§ 17.80.100 — Wind Energy Conversion Systems

Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 17.80.100

Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/4b6d0c02-e7cb-49ac-808c-69b25971d583

17.80.100 - Wind Energy Conversion Systems.

For the purposes of this Chapter "wind energy conversion systems (WECS), means any device or combination of devices including, but not limited to, wind chargers, windmills and wind turbines, which converts wind energy into another usable form of energy; the term shall include all associated support structures and transmission lines, and may be an accessory use subject to the following provisions: A. Accessory Use Wind Energy Conversion Systems. Principal use of any Accessory Wind Energy Conversion System (WECS) shall be for power, heat, or cooling systems within the principal (or accessory) structure. Incidental selling of power back to the electric grid from a WECS shall not constitute a commercial use. An accessory WECS installed on a nonconforming lot or use shall not be considered an expansion of the nonconformity. Accessory WECS do not count towards the maximum allowable number of accessory structures in the underlying zoning district. 1. Roof-Mounted Wind Energy Conversion Systems. One (1) roof-mounted Wind Energy Conversion System (WECS) is permitted per lot as an accessory use in all zoning districts. a. Height: Roof-mounted WECS shall not exceed the height of the principal building more than fifteen (15) feet. The roof-mounted WECS will not contribute to the maximum allowable height of a building. 2. Ground-Mounted Wind Energy Conversion Systems: One (1) Ground-mounted Wind Energy Conversion System (WECS) is permitted per lot as an accessory use in all zoning districts. WECS greater than sixty (60) feet in height require a Special Use Permit approved by the Planning Commission. Ground-mounted WECS projects shall use tubular towers and shall be finished in a single, non-reflective, matte finish, white or other neutral color. a. Height: In residential zoning districts, ground-mounted WECS shall not exceed sixty (60) feet in height. In all other zoning districts, the maximum allowable height is one hundred and twenty (120) feet. Minimum blade clearance for accessory WECS is twenty (20) feet. b. Setbacks: The setback between the base of a ground-mounted WECS and the property lines shall be no less than its height. In residential zoning districts, ground-mounted WECS may not be placed in the front yard. c. Self-Supporting Structures: All accessory WECS shall be of monopole construction, no lattice structures shall be permitted. WECS requiring guy wire support shall be limited to lots of one (1) or more acres. All guy posts, poles, or similar anchoring structures shall not be located in the front yard and must maintain a setback of twenty-five (25) feet from the property line. 3. Exception: Non-residential properties may have additional roof-mounted or ground-mounted Wind Energy Conversion Systems (WECS) provided that the use of wind energy is accessory to the primary use of the property. 4. Performance Standards: Accessory Wind Energy Conversion Systems (WECS) shall comply with Chapter 17.58.060 for lighting and noise performance standards. B. Primary Use Wind Energy Conversion Systems: Principal use of any primary Wind Energy Conversion System (WECS) shall be for the purpose of off-site use through the electrical grid. Primary WECS are permitted in Agricultural and Industrial zoning districts with a Special Use Permit approved by the Governing Body. 1. Height: The height of primary Wind Energy Conversion Systems (WECS) shall be reviewed as a part of the Final Site Plan. Blade clearance shall not be less than twenty (20) feet. 2. Setbacks: Setback distance shall be measured from the closest point of the base of the wind turbine to the property line or inhabited structure, and shall be greater than or equal to: a. Right-of-way: One (1) time the height or five hundred (500) feet from the edge of the road right-of-way, whichever is greater; b. Non-participating property: Three (3) times the height or one thousand three hundred (1,300) feet from the property line of a non-participating property, whichever is greater; c. Participating property; Two (2) times the height or eight hundred (800) feet from the property line of a participating property, whichever is greater; 3. Safety: All primary Wind Energy Conversion Systems (WECS) shall meet the following requirements: a. Emergency: A sign containing emergency contact information shall be posted near each WECS. b. Wiring: WECS wiring (including communication lines) shall be buried underground. 