§ 38.600.280 — Waiver of floodplain permit requirements prior to undertaking emergency repair or replacement or temporary protective measures
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.600.280
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/26ebd340-6cf5-4dd2-9e55-1c284b1d2a8f
Sec. 38.600.280. - Waiver of floodplain permit requirements prior to undertaking emergency repair or replacement or temporary protective measures.
A. This division is not intended to prevent a person or entity from taking temporary protective measures necessary to safeguard life, buildings, or structures during periods of flooding emergency. A person or entity shall make a reasonable effort to notify the floodplain administrator prior to initiating such temporary protective measures within the regulated flood hazard area. If prior notice is not practical, a person or entity shall provide notice to the floodplain administrator in all cases no later than five days after the temporary protective measure was undertaken. Temporary protective measures shall not be located in the channel of the regulatory floodway or increase the flood hazard to others, and shall be entirely removed upon cessation of the flooding emergency. B. Emergency repair and replacement of severely damaged public transportation facilities, public water and sewer facilities, public utility electricity and natural gas distribution facilities, and flood control works may be authorized and floodplain permit requirements waived prior to undertaking such emergency work if: 1. Upon notification and prior to emergency repair and/or replacement, the floodplain administrator determines that an emergency condition exists warranting immediate action; and 2. The floodplain administrator agrees upon the nature and type of proposed emergency repair and/ or replacement. 3. Authorization to undertake such emergency repair and replacement work may be given orally if the floodplain administrator believes that a written authorization would unduly delay the emergency works. Such oral authorization must be followed by a written authorization describing the emergency condition, the type of emergency work agreed upon, and a statement that oral authorization had been previously given. C. Nothing in this section impairs or abrogates the authority of the floodplain administrator from requiring a floodplain permit be obtained retroactively by a person or entity undertaking emergency repair, replacement, or temporary protective measures upon cessation of the emergency conditions that gave rise to the emergency repair, replacement, or temporary protective measures. The floodplain administrator may require the permittee to complete remedial work or activities necessary to achieve compliance with this division.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)