For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38.600.260 — Requirements for uses, activities, and artificial obstructions permitted in the regulatory floodway subject to issuance of a floodplain permit

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.600.260

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/65fa73dd-9d18-4a45-8779-a3ca3e649daf

Sec. 38.600.260. - Requirements for uses, activities, and artificial obstructions permitted in the regulatory floodway subject to issuance of a floodplain permit.

A. When a site specific exemption or relaxation of the standards of 38.620 allow utilization of a portion of the regulated flood hazard area, the uses, activities and artificial obstructions contained in this section, including alterations and substantial improvements to existing artificial obstructions, may be permitted in the regulatory floodway subject to the issuance of a floodplain permit by the floodplain administrator. B. All uses, activities and artificial obstructions permitted in the regulatory floodway shall be designed and constructed to minimize flood damage and ensure they do not adversely affect the flood hazards of other properties or be swept downstream to the injury of others. C. The applicant must assure that all uses, activities and artificial obstructions do not reduce the carrying capacity of the regulatory floodway by: 1. Providing a regulatory floodway encroachment analysis, prepared and certified by a professional engineer, demonstrating that the use, activity, or artificial obstruction does not cause an increase to the existing base flood elevation of more than 0.00 feet ("no-rise") and does not significantly increase the velocity of flow. Except as provided in a. below, the no-rise analysis shall be prepared in accordance with FEMA guidance for no-rise certifications for developments in regulatory floodways. a. At the discretion of the floodplain administrator, a different approach to demonstrate and certify no-rise may be allowed given the scope and nature of the proposed use, activity, or artificial obstruction. The approach used shall be acceptable to the floodplain administrator and be performed in accordance with standard engineering practice. 2. Providing a conditional letter of map revision approved by FEMA, the application for which must first be supported by the floodplain administrator and the DNRC subject to this section, for any use, activity, or artificial obstruction that causes an increase to the existing base flood elevation of more than 0.00 feet, or significantly increases the velocity or flow of the watercourse or drainway, or substantially alters the location of the regulatory floodway. a. A conditional letter of map revision is a prospective alteration of the regulated flood hazard area and is subject to MCA 76-5-203. Alterations to the regulatory floodway must be designed and delineated so as to carry the waters of the base flood without increasing the base flood elevation more than 0.50 feet at any point. Written support to file a conditional letter of map revision application with FEMA shall be obtained from DNRC and the floodplain administrator by the applicant providing the following information to DNRC and the floodplain administrator: (1) Certification that no buildings are located in areas impacted by increased base flood elevations; (2) Information demonstrating that alternative designs or approaches that do not cause an increase to the base flood elevation are not feasible; (3) Any other information required by DNRC or the floodplain administrator to gain support for the filing of a conditional letter of map revision application with FEMA. D. Substantial improvement to existing buildings and alteration of existing structures may be permitted, provided that: 1. All applicable requirements in 38.600.270 are met; 2. The existing building or structure shall not be elevated by means of new or additional fill; and 3. An alteration to expand the horizontal dimensions of an existing building is not occurring. E. Watercourse crossings for pedestrian and transportation facilities may be permitted, provided that: 1. Crossings shall be generally oriented as perpendicular to the direction of flow as practicable; 2. Footings for bridge piers and abutments shall be buried below the maximum calculated depth of scour during the base flood discharge as calculated and certified by a professional engineer; 3. Where failure or interruption of public transportation facilities would result in danger to public health or safety, and wherever practicable: a. Bridge low chord elevations shall have at least two feet of freeboard above the base flood elevation; b. Culverts shall be designed to pass the base flood discharge and provide at least two feet of freeboard to the crossing surface; and 4. Except for those public bridges maintained by the Montana Department of Transportation, bridges for public transportation facilities shall meet applicable design and construction standards established by Gallatin County by authority of MCA 7-14-2204. F. Limited filling for transportation facility embankments not in connection with watercourse crossings may be