additions, alterations, remodeling or detached structure having an estimated valuation of work as follows: 1. $5,000.00 or less. 2. $5,001.00 or more. b. All other types of construction, based on an estimated valuation of work as follows: 1. Minimum fee. 2. $100,000.00 or less. 3. $100,001.00 or more. c. Any additional and exceptional expenses incurred by the village for plan review not covered by the fees in subsection (1)a or b of this section shall be reimbursed to the village on a one-to-one ratio by the applicant. (2) Preliminary plan review services shall be performed for a fee, as provided in the village fee schedule, per hour per person. Any fees paid for the preliminary review shall not be credited toward the cost of the final plan review. (3) Building permit: See the village fee schedule for the fee for issuance of a building permit with an estimated valuation of work as follows: $5,000.00 or less. $5,001.00 or more. a. Building permit extension: When requested in writing at least 30 days prior to expiration and justifiable cause demonstrated, a building permit extension shall be granted. A fee for a 90-day permit extension shall be determined as follows: 1. Detached single-family residential: ten percent of the building permit fee as determined by section 8-22(2) of the village Code but no less or more than identified in the village fee schedule. 2. All other: ten percent of the building permit fee as determined by section 8-22(2) of the village Code but no less or more than identified in the village fee schedule. (4) Certificate of occupancy: A per unit fee for a certificate of occupancy shall be charged in accordance with the village fee schedule. a. Temporary certificate of occupancy: When requested in writing and justifiable cause demonstrated, a temporary certificate of occupancy shall be granted. A temporary certificate of occupancy shall be valid for 30 days under normal conditions or valid to June 1 for winter conditions. A fee shall be determined as follows: 1. Detached single-family residential: ten percent of the building permit fee as determined by section 8-22(2) of the village Code but no less or more than identified in the village fee schedule. 2. All others: ten percent of the building permit fee as determined by section 8-22(2) of the village Code but no less or more than identified in the village fee schedule. (5) Demolition and wrecking buildings: See the village fee schedule for the fee for a permit to demolish a building. (6) Moving of building: See the village fee schedule for the fee for moving a building in accordance with the following schedule: a. Using public right-of-way. b. Not using public right-of-way. (7) Inspections. Every new building or structure and every remodeling, repair or alteration of an existing building or structure shall be charged a minimum inspection fee as provided in the village fee schedule published by the village. a. Inspection of plumbing and sanitation fixtures (new and/or replacement). 1. Up to three fixtures. 2. Four to six fixtures. 3. In excess of six fixtures, per fixture (in addition to the above). b. Inspection of fire protection systems and other/similar. 1. NFPA 13, 13D, and 13R fire suppression systems. i. Up to 50 sprinkler heads. ii. For each additional 50 sprinkler heads or fraction thereof over 50 (in addition to the above). 2. Inspection of fire protection systems and other/similar. c. Inspection of electrical systems. 1. Residential (new and/or renovation) per unit. i. 250 square feet or less. ii. 251 to 1,000 square feet (in addition to the above). iii. Each additional 1,000 square feet or fraction thereof (in addition to the above). 2. In other than residential occupancies (new and/or renovation). i. 42 circuits or less, per circuit. ii. 43 circuits or more, for each additional circuit (in addition to the above). d. Inspection of HVAC systems. 1. 250 square feet or less. 2. 251 to 10,000 square feet (in addition to the above). 3. Each additional 10,000 square feet or fraction thereof (in addition to the above). e. Inspection of carpentry (framing, roofing, concrete, insulation, and similar). 1. 500 square feet or less. 2. 501 to 1,000 square feet (in addition to the above). 3. 1,001 to 10,000 square feet, per 1,000 square feet or fraction thereof (in addition to the above). 4. 10,001 to 20,000 square feet, per 1,000 square feet or fraction thereof (in addition to the above). 5. 20,001 square feet and up, per 10,000 square feet or fraction thereof (in addition to the above). f. Re-inspections. If a contractor calls for an inspection and the work is not ready, incomplete, or is otherwise failed, a re-inspection will then be required. In addition to the fee paid for the failed inspection, the contractor shall be charged a re-inspection fee as provided in the village fee schedule published by the village. g. Cancelled inspection fee. No fee shall be charged for a cancelled inspection provided the cancellation occurs by 4:00 p.m. on the previous day for inspections scheduled for the next morning and by 11:00 a.m. on the day of for afternoon inspections. Inspections not cancelled in this manner may be charged a cancelled inspection fee as provided in the village fee schedule published by the village. h. Elevator inspection/re-inspection fee. The fee for elevator inspections, new elevator installations and required re-inspections shall be as provided for in the village fee schedule. (2) Section R108.3 of the 2021 International Residential Code shall be amended to read as follows: Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official and they may utilize the latest ICC construction cost bulletin or alternative published data to determine valuation of the proposed work. (3) Forfeiture of permit applications. Permit applications which have expired by limitation or are withdrawn shall pay all fees incurred by the village up to that date. (4) Forfeiture by limitation. Fees for permits which have expired by limitation shall be forfeited to the village. (5) Return of fee upon surrender of permits. If a permit is surrendered within the calendar year of the date of issuance, and no work has been commenced, the applicant will be refunded permit fees, minus any costs incurred by the village. For those special fees listed in subsection (6) of this section, the village shall retain $50.00 in conjunction with the return of any permit fees. (6) Special fees. For individual residential unit owners applying for express permits, there shall be a flat permit fee as set out in the village fee schedule for the following express permit types: a. Residential fence installation. b. Residential shed installation. c. Residential driveway installation. d. Residential patio and private walk installation. e. Residential tear-off roof and re-roof installation. f. Residential deck or pergola installation. g. Residential above-ground swimming pool. h. Residential ventilating and central air conditioning (HVAC) replacement. i. Residential sewer/water service repair or replacement. j. Residential lawn sprinklers. k. Residential electric service revision, including generators. l. Dumpster/screening enclosure. m. Residential water heater replacement. (7) Special technical problems. When applications for permits are filed for buildings or structures of such unusual technical design or magnitude of construction that they may not be fully covered by this article, the code official may refer such plans and specifications to an appropriate, authoritative technical agency, or may retain a properly qualified licensed engineer or registered architect for analysis and recommendations as to safety of design and compliance with this article. The expense involved in obtaining a licensed engineer or architect to review the special conditions shall be reimbursed to the village on a one-to-one ratio. (8) Work without a permit fee. If work commences on any project or construction activity without having first obtained a required building permit, the building permit fee within the overall schedule of permit fees shall be increased by 50 percent, but the total amount for said fee shall not exceed $500.00.
(Code 1976, § 6-1.5; Ord. No. O-204-07, §§ 5—7, 12-10-2007, eff. 1-1-2008; Ord. No. O-127-09, § 1, 11-16-2009; Ord. No. O-69-11, § 1, 6-20-2011, eff. 7-18-2011; Ord. No. O-21-15, § 1, 3-16-2015; Ord. No. O-93-18, 8-13-2018, eff. 1-1-2019; Ord. No. O-102-19, 12-2-2019; Ord. No. O-94-20, 12-7-2020; Ord. No. O-111-24, exh. A(6-1.5), 12-2-2024; Ord. No. O-114-25, § 1(Exh. A), 12-1-2025)
Ask a question about Palatine law
Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.