4. Performance Standards: In addition to Chapter 17.58.060 for lighting and noise performance standards, primary Wind Energy Conversion Systems (WECS) must comply with the following: a. Visual Impact: Utility-scale WECS projects shall use tubular towers and all utility-scale WECS in a project shall be finished in a single, non-reflective, matte finish, neutral color (including white). A project shall be constructed using WECS components (tower, nacelle, blade) of similar design, size, operation, and appearance throughout the project. b. Shadow Flicker: Shadow flicker shall not exceed thirty (30) hours per year and/or thirty (30) minutes per day measured to the exterior wall of a dwelling or other occupied building on a non-participating parcel. c. Signal Interference: No primary WECS shall be installed in any location where proximity to existing fixed broadcast, retransmission, or reception antennae for radio, television, or wireless phone or other personal communication systems would produce interference with signal transmission or reception. d. Lighting: No WECS tower shall include lighting unless otherwise required by the Federal Aviation Administration or other regulatory agency. 5. Repair, Augmentation, and Repowering: In addition to repairing or replacing Wind Energy Conversion Systems (WECS) components to maintain the system, a primary WECS may, at any time, be augmented or repowered without the need to submit a new site plan so long as the augmentation or repowering is within the same footprint as the original permit. A proposal to change the project footprint shall be considered a new application. 6. Decommissioning: All primary Wind Energy Conversion Systems (WECS) must be properly decommissioned at the end of their useful life. A Decommissioning Plan is required at the time of application, and shall include the following: a. A description of activities for complete physical removal of all WECS components, structures, equipment, security barriers, and transmission lines from site, including who will perform these activities and at what point in time. The description shall also include hazardous material use and removal from the site; b. A description of which above-grade and below-grade improvements will be removed, retained, or restored for viable use of the property consistent with the zoning district; c. A listing of any contingencies for removing an intact operational WECS, and for removing a WECS that has been damaged by fire or another event; d. The projected decommissioning costs, as well as the method of ensuring funds will be available for site decommissioning (in the form of a surety bond, irrevocable letter of credit, or cash deposit); At any time, a WECS owner may execute the most recent approved Decommissioning Plan, or amend the plan, subject to approval from the Planning Division. Decommissioning must be completed within twelve (12) months of abandonment. A primary WECS that has not stored electrical energy for twelve (12) consecutive months shall be considered abandoned. A review of the amount of the performance guarantee based on inflation, salvage value, and current removal costs shall be completed every five (5) years, for the life of the project, and approved by the Planning Division. 7. Application: In addition to the site plan requirements found in Chapter 17.56, primary Wind Energy Conversion Systems (WECS) applications must include the following: a. A Land Clearing and/or Grading Plan. b. An Equipment Specification Sheet. c. A System Maintenance Plan. d. A Shadow Flicker Study. e. A Sound Modeling Study. f. An Environmental Analysis. g. An Avian and Wildlife Impact Analysis. h. An Augmentation Plan. If applicable, a plan demonstrating, through description and an annotated site plan, the anticipated augmentation phases, including which structures/components are expected to be installed in which time frames. i. A Decommissioning Plan as defined in this chapter. 8. Special Use Permit: Primary Wind Energy Conversion System (WECS) may be permitted in Agricultural and Industrial zoning districts with a Special Use Permit. The Special Use Permit shall be approved by the Governing Body, subject to the following criteria: a. The public benefits of the proposed WECS justify its construction. Public benefits include, but are not limited to, any contributions to meeting identified energy, capacity, reliability, or resource adequacy needs. C. Principal use for WECS. The principal use of the WECS shall be the powering of the primary structure. Incidental selling of power back to the electric grid from an accessory structure shall not constitute a commercial use. A WECS located in a residential zoning district and in the agricultural zoning district not used as a wind farm shall not produce in excess of ten (10) Kws. A WECS in an office, commercial, and industrial zoning district shall not produce in excess of one hundred (100) Kws. If principal use of a series of WECS units as a wind farm to generate power back to the electric grid may be approved with a special use permit in the agricultural or industrial zoning districts provided the wind farm is located on platted land of at least one hundred twenty (120) acres under the same ownership. WECS used in a wind farm may be a large/utility scale wind turbine that has a rated capacity of more than one hundred (100) Kw. D. Number of Units. One (1) WECS may be located on a residentially zoned property as an accessory