§ 17.80.200 — Solar Energy Collection Systems
Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 17.80.200
Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/848b8933-ae8a-4eea-876c-2587cf553707
17.80.200 - Solar Energy Collection Systems.
The intent of this section is to facilitate the use of solar energy in all zoning districts, and to establish performance standards that preserve neighborhood character and mitigate potential impacts to surrounding property. This section is not intended to protect or guarantee a property owner's access to sunlight. For the purposes of this chapter the term solar energy collection systems (SECS) will apply to thin photovoltaic cells, solar energy conversion systems and other solar apparatus that collect sunlight energy to generate electricity, to heat or cool a structure, or to heat a water source. A. Accessory Use Solar Energy Conversion Systems: Principal use of any accessory Solar Energy Conversion Systems (SECS) shall be for power, heat, or cooling systems within the principal (or accessory) structure. Incidental selling of power back to the electric grid from a SECS shall not constitute a commercial use. An accessory SECS installed on a nonconforming lot or use shall not be considered an expansion of the nonconformity. Accessory SECS do not count towards the maximum allowable number of accessory structures in the underlying zoning district. 1. Roof Mounted Solar Energy Conversion Systems: Roof-mounted Solar Energy Conversion Systems (SECS) are permitted as an accessory use in all zoning districts. a. Height: SECS with fixed tilt may not extend more than thirty (30) inches from the roof plane. Sun-tracking SECS must not extend more than forty-eight (48) inches from the roof and are prohibited on the front (street-facing) side of homes in residential zones. 2. Ground Mounted Solar Energy Conversion Systems: Ground-mounted Solar Energy Conversion Systems (SECS) are permitted as an accessory use in all zoning districts. a. Height: Ground-mounted SECS shall not exceed ten (10) feet in height, measured from the ground to the top of the system when oriented at maximum tilt. b. Setbacks: Ground-mounted SECS cannot be placed in the front or side yard and must maintain a ten-foot setback from all property lines. c. Lot Coverage: Lot coverage for ground-mounted SECS may not exceed fifty (50) percent of the square footage of the primary building's footprint on the lot. 3. Exemptions: A Solar Energy Conversion System (SECS) used to power a single device or specific piece of equipment such as a lawn ornament, lights, weather station, thermometer, clock, well pump or other similar singular device is exempt from the requirements in this chapter. B. Primary Use Solar Energy Conversion Systems: Principal use of any Primary Solar Energy Conversion System (SECS) shall be for the purpose of off-site use through the electrical grid. Primary SECS are permitted in Agricultural and Industrial zoning districts with a Special Use Permit approved by the Governing Body. 1. Height: Total height for primary Solar Energy Conversion System (SECS) shall not exceed twenty (20) feet. 2. Setbacks: Setback distances shall be measured from the nearest edge of a solar array at minimum tilt, and shall be greater than or equal to: a. The underlying zoning district's setback minimums for principal buildings or structures. b. One hundred (100) feet from any existing dwelling unit or area designated for residential development in local planning documents. 3. Fencing: If the primary Solar Energy Conversion System (SECS) is adjacent to property zoned as residential, a perimeter fence is required. All perimeter fences shall be between six (6) and eight (8) feet in height and constructed from solid material. 4. Screening/Landscaping: A primary Solar Energy Conversion System (SECS) shall be subject to the screening requirements of the underlying zoning district. All screening and landscaping shall be placed at least fifteen (15) feet from the nearest solar array. Screening shall not be subject to setbacks. a. Ground Cover: A primary SECS shall include the installation of ground cover vegetation maintained for the duration of operation until the site is decommissioned. b. Additional Screening: Screening requirements may be increased or reduced when they are determined to be inadequate based on a legitimate community purpose in keeping with local planning documents. 5. Safety: All primary Solar Energy Conversion System (SECS) shall meet the following requirements: a. Access Drive: If required, access drives shall be designed to minimize the extent of soil disturbance, water runoff, and soil compaction on premises. b. Wiring: SECS wiring (including communication lines) shall be buried underground. 6. Performance Standards: Primary SECS shall comply with Chapter 17.58.060 for lighting and noise performance standards. 7. Repair, Augmentation, and Repowering: In addition to repairing or replacing Solar Energy Conversion Systems (SECS) components to maintain the system, a primary SECS may, at any time, be augmented or repowered without the need to submit a new site plan so long as the augmentation or repowering is within the same footprint as the original permit. A proposal to change the project footprint shall be considered a new application. 