permitted, provided that: 1. Fill placed is a suitable material for the transportation facilities; 2. Reasonable alternate transportation routes outside the regulatory floodway are not available; and 3. The floodway encroachment is located as far from the stream channel as possible. G. Buried or suspended utility transmission and service lines may be permitted, provided that: 1. Suspended utility lines are designed such that the lowest point of the suspension is at least six feet higher than the base flood elevation; 2. Towers, poles, and other appurtenant structures are designed and placed to withstand and offer minimal obstruction to flood flows; 3. Alternatives routes, directional drilling, and aerial routes are considered when practicable; and 4. Utility transmission and service lines carrying toxic or flammable materials are buried to a depth of at least twice the maximum scour depth for the base flood discharge as calculated and certified by professional engineer. H. Storage of materials and equipment not otherwise prohibited may be permitted, provided that: 1. The material or equipment is not subject to damage by flooding and is properly anchored to prevent flotation or downstream movement; or 2. The material or equipment is readily removable within the limited time available after flood warning. I. Construction or alteration of surface water diversion structures may be permitted, provided that: 1. Potential erosion from a base flood shall be minimized; and 2. A professional engineer shall design and certify that any permanent diversion structure in the watercourse or drainway can withstand hydrodynamic, hydrostatic, buoyancy, and scour forces associated with the base flood discharge as well as ice damage and debris impacts. J. Construction or alteration of levees and floodwalls may be permitted, provided that: 1. A professional engineer shall design and certify that the levee or floodwall can withstand hydrodynamic, hydrostatic, buoyancy, and scour forces associated with the base flood discharge as well as ice damage and debris impacts; 2. Materials used for construction are suitable materials designed to withstand the base flood discharge; 3. Constructed height shall be at least three feet higher than the base flood elevation; 4. All state and federal levee and floodwall engineering and construction standards are met; and 5. If the levee or floodwall protects structures of more than one landowner, it shall be publicly owned and maintained. K. Streambank, pier and abutment stabilization or protection projects may be permitted, provided that: 1. A professional engineer shall design and certify that the project can withstand hydrodynamic, hydrostatic, buoyancy, and scour forces associated with the base flood discharge; 2. Materials used and construction methods employed are the least environmentally damaging practicable for the proposed application; 3. Vegetative components, if any, must be established and mature within five years of installation, or other time frame as may be required by the floodplain administrator, and once established and mature do not require substantial yearly maintenance; 4. If materials for the project are designed to biodegrade or erode over time they shall not fail catastrophically to the impact of others and the design amount and rate of erosion shall be similar to what existing stable natural streambanks experience during the base flood discharge; and 5. Potential erosion upstream, downstream, across from or adjacent to the project site during the base flood discharge shall not be increased beyond the erosion rate of existing stable natural streambanks. L. Channelization projects may be permitted, provided that: 1. The requirements of subsection K of this section shall be met; and 2. The excavation and construction of the stream channel is for the purpose of altering or relocating a watercourse or drainway and diverting the entire flow of the stream, or a portion thereof, from its presently established course and shall accommodate and not increase the magnitude or velocity of the base flood discharge; 3. A conditional letter of map revision must be approved by FEMA pursuant to subsection C.2 above. M. Stream and bank restoration projects may be permitted, provided that: 1. The purpose of the project is to reestablish the terrestrial and aquatic attributes of a natural stream and is not for the protection of a structure or a streambank stabilization project; and 2. The requirements of subsections K and L of this section are satisfied, except for the requirement to obtain a conditional letter of map revision, which may not be required in all instances depending upon the extent and nature of the stream or bank restoration project. N. Dams may be permitted, provided that: 1. Design and construction shall be in accordance with the Montana Dam Safety Act, MCA 85-15101 et seq.; 2. The project shall not increase the flood hazards downstream either through operational procedures or improper hydrologic or hydraulic design; and 3. A conditional letter of map revision must be approved by FEMA pursuant to subsection C.2 above.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.