§ 17.80.500 — Battery Energy Storage Systems
Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 17.80.500
Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/15435da3-1b4c-4983-9b3c-765a9d5c2123
17.80.500 - Battery Energy Storage Systems.
A. Accessory Use Battery Energy Storage Systems: Principal use of any accessory Battery Energy Storage Systems (BESS) shall be to serve the electricity needs of the applicant property but may, at times, discharge energy into the electric grid. Incidental selling of power back to the electric grid from BESS shall not constitute a commercial use. An accessory BESS installed on a nonconforming lot or use shall not be considered an expansion of the nonconformity. Accessory BESS do not count towards the maximum allowable number of accessory structures in the underlying zoning district. 1. Small Accessory Use Battery Energy Storage Systems: Accessory Battery Energy Storage Systems (BESS) with an aggregate energy capacity of less than six hundred (600) kWh are permitted as an accessory use in all zoning districts. Small accessory BESS shall follow the regulations associated with accessory uses within their underlaying zoning district. 2. Large Accessory Use Battery Energy Storage Systems: Accessory Battery Energy Storage Systems (BESS) with an aggregate energy capacity of greater than six hundred (600) kWh are permitted as an accessory use in all zoning districts with Final Site Plan approval. B. Primary Use Battery Energy Storage Systems: Principal use of any primary Battery Energy Storage Systems (BESS) shall be for the purpose of off-site use through the electrical grid. Primary BESS are permitted in Agricultural and Industrial zoning districts with a Special Use Permit approved by the Governing Body. 1. Height: The total height of a primary Battery Energy Storage System (BESS) enclosure, including any roof-mounted mechanical equipment, shall not exceed sixteen (16) feet. Any dedicated-use building shall be a single story subject to the height restrictions for principal structures in the underlying zoning district, but not to exceed forty-five (45) feet. 2. Setbacks: Setback distances shall be measured from the nearest edge of the perimeter fencing, and shall be greater than or equal to: a. Fifty (50) feet from the property line. b. One hundred (100) feet from any existing dwelling unit or area designated for residential development in local planning documents. 3. Fencing: If the primary Battery Energy Storage System (BESS) is adjacent to property zoned as residential, a perimeter fence is required. All perimeter fences shall be between six (6) and eight (8) feet in height and constructed from solid material. 4. Screening/Landscaping: A primary Battery Energy Storage Systems (BESS) shall be subject to the screening requirements of the underlying zoning district. All screening and landscaping shall be placed outside the perimeter fencing and at least fifteen (15) feet from the nearest BESS enclosure. Screening shall not be subject to setbacks. a. Additional Screening: Screening requirements may be increased or reduced when they are determined to be inadequate based on a legitimate community purpose in keeping with local planning documents. 5. Safety: All primary BESS shall meet the following requirements: a. Access Drive: Primary BESS are required to provide an access drive in case of emergencies. Access drives shall be designed in consultation with Shawnee Fire Department and maintained to enable year-round emergency vehicle access. b. Vegetation: All combustible vegetation or other combustible growth within fifteen (15) feet of a primary BESS enclosure shall be cleared and any tree stumps shall be removed. 6. Performance Standards: Primary BESS shall comply with Chapter 17.58.060 for lighting and noise performance standards. 7. Repair, Augmentation, and Repowering: In addition to repairing or replacing Battery Energy Storage System (BESS) components to maintain the system, a primary BESS may, at any time, be augmented or repowered without the need to submit a new site plan so long as the augmentation or repowering is within the same footprint as the original permit. A proposal to change the project footprint shall be considered a new application. 8. Decommissioning: All primary Battery Energy Storage Systems (BESS) must be properly decommissioned at the end of their useful life. A Decommissioning Plan is required at the time of application, and shall include the following: a. A description of activities for complete physical removal of all BESS components, structures, equipment, security barriers, and transmission lines from site, including who will perform these activities and at what point in time. The description shall also include hazardous material use and removal from the site; b. A description of which above-grade and below-grade improvements will be removed, retained, or restored for viable use of the property consistent with the zoning district; c. A listing of any contingencies for removing an intact operational BESS, and for removing a BESS that has been damaged by fire or another event; d. The projected decommissioning costs, as well as the method of ensuring funds will be available for site decommissioning (in the form of a surety bond, irrevocable letter of credit, or cash deposit); At any time, a BESS owner may execute the most recent approved Decommissioning Plan, or amend the plan, subject to approval from the Planning Division. Decommissioning must be completed within twelve (12) months of abandonment. A primary BESS that has not stored electrical energy for twelve (12) consecutive months shall be considered abandoned. A review of the amount of the performance guarantee based on inflation, salvage value, and current removal costs shall be completed every five (5) years, for the life of the project, and approved by the Planning Division. 9. Application: In addition to the Site Plan requirements found in Chapter 17.56, primary Battery Energy Storage Systems (BESS) applications must include the following: a. A Land Clearing and/or Grading Plan. b. An Equipment Specification Sheet. c. A System Maintenance Plan. d. A Fire and Emergency Response Plan. e. An Environmental Analysis. f. An Augmentation Plan. If applicable, a plan demonstrating, through description and an annotated site plan, the anticipated augmentation phases, including which structures/components are expected to be installed in which time frames. g. A Decommissioning Plan as defined in this chapter. 10. Special Use Permit: Primary Battery Energy Storage Systems (BESS) may be permitted in Agricultural and Industrial zoning districts with a Special Use Permit. The Special Use Permit shall be approved by the Governing Body, subject to the following criteria: a. The public benefits of the proposed BESS justify its construction. Public benefits include, but are not limited to, any contributions to meeting identified energy, capacity, reliability, or resource adequacy needs.
(Ord. 3541, 2025)
Ask a question about Shawnee law
Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.