For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-189 — Significant user discharge permits

Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Municipal Code § 28-189

Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/7a6dbb3c-3d0e-4754-80b5-a36f997303f5

Sec. 28-189. - Significant user discharge permits.

(a) Wastewater analysis. When requested by the utilities director, a user must submit information on the nature and characteristics of its wastewater within 30 days of the request. The utilities director is authorized to periodically require a user to update this information. (b) Requirement for a significant user discharge permit. A. No significant industrial user shall discharge wastewater into the POTW without first obtaining an individual significant user discharge permit from the utilities director. B. The utilities director may require other users to obtain individual significant user discharge permits as necessary to carry out the purposes of this article. C. Any violation of the terms and conditions of a significant user discharge permit is a violation of this article, and subjects the permittee to the sanctions set out in sections 28-195 through 28-197. Obtaining a significant user discharge permit does not relieve the permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (c) Discharge permits for new connections. All significant industrial users or other users that are required to obtain an individual significant user discharge permit must obtain such permit prior to the beginning or recommencing discharging into the POTW. An application for the significant user discharge permit, in accordance with subsection (e), must be filed at least 60 days prior to the date upon which any discharge will begin or recommence. (d) Contents of application for a significant user discharge permit. A. All users required to obtain a significant user discharge permit must submit a permit application. The utilities director may require users to submit all or some of the following information as part of the permit application: (1) Identifying information. a. The name and address of the facility, including the name of the operator and owner. b. Contact information, description of activities, facilities, and plant production processes on the premises; (2) Environmental permits. A list of any environmental control permits held by or for the facility. (3) Description of operations. a. A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description shall include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. b. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; c. Number and type of employees, hours of operation, and proposed or actual hours of operation; d. Type and amount of raw materials processed (average and maximum per day); e. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; (4) Time and duration of discharges; (5) Location(s) for monitoring all wastes covered by the permit; (6) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula, if applicable, set out in subsection 28-187(b)C (40 CFR 403.6(e)). (7) Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. b. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the utilities director, of regulated pollutants in the discharge from each regulated process. c. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. d. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection 28-191(j). Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the utilities director or the applicable standards to determine compliance with the standard. e. Sampling must be performed in accordance with procedures set out in subsection 28-191(k). (8) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on subsection 28-191(d)B [40 CFR 403.12(e)(2)]. (9) Any other information as may be deemed necessary by the utilities director to evaluate the permit application. B. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (e) Application signatories and certifications. A. All significant user discharge permit applications, user reports, and certification statements must be signed by an authorized representative of the user, and contain the certification statement in subsection 28-191(n)A. B. If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the utilities director prior to or together with reports to be signed by an authorized representative. C. A facility determined to be a non-significant categorical industrial user by utilities director pursuant to subsection 28-186(d) [significant industrial user definition, subparagraph (3)] must annually submit the signed certification statement in subsection 28-191(n)B. [40 CFR 403.3(v)(2)] (f) Decisions regarding a significant user discharge permit. The utilities director will evaluate the data furnished by the user and may require additional information. Within five business days of receipt of a complete permit application, the utilities director will determine whether to issue an individual significant user discharge permit. The utilities director may deny any application for an individual significant user discharge permit.

(Ord. No. 2488, § II(4), 12-1-08)

Ask a question about Las Cruces law

Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.