§ 40.03.1160 — Reporting and compliance requirements
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 40.03.1160
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/1fdc22be-4e0a-45c0-adde-1fe5fa1b0cb0
Sec. 40.03.1160. - Reporting and compliance requirements.
A. All significant industrial users required to meet categorical pretreatment standards must submit the reports required in 40 CFR 403.12. All reports shall be based on sampling and analysis performed during the period covered by the report, and performed in accordance with the techniques described in 40 CFR part 136 and amendments thereto. All reports shall be signed by an authorized representative of the industrial user and certified by a qualified professional. All industrial users that have permits or that have the potential to discharge prohibited substances or specific pollutants that may cause a significant impact on the POTW shall submit to the utilities director semiannual compliance reports at the times designated on the permit, and containing information and data as required by the permit, including but not limited to the following: 1. The name and address of the industrial user including the name of the operator and owners; 2. Any environmental control permits held by or for the industrial user; 3. A brief description of the nature and average rate of production and standard industrial classification of the operation carried out by the industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes; 4. Building plans or details that indicate all points of discharge to the city sewer system from the regulated process; 5. New sources. All new sources subject to existing categorical pretreatment standards shall submit a report within 90 days from the date of first discharge demonstrating actual and continuing compliance with those standards; 6. Report on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to pretreatment standards and requirements shall submit to the control authority a report containing the information described in paragraphs A.1—9 of this section. For industrial users subject to equivalent mass or concentration limits established by the control authority in accordance with the procedures in § 40.03.1115, this report shall contain a reasonable measure of the user's long term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. 7. Measurement of pollutants. a. The user shall identify the pretreatment standards applicable to each regulated process; b. In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or control authority) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations. In cases where the standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard; c. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph; d. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of §403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with §403.6(e) this adjusted limit along with supporting data shall be submitted to the control authority; e. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR part 136 and amendments thereto. Where 40 CFR part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the administrator determines that the part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the administrator; f. The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; g. The baseline report shall indicate the time, date and place, of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW; 8. Certification. A statement, reviewed by an authorized representative of the industrial user and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; and 9. Compliance schedule. If additional pretreatment and/or O and M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O and M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. a. Where the industrial user's categorical pretreatment standard has been modified by a removal allowance (§403.7), the combined wastestream formula (§403.6(e)), and/or a fundamentally different factors variance (§403.13) at the time the user submits the required report, the information required by this section shall pertain to the modified limits. b. If the categorical pretreatment standard is modified by a removal allowance (§403.7), the combined wastestream formula (§403.6(e)), and/or a fundamentally different factors variance (§403.13) after the user submits the report required by this section, any necessary amendments to the information requested by this section shall be submitted by the user to the control authority within 60 days after the modified limit is approved. 10. Compliance schedule for meeting categorical pretreatment standards. The following conditions shall apply to the schedule required by this section: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable categorical pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). b. No increment referred to in this section shall exceed nine months. c. Not later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the control authority including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the control authority. 11. If sampling performed by a user indicates a violation, the user must notify utilities director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to pretreatment coordinator within 30 days after becoming aware of the violation. Resampling by the industrial user is not required if the city performs sampling at the user's facility at least once a month, or if the city performs sampling at the user between the time when the initial sampling was conducted and the time when the user or the city receives the results of this sampling, or if the city has performed the sampling and analysis in lieu of the industrial user. B. All applications and reports submitted to the industrial wastewater control program must contain the following certification statement and be signed as required in subsection (a), (b), (c), or (d) below: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." (a) By a responsible corporate officer, if the industrial user submitting the reports is a corporation. For the purpose of this paragraph, a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or; (ii) The manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility, including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate information for control mechanism requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (b) By a general partner or proprietor if the industrial user submitting the reports is a partnership or sole proprietorship, respectively. (c) The principal executive officer or director having responsibility for the overall operation of the discharging facility if the industrial user submitting the reports is a federal, state, or local governmental entity, or their agents. (d) By a duly authorized representative of the individual