§ 18-760 — General standards

Code of Ordinances of the City of Wilmington, North Carolina (Supp. No. 43, Update 1: codified through Ordinance No. O-2026-51, enacted October 20, 2026) · Wilmington Code of Ordinances § 18-760

Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/45b7c4d2-446f-4da0-8283-d87fb55ebba7

Sec. 18-760. - General standards.

All development, redevelopment, or expansion to which this ordinance applies shall comply with the standards of this section. (a) Design storm. The city has determined regardless of density classification or location the minimum control for safety of life and property to be the control of the post-development peak discharge rate of the two-year, ten-year, and 25-year storms to not exceed the predevelopment peak runoff discharge rate for the same storms. Privately owned and maintained on-site conveyance systems shall be designed at a minimum to convey the ten-year storm provided the standard for the post development peak discharge rate as specified in this section is met. (b) Overland flow. Design engineers shall indicate on the project drainage plans, the location and approximate extent of the overland relief path and areas that may be affected by surface storage for the appropriate design storm. (c) [Redevelopment projects that meet the criteria.] For redevelopment projects that meet the criteria laid out below, the project at a minimum shall treat the water quality volume specified in this section. (1) The redevelopment creates no net increase in total site impervious surface area over existing site conditions; (2) The proposed redevelopment provides stormwater controls that are equal or better than the previous development; and (3) A site plan application for the redevelopment project has been accepted as complete within twelve (12) months of the issuance of any demolition permit for existing structures on the site and an approved site plan is received within twelve (12) months. The city manager may grant an extension of ninety (90) days to receive an approved permit if substantial progress has been made. If a site plan is substantially changed subsequent to the expiration of twelve (12) months from demolition permit issuance, the site plan will be reviewed as a new development application. A project that is part of a larger common plan of development that has previously been permitted as meeting the criteria above for redevelopment shall also be deemed to meet these criteria. (d) Buffers from surface waters. New development shall have a fifty-foot wide vegetative buffer and redevelopment activities shall have a thirty-foot wide vegetative buffer along all perennial or intermittent surface waters. A perennial or intermittent surface water shall be deemed present if the feature is approximately shown on either the most recent version of the soil survey map prepared by the Natural Resources Conservation Service of the United States Department of Agriculture (USDA) or the most recent version of the 1:24,000 scale (7.5 minute) quadrangle topographic maps prepared by the United States Geologic Survey (USGS). The width of a buffer is measured horizontally from the normal pool elevation of impounded structures, from the bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. The vegetative buffer may be cleared or graded, but must be planted with and maintained in grass or any other vegetative or plant material and may contain vegetated BMPs that otherwise meet the requirements of this article and the design manual. Vegetative buffers and filters required by this section and any other buffers or filters required by state water quality or coastal management rules or local government requirements may be met concurrently and may contain, in whole or in part, coastal, isolated, or 404 jurisdictional wetlands that are located landward of the normal waterline. (e) Built-upon area setbacks. All built-upon area shall be landward of any buffer required under this section from any perennial and intermittent surface waters as defined herein. (f) [Relief from the buffer and setbacks required.] Relief from the buffer and setbacks required in this section may be granted when the applicant can provide an official letter of determination by the North Carolina Division of Water Quality that surface waters are not present in accordance with 15A NCAC 02B .0233(3)(a). (g) [Development of boating facilities or other water dependent uses.] Development of boating facilities or other water dependent uses that have received or are required to secure a Coastal Area Management Act (CAMA) major permit are exempt from the vegetative buffer requirements to the extent allowed by the permit. (h) [Urban waterfront development or redevelopment.] The development or redevelopment of a parcel in the Urban Waterfront as defined by North Carolina Administrative Code 15 NCAC 07H .0209(g) is exempt from the buffer and setback requirements of this section provided that it meets the following conditions: (1) The development must be consistent with adopted plans; (2) Impervious surfaces shall not exceed thirty (30) percent of the AEC area of the lot. Impervious surfaces may exceed thirty (30) percent if the applicant can effectively demonstrate, through a stormwater management system design, that the protection provided by the design would be equal to or exceed the protection by the thirty (30) percent limitation. Redevelopment of areas exceeding the thirty (30) percent impervious surface limitation may be permitted if impervious areas are not increased and the applicant designs the project to comply with the intent of the rule to the maximum extent feasible; and (3) The development shall meet all stormwater management requirements of this section. (i) Covenant restrictions. The approval of the stormwater management permit shall require an enforceable restriction on property that runs with the land, such as a recorded deed restriction or protective covenants, to ensure that future development, management, redevelopment, or expansion maintains the site consistent with the approved project plans, including recordation on any approved plat limits of impervious surface area on a per-lot basis, if applicable. (j) [Multiple lot developments.] Multiple lot developments shall be regulated through deed restrictions on the allocation of impervious surface area on a per-lot basis as identified on approved plans and preliminary plans. For exempt subdivisions, impervious limits may be required on a final plat to correspond to an approved drainage plan or stormwater plan if applicable. Per lot allocations for residential developments shall include a primary allocation for primary residences including attached garages and driveways and a secondary allocation for accessory structures with impervious surfaces.

(Ord. No. O-2009-92, § 2, 9-15-09; Ord. No. O-2016-35, § 13, 5-3-16)