8. Decommissioning: All primary Solar Energy Conversion Systems (SECS) must be properly decommissioned at the end of their useful life. A Decommissioning Plan is required at the time of application, and shall include the following: a. A description of activities for complete physical removal of all SECS components, structures, equipment, security barriers, and transmission lines from site, including who will perform these activities and at what point in time. The description shall also include hazardous material use and removal from the site; b. A description of which above-grade and below-grade improvements will be removed, retained, or restored for viable use of the property consistent with the zoning district; c. A listing of any contingencies for removing an intact operational SECS, and for removing a SECS that has been damaged by fire or another event; d. The projected decommissioning costs, as well as the method of ensuring funds will be available for site decommissioning (in the form of a surety bond, irrevocable letter of credit, or cash deposit); At any time, a SECS owner may execute the most recent approved Decommissioning Plan, or amend the plan, subject to approval from the Planning Division. Decommissioning must be completed within twelve (12) months of abandonment. A primary SECS that has not stored electrical energy for twelve (12) consecutive months shall be considered abandoned. A review of the amount of the performance guarantee based on inflation, salvage value, and current removal costs shall be completed every five (5) years, for the life of the project, and approved by the Planning Division. 9. Application: In addition to the site plan requirements found in Chapter 17.56, primary Solar Energy Conversion Systems (SECS) applications must include the following: a. A Land Clearing and/or Grading Plan. b. An Equipment Specification Sheet. c. A System Maintenance Plan. d. A Ground Cover Maintenance Plan. e. An Environmental Analysis. f. An Augmentation Plan. If applicable, a plan demonstrating, through description and an annotated site plan, the anticipated augmentation phases, including which structures/components are expected to be installed in which time frames. g. A Decommissioning Plan as defined in this chapter. 10. Special Use Permit: Primary Solar Energy Conversion System (SECS) may be permitted in Agricultural and Industrial zoning districts with a Special Use Permit. The Special Use Permit shall be approved by the Governing Body, subject to the following criteria: a. The public benefits of the proposed SECS justify its construction. Public benefits include, but are not limited to, any contributions to meeting identified energy, capacity, reliability, or resource adequacy needs. C. All SECS shall comply with the City of Shawnee's adopted codes, and permits shall be obtained prior to installation. D. Primary use of any SECS in residential or agricultural zoning districts shall be for power, heat, or cooling systems within the principal (or accessory) structure. Incidental selling of power back to the electric grid from a SECS shall not constitute a commercial use. E. Installation of SECS on a sloped roof. SECS mounted on the front (street) side of a sloped roof shall be mounted parallel with the roof plane and shall not extend more than thirty (30) inches out from the roof plane. SECS mounted on the back side of a sloped roof can be of tilt-up design, but shall not extend more than forty-eight (48) inches above the roof plane. In no case shall an SECS extend above the roof peak. F. Installation of SECS on a flat roof. When SECS are located on a flat roof with no parapet wall, the collector panels shall be mounted parallel with the roof so their view is minimized. SECS collector panels may be located anywhere on flat roofs with adequate parapet height to screen the view of said collector panels from adjacent streets. Tilt-up design collector panels are allowed on flat roofs with parapet walls, but the collector panel shall not extend above the top of the parapet wall. G. Within commercial and industrial zoning districts, SECS may be mounted on the side and/or back wall of a building provided Site Plan approval is granted by the Planning Commission. Wall-mounted solar collector panels may not extend more than forty-eight (48) inches beyond the wall plane, and shall encroach no more than forty-eight (48) inches into any required side or rear yard area. Collector panels shall not extend above the wall on which they are mounted. H. Ground-mounted SECS in residential and agricultural zoning districts. Ground-mounted SECS shall be located in the rear yard and shall be setback a minimum of ten (10) feet from any side or rear property line. Ground-mounted SECS shall not exceed six (6) feet in height from finished grade. For residential lots less than one (1) acre in size, the surface area of the ground-mounted SECS shall not exceed two percent (2%) coverage of total lot area, with a maximum coverage of two hundred (200) square feet. For residential lots one (1) acre or larger in size, the surface area of the ground-mounted SECS shall not exceed two percent (2%) coverage of the total lot area, with a maximum lot coverage of one thousand two hundred (1,200) square feet. All utility lines service the SECS shall be placed underground. Ground-mounted SECS are exempt from accessory structure provisions found in SMC Chapter 17.60. I. Ground-mounted SECS in commercial and industrial zoning districts shall require Site Plan approval by the Planning Commission, and shall be accessory to the principal building use. SECS in commercial and industrial areas shall meet the bulk setback requirements of said zoning district. Height and surface area of grounded-mounted SECS in commercial and industrial areas shall be as approved by the Planning Commission. The Planning Commission may require fences, landscaping and/or berms to screen ground-mounted SECS from adjacent streets. All related utility lines shall be placed underground. J. SECS may be attached to parking lot light poles to provide electricity for the fixture. The SECS may be of tilt design, but in no case shall the SECS extend more than three (3) feet above the top of the light fixture. Solar collector panels on light poles shall be painted to match the color of the light pole and fixture.
(Ord. 3541, 2025)
Ask a question about Shawnee law
Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
