Sec. 40.03.1130. - Industrial discharge permit.
The city is authorized to control through permit, order, or similar means, the contribution to the POTW by each industrial user to ensure compliance with applicable pretreatment standards and requirements. In the case of industrial users identified as significant under 40 CFR §403.3(v), this control shall be achieved through individual permits or equivalent individual control mechanisms issued to each such user. A. A significant industrial user shall obtain an industrial discharge permit renewable for a period not to exceed five years at the initial cost of $100.00 and a renewal fee of $50.00 if the user: 1. Is subject to National Categorical Pretreatment Standards; or 2. Is determined by the utilities director to have significant impact, either singly or in combination with other contributing industrial users, on the quality of the wastewater treatment plant's effluent, sludge, scum or residues, or such that interference with the treatment process or facilities would result. B. Existing significant industrial users shall apply for a wastewater discharge permit within 60 days after the effective date of the ordinance codified in this division and proposed new significant industrial users shall apply at least 60 days prior to discharging into the wastewater utility. The application shall include a statement regarding whether or not applicable pretreatment standards are being met on a consistent basis, and, if not, what additional operation and maintenance and/or additional pretreatment is required to meet the standards. C. The utilities director may at any time, and in accordance with 40 CFR 403.3(v)(3), determine that an industrial user meeting the criteria of section 40.03.910.A.42(b) is not a significant industrial user if the user has no reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement. D. Industrial wastewater permits are subject to all provisions of this division and all other applicable reports, regulations, user charges and fees established by the city. Permits may must contain, without limitation, the following: 1. A statement of duration; 2. A statement of nontransferability without prior notification to the utilities director and without a copy of the existing discharge permit being provided to the new owner or operator; 3. Effluent limits, including best management practices based on applicable general pretreatment standards, categorical pretreatment standards, local limits, and state and local law; 4. Limits on average and maximum rate and time of discharge or requirements for flow regulation and equalization; 5. Schedules for installation of pretreatment equipment to bring discharge into compliance with applicable regulations; 6. Requirements for installation and maintenance of inspection and sampling facilities; 7. Specifications for monitoring programs that include sampling locations; frequency of sampling; number, type and standards for tests; and reporting schedules; 8. Requirements for submission of technical reports, discharge reports and compliance progress report; 9. Requirements for maintaining and retaining records relating to wastewater discharge as specified by the city and affording city access thereto; 10. Requirements for notification of the city to the new introduction of wastewater constituents or any change in character of the wastewater constituents or average volume being introduced into the wastewater utility; 11. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend the compliance date beyond applicable federal deadlines; 12. Requirement to control slug discharges, if determined by the utilities director to be necessary; and 13. Other conditions as deemed necessary by the utilities director in order to enforce the provisions of this division. E. The utilities director shall issue industrial discharge permits for a specified time period not to exceed five years. The industrial user shall apply for permit reissuance at least 30 days prior to the expiration of the user's existing permit. The terms and conditions for the permit may be subject to modification by the utilities director during the term of the permit if limitations or requirements are modified, if necessary to meet requirements of the city's MPDES discharge permit to accommodate new or increased contributions of wastewater or changes in the nature of the wastewater, or if there is other good cause. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. F. An applicant for a permit shall pay the prescribed fees.
(Code 1982, § 13.28.240; Ord. No. 1184, § 1, 1985; Ord. No. 1390, § 9, 1994; Ord. No. 1923, § 6, 3-6-2017)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.