§ 28-190 — Issuance of significant user discharge permits
Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Municipal Code § 28-190
Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/93247208-5bf3-4ca7-9c6a-c7abc5c9127e
Sec. 28-190. - Issuance of significant user discharge permits.
(a) Duration of individual significant user discharge permits. An individual significant user discharge permit shall be issued for a specified time period, but not to exceed five years from the effective date of the permit. Each individual significant user discharge permit will indicate a specific date upon which it will expire. (b) Contents of individual significant user discharge permits. An individual significant user discharge permit shall include such conditions as are deemed necessary by the utilities director to prevent pass through or interference, protect the quality of the water body receiving the treatment facility's effluent, protect worker health and safety, facilitate sludge management and enable beneficial use, and protect against damage to the POTW. A. Individual significant user discharge permits must contain: (1) A statement that indicates the significant user discharge permit issuance date, expiration date and effective date; (2) A statement that the significant user discharge permit is nontransferable without prior notification to the city in accordance with subsection (e), and provisions for furnishing the new owner or operator with a copy of the existing significant user discharge permit; (3) Effluent limits, including best management practices, based on applicable pretreatment standards; (4) Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include, but are not limited to, an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, sample type, chain of custody, QA/QC documentation, flow measurement and documentation of calibration, etc. (5) The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with subsection 28-191(d)B. [CFR 403.12(e)(2).] (6) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule, which may not extend the time for compliance beyond that allowed by applicable federal, state, or local law; (7) Requirements to control slug discharge, if determined by the utilities director to be necessary; (8) Any grant of a monitoring waiver by the utilities director (subsection 28-191(d)B) must be included as a condition in the user's permit. B. Individual significant user discharge permits may contain, but need not be limited to, the following conditions: (1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (3) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges; (4) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; (6) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (7) A statement that compliance with the significant user discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the significant user discharge permit; and (8) Other conditions as deemed appropriate by utilities director to ensure compliance with this article, and state and federal laws and regulations. (c) Permit appeals. Any person, including the user, may petition the utilities director to reconsider the terms of an individual significant user discharge permit. For the user this petition must be submitted no later than 30 days prior to the effective date of its issuance. A. In its petition, the appealing party must indicate the specific permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the individual significant user discharge permit. B. The effectiveness of the individual significant user discharge permit shall not be stayed pending the appeal. C. If the utilities director fails to act within 30 days, or notify the user of an extension of time for reconsideration, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider, not to issue, or not to modify an individual significant user discharge permit shall be considered final administrative actions for purposes of judicial review. D. Aggrieved parties seeking judicial review of the final administrative decision regarding individual user discharge permit must do so by filing a complaint with the state district court in Las Cruces, New Mexico. (d) Permit modification. The utilities director may modify an individual user discharge permit for good cause, including, but not limited to, the following reasons: A. To incorporate any new or revised federal, state, or local pretreatment standards or requirements; B. To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of the individual significant user discharge permit issuance; C. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; D. Information indicating that the permitted discharge poses a threat to the city's POTW, personnel, the receiving waters, or beneficial use of sludge; E. Violation of any terms or conditions of the individual user discharge permit; F. Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; G. Revision of a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; H. To correct typographical or other errors in the individual user discharge permit; or I. To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with subsection (e). (e) Transfer of a significant user discharge permit. Individual significant user discharge permits may be transferred to a new owner or operator only if the permittee gives at least 30 days' advance notice to the utilities director and utilities director approves the individual significant user discharge permit transfer. The notice to the utilities director must include a written certification by the new owner or operator which: A. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; B. Identifies the specific date on which the transfer is to occur; and C. Acknowledges full responsibility for complying with the existing individual significant user discharge permit. Failure to provide advance notice of a transfer renders the individual significant user discharge permit void as of the date of facility transfer. (f) Revocation of individual significant user discharge permits. Utilities director may revoke an individual significant user discharge permit for good cause, including, but not limited to, the following reasons: A. Failure to notify the utilities director of significant changes to the characteristics and/or volume of waste water prior to the changed discharge; B. Failure to provide prior notification to the utilities director of changed conditions pursuant to subsection 28-191(e); C. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; D. Falsifying self-monitoring reports and certification statements; E. Tampering with monitoring equipment; F. Refusing to allow the utilities director timely access to the facility premises and records; G. Failure to meet effluent limitations; H. Failure to pay fines; I. Failure to pay sewer charges; J. Failure to meet compliance schedules; K. Failure to complete a wastewater survey or the wastewater discharge permit application; L. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or M. Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article. Individual wastewater discharge permits shall be revoked upon cessation of operations or transfer of business ownership. All individual user discharge permits issued to a user are void upon the issuance of a new individual user discharge permit to that user. (g) Re-issuance of a significant user discharge permit. A user with an expiring individual user discharge permit shall apply for individual user discharge permit re-issuance by submitting a complete permit application, in accordance with subsection 28-189(e), a minimum of 60 days prior to the expiration of the user's existing individual wastewater discharge permit. (h) Regulation of wastewater received from other jurisdictions. A. If another user located outside the city's municipal boundaries, contributes wastewater to the POTW, the utilities director shall enter into an inter-agency agreement with the contributing user. B. Prior to entering into an agreement required by subsection A above, the utilities director shall request the following information from the contributing user: (1) A description of the quality and volume of wastewater discharged to the POTW by the contributing user; (2) An inventory of all industrial and commercial users located within the contributing user's jurisdictional boundaries that are discharging to the POTW; and (3) Such other information as the utilities director may deem necessary. C. An inter-agency agreement, as required by subsection A, above, shall contain the following conditions: (1) A requirement for the contributing user to abide by this article; (2) A requirement for the contributing user to submit a revised user inventory on at least an annual basis; (3) A provision specifying which pretreatment implementation activities, including individual user discharge permit issuance, inspection and sampling, and enforcement, will be conducted by the contributing user; which of these activities will be conducted by the utilities director; and which of these activities will be conducted jointly by the contributing user and the utilities director; (4) A requirement for the contributing user to provide the utilities director with access to all information that the contributing user obtains as part of its pretreatment activities; (5) Limits on the nature, quality, and volume of the contributing user's wastewater at the point where it discharges to the POTW; (6) Requirements for monitoring the contributing user's discharge; (7) A provision ensuring the utilities director access to the facilities of dischargers located within the contributing user's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the utilities director; and (8) A provision specifying remedies available for breach of the terms of the inter-municipal agreement; (9) The utilities director has the right to take action to impose and enforce this article directly against the user or dischargers located within the user's jurisdictional boundaries.
(Ord. No. 2488, § II(5), 12-1-08)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.
