§ 17-122 — Erosion and sediment control plan

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-122

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/56bf8f26-a800-48e2-afa5-031f2738a10c

Sec. 17-122. - Erosion and sediment control plan.

(a) Plan requirements. (1) A one (1) inch equals two hundred (200) feet topographic, natural resources, base map identifying soils, existing surface water drainage, current land use (including existing structures), locations of roads, utilities, and easements, and significant man-made and natural features not otherwise shown. (2) Two (2) sets of full size and one (1) set of eleven-inch by seventeen-inch (11"×17") plans of the project site (can be on multiple sheets) including the legal description and location of all lots and proposed site improvements. These plans should also show proposed locations of soil stockpiles, borrow, and/or disposal areas. (3) A sequence of construction for the development site, including stripping and clearing, rough grading, construction of utilities, infrastructure, and buildings, and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, the installation of temporary erosion and sediment measures, and establishment of permanent vegetation. (4) Seeding mixtures and rates, types of sod, method of seedbed preparation, expected seeding dates, type and rate of lime and fertilizer application, and kind and quantity of mulching for both temporary and permanent vegetative control measures. (5) Hydrologic and hydraulic design calculations for the pre-development and post-development conditions of the site. (6) A maintenance and repair plan that includes detailed procedures to insure the continued function of all control facilities, including easements and the estimated cost for the periodic inspection of all control facilities. (7) Along with the above guidelines the erosion and site control plan shall meet 327 IAC 15-5 and Article 12 of the City of South Bend Municipal Code Construction Site Stormwater Runoff Control Requirements. (b) Modifications to the plan. (1) Major amendments to the erosion and sediment control plan shall be submitted to the City of South Bend Division of Engineering and shall be processed and approved, or disapproved, in the same manner as the original plans. (2) Field modifications of a minor nature may be authorized with written approval from the City of South Bend's Division of Engineering or appointed representative.

(Ord. No. 9684-06, § I, 7-10-06)