use. A WECS may be in addition to any other accessory structure located on the property. One (1) WECS may be located on properties zoned other than residential. More than one (1) WECS may be placed on properties zoned other than residential may be approved with a special use permit, provided the cumulative production of energy does not exceed one hundred (100) Kw, except for wind farm operations. E. Location. A WECS may be located in any zoning district within the City as an accessory use provided all conditions provided in this Chapter are satisfied. The WECS may not be located in any front yard, and may be located within a side yard, provided all conditions in this Chapter are satisfied, upon granting of a variance by the Board of Zoning Appeals. F. Height of structures and setbacks. A ground mounted WECS shall not exceed sixty (60) feet in height in a residential zoning district, as a permitted use, and shall meet all other requirements set forth in this Chapter. The Planning Commission may consider a greater height of the WECS with a special use permit provided a setback greater than or equal to the overall blade tip height of the WECS to the ground from any property line is maintained, and the size of the lot exceeds two (2) acres in size. The maximum height of a WECS in a commercial, industrial, or office zoning district shall be determined by the maintenance of a setback from all property lines at least a height greater than or equal to the overall blade tip height of the WECS to the ground, a WECS meeting these standards shall be an allowed use The Planning Commission and Governing Body with a special use permit may consider a taller WECS in these zoning districts provided a setback from all commercial, industrial and office zoned property lines at least two-thirds (⅔) the height of the structure measured to the overall blade tip height is maintained, and a setback equal to the overall blade tip height of the WECS to the ground from any agriculturally or residentially zoned property is maintained. In no event shall the overall blade tip height of the WECS exceed one hundred twenty (120) feet in the commercial, industrial and office zoning districts. A taller WECS may be allowed in the industrial zoning district if part of a wind farm, and is subject to a special use permit. All setback measurements are made from the center of the base of the structure. A roof mounted WECS structure no greater than fifteen (15) feet in height may be placed on a structure, provided the overall height of the structure and the mounted WECS does not exceed the above mentioned requirements for the zoning district in which it is located. Except as provided by the above mentioned requirements for a special use permit, no additional variances from the above mentioned requirements may be given. G. WECS in Agricultural districts. A ground mounted WECS shall not exceed one hundred twenty (120) feet in height measured to the overall blade tip height of the WECS to the ground. A taller WECS may be permitted with approval of a special use permit. In all cases, the setback from the center of the base of the structure to adjoining property lines shall be equal to the overall blade tip height of the WECS to the ground. H. Self-supporting structures and anchoring. All tower structures shall be of monopole construction unless attached to a structurally reinforced roof where such support is not warranted. No lattice structures shall be permitted. Towers requiring guy wire support shall be limited to lots of one (1) or more acres and all guy posts, poles, or similar anchoring structures shall not be located in any required front yard, and shall be located at least twenty-five (25) feet from all side and rear lot lines. I. Noise. The noise generated by a WECS shall not exceed sixty (60) dbA at the property line. J. Materials. A neutral, including white, non-reflective exterior color designed to blend with the surrounding environment shall be required for all WECS. K. Screening. All appurtenant structures to the WECS shall be screened from view (except for wind farms) by fencing and vegetation, and/or located in an underground vault. L. Lighting. A WECs shall be lighted only if required by the Federal Aviation Administration. Lighting of other parts of the WECS, such as appurtenant structures, shall be limited to that required for safety and operational purposes, and shall be reasonably shielded from abutting properties. M. Signage prohibited. Commercial advertising is strictly prohibited. Signs shall be limited to the manufacturers or installer's identification, and appropriate warning signs (e.g. electrical hazard or high voltage) placed on the wind turbine tower(s), electrical equipment and the wind turbine. N. Minimum Blade Clearance. The blade tip clearance for micro wind turbines (those that produce ten (10) Kw or less) shall, at its lowest point, have a ground clearance of not less than fifteen (15) feet. The minimum blade clearance for any other wind turbine shall be thirty (30) feet.

(Ord. 3541, 2025)