designated in paragraph (a), (b), or (c) of this section if: (i) The authorization is made in writing by the individual described in paragraph (a), (b), or (c); (ii) The authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or a well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and (iii) The written authorization is submitted to the city. C. All significant users must investigate instances of noncompliance with pretreatment standards and requirements, as indicated in the reports and notices required under 40 CFR 403.12, or indicated by analysis, inspection, and surveillance activities described in 40 CFR 403.8(f)(2)(v). Sample taking and analysis and the collection of other information shall be performed with sufficient care to produce evidence admissible in enforcement proceedings or in judicial actions. D. All industrial users must comply with the public participation requirements of 40 CFR part 25 in the enforcement of national pretreatment standards. These procedures shall include provision for at least annual public notification in a newspaper(s) of general circulation that provides meaningful public notice within the jurisdiction(s) served by the POTW of industrial users which, at any time during the previous 12 months, were in significant noncompliance with applicable pretreatment requirements. For the purposes of this provision, an industrial user is in significant noncompliance if its violation meets one or more of the following criteria: 1. Chronic violation of wastewater discharge limits, defined here as those in which 66 percent or more of all the measurements taken for the same pollutant parameter during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits, as defined by 40 CFR 403.3(1); 2. Technical review criteria (TRC) violation, defined here as those in which 33 percent or more of all the measurements taken for the same pollutant parameter taken during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by 40 CFR 403.3(1) multiplied by the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH); 3. Any other violation of a pretreatment standard or requirement as defined by 40 CFR 403.3(1) (daily maximum, long-term average, instantaneous limit, or narrative standard) that the POTW determines has caused, alone or in combination with other discharges, interference or pass-through (including endangering the health of POTW personnel or the general public); 4. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTW's exercise of its emergency authority under 40 CFR 403.8(f)(1)(vi)(B) to halt or prevent such a discharge; 5. Failure to meet, within 90 days after the schedule date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction or attaining final compliance; 6. Failure to provide, within 30 days after the due date, required reports such as baseline monitoring reports, 90-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; 7. Failure to accurately report noncompliance; and 8. Any other violation or group of violations, which may include a violation of best management practices, which the POTW determines will adversely affect the operation or implementation of the local pretreatment program. E. The city may publish an annual public notification, in the largest daily newspaper published in the municipality in which the POTW is located, of industrial users which, at any time during the previous 12 months, were in significant noncompliance with applicable pretreatment requirements. F. All industrial users shall notify the POTW, EPA Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR part 261. Such notification shall be conducted in accordance with the provisions of 40 CFR 403.12(p). G. All industrial users shall promptly notify the POTW in advance of any substantial change in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous wastes for which the industrial user has submitted initial notification under 40 CFR 403.12(p). H. Any industrial user submitting information to the city pursuant to this division may claim it to be confidential if it demonstrates to the satisfaction of the utilities director that release of such information would divulge information processes, or methods of production entitled to protection as the user's trade secrets. 1. The user must assert such claim at the time of submission by stamping the words "confidential business information" on each page containing such information. If no such claim is made at the time of submission, the city may make information available to the public without further notice. 2. Such confidential business information shall not be made available to the public, but the city may use the information for determining compliance with this division. 3. Effluent or discharge data is not confidential. 4. The city may provide confidential business information to governmental agencies upon written request for uses directly related to enforcement of this division, but, the city shall not transmit the confidential information to any government agency until the city has received written approval from the user. I. No person shall make any false statement, representation or certification, knowing it to be false, in any application, record, plan, data or document filed or required to be maintained pursuant to this division. J. Notice of potential problems, including slug loading. All categorical and non-categorical industrial users shall notify the POTW immediately of all discharges that could cause problems to the POTW, including any slug loadings, as defined by §403.5(b), by the industrial user. K. No person shall falsify, tamper with or knowingly render inaccurate any monitoring device or method required under this division. L. Users subject to the reporting requirements of this section shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this section, and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by the utilities director. M. Any industrial user and POTW subject to the reporting requirements established in this section shall maintain records of all information resulting from any monitoring activities required by this section, including documentation associated with best management practices. Such records shall include for all samples: 1. The date, exact place, method, and time of sampling and the names of the person or persons taking the samples; 2. The dates analyses were performed; 3. Who performed the analyses; 4. The analytical techniques/methods use; and 5. The results of such analyses. N. The utilities director shall have access to records and wastewater testing facilities during normal working hours of the user.
(Code 1982, § 13.28.270; Ord. No. 1184, § 1, 1985; Ord. No. 1390, § 12, 1994; Ord. No. 1923, § 8, 3-6-2017; Ord. No. 2098, §§ 11, 12(Exh. C), 2-15-2022)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.
