For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 40.03.1110 — Accidental discharges; notice to employees; control of slug discharges

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 40.03.1110

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/29c7e4e9-9028-4522-8954-794a4d881ef9

Sec. 40.03.1110. - Accidental discharges; notice to employees; control of slug discharges.

A. Each user with the potential to contribute prohibited substances as outlined in section 40.03.930, shall provide protection from accidental discharge of prohibited materials or other substances regulated by this division. Facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the user's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the engineer for review, and shall be approved by the engineer before construction of the facility. No user shall introduce industrial wastes into the system until accidental discharge procedures have been approved by the city. Review and approval of such plans and operating procedures shall not relieve the industrial user from the responsibility to modify the user's facility as necessary to meet the requirements of this division. In the case of an accidental discharge, it is the responsibility of the user to immediately telephone and notify the POTW treatment plant of the incident. The notification shall include location of discharge, type of waste, concentration and volume, and corrective actions. B. Within five days following an accidental discharge, the user shall submit to the engineer a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any civil or criminal penalties or other liability which may be imposed by this division or other applicable law. C. Each user shall permanently post on the user's bulletin board or other prominent place advising employees whom to call in the event of a dangerous discharge. Each user shall advise all employees who may cause or suffer such a dangerous discharge to occur of the emergency notification procedure. D. The city may evaluate, at any time, whether each significant industrial user needs a plan to control slug discharges. If the city decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements: 1. A description of discharge practices, including non-routine batch discharges; 2. A description of stored chemicals; 3. Procedures for immediately notifying the POTW treatment plant of slug discharges, including any discharge that would violate a prohibition in section 40.03.930; and 4. If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training and the building of containment structures or equipment.

(Code 1982, § 13.28.220; Ord. No. 1184, § 1, 1985; Ord. No. 1390, § 7, 1994)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.