§ 17-123 — Design requirements
Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-123
Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/ad09ed2d-bd0d-405d-8cfd-0d8cd6e9fcc2
Sec. 17-123. - Design requirements.
Grading, erosion control practices, sediment control practices, and water way crossings shall meet the design criteria as set forth in the most recent versions of the Indiana Stormwater Quality Manual and The City of South Bend Design and Construction Standards, and shall be adequate to prevent the transportation of sediment from the site to the satisfaction of the City of South Bend. (1) Clearing and grading. a. Clearing and grading of natural resources, such as forests and wetlands, shall not be permitted, except when in compliance with all other chapters of this Code. b. Phasing shall be required on all sites disturbing greater than thirty (30) acres, with the size of each phase to be established by a plan review and approved by the City of South Bend Division of Engineering. c. Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed, stabilized, and inspected. d. Cut and fill slopes shall be no greater than 2:1, except as approved by the City of South Bend's Division of Engineering to meet other community or environmental objectives. (2) Erosion control. a. Soil must be stabilized within five (5) calendar days of clearing or inactivity in construction. b. If vegetative erosion control methods, such as seeding, have not been established within two (2) calendar weeks, the City of South Bend may require that the site be reseeded, or that a non-vegetative option be utilized. c. On steep slopes or in drainage ways, special techniques that meet the design criteria outlined in the Indiana Stormwater Quality Manual shall be used to ensure stabilization. d. At the close of the construction season, the entire site must be stabilized using an approved method. e. Techniques shall be utilized to prevent the blowing of dust or sediment from the construction site. f. Techniques that divert upland runoff past disturbed slopes shall be employed. (3) Sediment controls. a. Sediment controls shall be provided as outlined in the Indiana Stormwater Quality Manual. b. All adjacent properties are to be protected with an approved method. (4) Waterways and watercourses. a. When a wet watercourse must be crossed regularly as part of construction, a temporary stream crossing shall be provided and an approval obtained from the IDNR. b. When in-channel work is completed, the channel shall be stabilized at all times. c. All stormwater conveyance channels shall be designed in accordance with the Indiana Stormwater Quality Manual. d. All pipe and pave channel outlets must be stabilized. (5) Construction site access. a. A temporary access road and properly designed and installed construction entrance shall be provided to the site at all times. b. Other measures may be required at the discretion of the City of South Bend in order to ensure that sediment is not tracked onto public streets by construction vehicles, or washed into storm drains.
(Ord. No. 9684-06, § I, 7-10-06)
Ask a question about South Bend law
Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.