For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-120 — Definitions

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-120

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/8faa0948-ea01-4f92-b69d-e57b40832283

Sec. 17-120. - Definitions.

As used in this Article: Applicant means a property owner or agent of a property owner who has filed an application for a stormwater management permit. Best management practice (BMP) means any land management practice or technique that reduce the velocity or runoff waters, which can result in the deposition of suspended soil. Building means any structure, either temporary or permanent, having walls and a roof designed for the shelter of any person, animal, or property and occupying over one hundred (100) square feet. Clearing means any activity which removes vegetative surface cover. Dedication means the deliberate appropriation of property by its owner for general public use. Detention means the temporary storage of stormwater in a stormwater management practice with the goals of controlling peak discharge rates and providing gravity settling of pollutants. Drainage easement means a legal right granted by a landowner to a grantee allowing the use of private land for stormwater management purposes. Erosion control means any measures that prevent erosion. Erosion and sediment control plan (ESCP) means a set of plans prepared by or under the direction of a licensed professional engineer indicating the specific measures and sequencing to be used for controlling sediment and erosion on a development site before, during, and after construction. This is synonymous with the term "Storm Water Pollution Prevention Plan" in Indiana Department of Environmental Management (IDEM) Rule 5, 327 IAC 15-5 ("Rule 5"). Grading means the excavation or fill of material, including the resulting conditions thereof. Indiana Storm Water Quality Manual means the most recent edition of the manual that refers to stormwater management in the State of Indiana. MS4 means Municipal Separated Storm Sewer System. MS4 operator means the designated MS4 Operator for the City of South Bend. Perimeter control means any barrier that prevents sediment from leaving the site either by filtering sediment-laden runoff, or diverting it to a sediment trap or basin. Phasing means clearing a parcel of land in distinct phases; with the stabilization of each phase before clearing the next. Rain event means any event where precipitation falls on the construction site. Sediment control means any measure(s) that prevent eroded sediment from leaving the site. Site means any parcel of land, or a contiguous combination thereof, where grading work is performed as a single unified operation. Site development permit (SDP) means the permit issued by the municipality for which the construction or alteration of ground improvements and structures for the control of erosion, runoff, and grading. Stop work order means an order issued which requires that all construction activity on a site be stopped.

(Ord. No. 9684-06, § I, 7-10-06)

Ask a question about South Bend law

Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.