§ 17-119 — Legislative findings
Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-119
Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/5c91ce2d-de10-400e-9e80-cd9206fc40e3
Sec. 17-119. - Legislative findings.
This Article meets the post construction stormwater runoff requirements of the Indiana Department of Environmental Management (IDEM) Rule 13 (327 IAC 15-13-16). As a result, the purpose of this local ordinance is to safeguard persons, protect property, prevent damage to the environment and promote public welfare by guiding, regulating, and controlling the design, construction, use, and maintenance of any development or other activity which disturbs or breaks the topsoil or results in the movement of earth on land within the City of South Bend MS4 area (includes the Ivy Tech Community College Campus). (1) Applicability. This Article shall be applicable to all subdivision or site plan applications. The Article also applies to land development activities that are smaller than the minimum applicability criteria if such activities are part of a larger common plan of development that meets the following applicability criteria, even thought multiple separate and distinct land development activities may take place at different times on different schedules. In addition, all plans must also be reviewed by the City of South Bend's Division of Engineering to ensure that established water quality standards will be maintained during and after development of the site and that post construction runoff levels are consistent with any local and regional watershed plans. To prevent the adverse effects of stormwater runoff, the City of South Bend has developed a set of performance standards that must be met at new development sites. These standards apply to any construction activity disturbing one (1) acre (forty-three thousand five hundred sixty (43,560) square feet) or more of land. The following activities may be exempt from these stormwater performance criteria: a. Additions or modification to existing single-family structures. b. Developments that do not disturb one (1) acre or more, provided they are not part of a larger common development plan. c. Repairs to any storm water treatment practice deemed necessary by the City of South Bend. When a site development plan is submitted, decisions on permitting and on-site stormwater requirements shall be governed by special storm water sizing criteria established in IDEM's Indiana Stormwater Quality Manual and the City of South Bend Design and Construction Standards. Final authorization of all development projects will be determined after a review by the City of South Bend's Division of Engineering. The City of South Bend also reserves the right to request submission of a site development plan if the City Engineer or his designee deems necessary and notifies the site owner in writing. (2) Compatibility with Other Permit and Ordinance Requirements. This Article is not intended to interfere with, abrogate, or annul any other ordinance, rule or regulation, statute, or other provision of law. The requirements of this Article should be considered minimum requirements, and where any provision of this Article imposes restrictions different from those imposed by any other ordinance, rule or regulation, or other provision of law, whichever provisions are more restrictive or impose higher standards shall be considered to take precedence. (3) Severability. If the provisions of any article, section, subsection, paragraph, subdivision, or clause of this Article shall be judged invalid by a court of competent jurisdiction, such order of judgment shall not affect or invalidate the remainder of any article, section, subsection, paragraph, subdivision or clause of this Article.
(Ord. No. 9684-01, § I, 7-10-06)
Ask a question about South Bend law
Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.
