§ 38.600.150 — Flood hazard evaluation
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.600.150
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/8bdfa6f6-612d-4c1a-bee6-b40f2f9f096f
Sec. 38.600.150. - Flood hazard evaluation.
A. Except as provided in subsection A.2 of this section, if any portion of a proposed development contains a watercourse or drainway draining an area of 25 square miles or more, and regulated flood hazard areas under 38.600.110 have not been designated or identified, then the development applicant shall complete a detailed flood study to delineate the 100-year floodplain and floodway of the watercourse or drainway in accordance with applicable regulations, standards, and technical guidance provided by DNRC under its state program for delineation of floodplains and floodways authorized by MCA 76-5-201. 1. The detailed flood study shall be prepared and certified by a professional engineer. 2. The requirement to conduct a detailed flood study may be waived by the floodplain administrator if the development applicant provides written communication from DNRC stating that DNRC is unwilling or unable to provide technical assistance in the production of a detailed flood study meeting the applicable regulations and standards DNRC may have for this purpose. If the detailed flood study is waived by the floodplain administrator, the development applicant shall prepare a flood hazard evaluation report in conformance with subsection C of this section, which shall be provided with a preliminary plat or site plan application. B. If any portion of a proposed development contains a watercourse or drainway draining an area less than 25 square miles, and regulated flood hazard areas under 38.600.110 have not been designated or identified, then, except as provided in B.1 below, the development applicant shall prepare a flood hazard evaluation report in conformance with subsection C below, which shall be provided with a preliminary plat or site plan application. 1. The requirement to provide a flood hazard evaluation report may be waived by the floodplain administrator if the development applicant demonstrates to the satisfaction of the floodplain administrator that the base flood discharge of the watercourse will not adversely affect the land proposed for development at the time of concept site plan or subdivision pre-application plan. C. Contents of the flood hazard evaluation report shall include the following information at a minimum: 1. Certification by a professional engineer that the flood hazard evaluation report is prepared in accordance with this section; 2. Description of any mitigation required to protect the proposed development and adjacent lands from 100-year flood hazards; 3. Scaled plan view exhibit(s) showing the following: watercourses and drainways, property boundaries, existing topographic contours, proposed grading and drainage contours, existing (pre-project) 100-year floodplain boundary, proposed (post-project) 100-year floodplain boundary, and proposed project improvements. Exhibit(s) shall be neat and orderly and contain a linetype legend, north arrow, and drawing scale; 4. Hydrologic analysis performed in accordance with standard engineering practices containing at a minimum: exhibit(s) depicting delineation of overall contributing drainage basin and individual sub-basins, determination of base flood discharge, narrative describing the basin delineation approach and hydrologic method(s) used in discharge determination, and any supporting digital files and outputs produced for the hydrologic analysis; 5. Hydraulic analysis performed in accordance with standard engineering practices containing at a minimum: hydraulic modeling of the base flood discharge for existing conditions (pre-project) and proposed conditions (post-project), scaled plan view exhibit(s) depicting modeled cross sections, narrative describing hydraulic model development and data sources used for critical inputs, description of existing and proposed hydraulic structures, model outputs of water surface elevation in both profile and cross section view, and digital model files; and 6. The report shall be formatted as a PDF document and include all digital supporting files. D. The floodplain administrator must review and approve all studies and reports required under this section and may require additional information from the applicant prior to approval.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.
