§ 40.03.1190 — Bypass
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 40.03.1190
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/6713394b-c975-472a-8481-ca78e9431492
Sec. 40.03.1190. - Bypass.
A. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provision of subsections B and C of this section. B. The industrial user shall provide notice of bypass, to the city, as follows: 1. If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the POTW treatment plant, if possible at least ten days before the date of the bypass. 2. An industrial user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the POTW treatment plant within 24 hours from the time the industrial user becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate and prevent reoccurrence of the bypass. The city may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. C. Bypass is prohibited, and the city may take enforcement action against an industrial user for bypass, unless: 1. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and 2. There were no feasible alternative to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventative maintenance; and 3. The industrial user submitted notices as required under subsection B of this section. D. The city may approve an anticipated bypass, after considering its adverse effects, if the city determines that it will meet the three conditions listed in subsection C of this section.
(Code 1982, § 13.28.300; Ord. No. 1390, § 16, 1994)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.