For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.80.030 — Operation of Sand and Gravel Pits and Sanitary Landfill

Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 17.80.030

Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/9610a156-1b84-4108-bc79-320a72c9bb4d

17.80.030 - Operation of Sand and Gravel Pits and Sanitary Landfill.

A. Special Considerations. The proposed operation shall not contribute to soil erosion by water and/or wind, nor shall it adversely affect soil fertility, drainage and lateral support of abutting land or other properties. B. Hours of Operation. In residential districts or within one thousand (1,000) feet thereof, there shall be no operations between 7:00 p.m. and 8:00 a.m. nor on Saturdays, Sundays or legal holidays. C. Fencing. When any open excavation will have depth of ten (10) feet or more and create a slope of more than thirty (30) degrees, there shall be a substantial fence, at least six (6) feet high with suitable gates where necessary, effectively blocking access to the area in which such excavation is located. Such fence shall be located fifty (50) feet or more from the edge of the excavation. D. Slope. The slope of material in any excavation shall not exceed the normal angle of repose or forty-five (45) degrees, whichever is less. E. Access Roads. That portion of an access road within the area of permit and located within five hundred (500) feet of a plot line shall be provided with a dustless surface. F. Minimum Distance from Plot Lines. The top of the natural slope in cut for any excavation and any mechanical equipment shall not be less than fifty (50) feet from any plot line. G. Rehabilitation of the Site. Before a special permit is granted a plan for rehabilitation, showing both existing and proposed final contours, shall be submitted and approved. After any such operations the site shall be made reusable for a use permitted in that district. Where topsoil is removed, sufficient arable soil shall be set aside for retention on the premises and shall be respread over the premises after the operation. The area shall be brought to final grade by a layer of earth of two (2) feet or original thickness, whichever is less, capable of supporting vegetation. The area shall be seeded or sodded in a manner approved by the Governing Body. Fill shall be of a suitable material approved by the Governing Body. H. Performance Bond. Before the issuance of any special permit, the owner shall execute a bond sufficient, in the opinion of the Governing Body, to secure the aforesaid rehabilitation of the site in accordance with the plan specified in subsection (G) of this section. Such bond shall also be approved by the Governing Body as to form, sufficiency and manner of execution, and shall run for the same term as the term of the special permit.

Ask a question about Shawnee law

Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.