Sec. 28-191. - Reporting requirements.

(a) Baseline monitoring reports. A. Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the utilities director a report which contains the information listed in subsection B, below. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the utilities director a report which contains the information listed in subsection B, below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. B. Users described above shall submit the information set forth below. (1) All information required in subsections 28-189(d)A(1)a, (d)A(2), (d)A(3)a, and (e)A(6). [40 CFR 403.12(b)(1)-(7)] (2) Measurement of pollutants. a. The user shall provide the information required in subsections 28-189(d)A(7) a. through d. b. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection. c. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the control authority; d. Sampling and analysis shall be performed in accordance with subsection (j); e. The utilities director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; f. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. (3) Compliance certification. A statement, reviewed by the user's authorized representative as defined in subsection 28-186(d) and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. (4) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection (b). (5) Signature and report certification. All baseline monitoring reports must be certified in accordance with subsection (n)A and signed by an authorized representative as defined in subsection 28-186(d). (b) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (a)B(4): A. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); B. No increment referred to above shall exceed nine months; C. The user shall submit a progress report to the utilities director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and D. In no event shall more than nine months elapse between such progress reports to utilities director. (c) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the utilities director a report containing the information described in subsection 28-189(d)A (6) and (7) and (a)B(2) of this section. For users subject to equivalent mass or concentration limits established in accordance with the procedures in section 28-187(b) [40 CFR 403.6(c)], this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection (n)A. All sampling will be done in conformance with subsection (k). (d) Periodic compliance reports. A. Except as specified in subsection (d)C, all significant industrial users must, at a frequency determined by the utilities director submit no less than twice per year reports indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and the measured, or estimated, average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the utilities director or the pretreatment standard necessary to determine the compliance status of the user. B. The utilities director may authorize a categorical industrial user to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. [40 CFR 403.12(e)(2)]. This authorization is subject to the following conditions: (1) The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater. (2) The monitoring waiver is valid only for the duration of the effective period of the individual user discharge permit, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual user discharge permit. See subsection 28-189(d)A(8). (3) In making a demonstration that a pollutant is not present, the industrial user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. (4) The request for a monitoring waiver must be signed in accordance with subsection 28-186(d)C, and include the certification statement in subsection (n)A (40 CFR 403.6(a)(2)(ii)). (5) Non-detectable sample results may be used only as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR Part 136 with the lowest minimum detection level for that pollutant was used in the analysis. (6) Any grant of the monitoring waiver by the utilities director must be included as a condition in the user's significant user discharge permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the utilities director for three years after expiration of the waiver. (7) Upon approval of the monitoring waiver and revision of the user's permit by the utilities director, the industrial user must certify on each report with the statement in subsection (n)C below, that there has been no increase in the pollutant in its waste stream due to activities of the industrial user. (8) In the event that a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately: Comply with the monitoring requirements of subsection (d)A, or other more frequent monitoring requirements imposed by the utilities director, and notify the utilities director. (9) This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard. C. The utilities director may reduce the requirement for periodic compliance reports [see subsection (d)A (40 CFR 403.12(e)(1))] to a requirement to report no less frequently than once a year, unless required more frequently in the pretreatment standard or by the EPA/state, where the industrial user's does not exceed any of the following: (1) Total categorical wastewater flow does not exceed 0.01 percent of the POTW's design dry-weather hydraulic capacity of the POTW, or 5,000 gallons per day, whichever is smaller, as measured by a continuous effluent flow monitoring device unless the industrial user discharges in batches, (2) Total categorical wastewater flow does not exceed for 0.01 percent of the design dry-weather organic treatment capacity of the POTW; and (3) Total categorical wastewater flow does not exceed 0.01 percent of the maximum allowable headworks loading for any pollutant regulated by the applicable categorical pretreatment standard for which approved local limits were developed in accordance with subsection 28-187(d). Reduced reporting is not available to industrial users that have in the last two years been in significant noncompliance, as defined in section 28-194. In addition, reduced reporting is not available to an industrial user with daily flow rates, production levels, or pollutant levels that vary so significantly that, in the opinion of the utilities director, decreasing the reporting requirement for this industrial user would result in data that are not representative of conditions occurring during the reporting period. D. All periodic compliance reports must be signed and certified in accordance with subsection (n)A. E. All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. F. If a user subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the utilities director, using the procedures prescribed in subsection (k), the results of this monitoring shall be included in the report. [40 CFR 403.12(g)(6)] (e) Reports of changed conditions. Each user must notify the utilities director of any significant changes to the user's operations or system, such as facility expansion, production changes or process modifications, which might alter the nature, quality, or volume of its wastewater at least 90 days before the change. A. The utilities director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under subsection 28-189(d). B. The utilities director may issue an individual significant user discharge permit under subsection 28-190(g), or modify an existing significant user discharge permit under subsection 28-190(d), in response to changed conditions or anticipated changed conditions. (f) Reports of potential problems. A. In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, a slug discharge or slug load, that might cause potential problems for the POTW, the user shall immediately telephone and notify the utilities director of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. B. Within five business days following such discharge, the user shall, unless waived by the utilities director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. such notification shall not relieve the user of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article. C. A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection A, above. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. D. Significant industrial users are required to notify the utilities director immediately of any changes at its facility affecting the potential for a slug discharge. (g) Reports from un-permitted users. All users, not required to obtain an individual significant user discharge permit, shall provide appropriate reports when the utilities director makes such a request. (h) Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the utilities director within 24 hours of becoming aware of the violation. The user then must repeat the sampling and analysis, and submit the results of the repeat analysis to the utilities director within 30 days after becoming aware of the violation. City will also conduct sampling and analyses within 30 days. If sampling performed by the city indicates a violation, the user must conduct sampling and analysis and submit the results of the repeat analysis to utilities director within 30 days of notification by the utilities director; the city will repeat the sampling and analyses within 30 days. The results from both sources will be used to evaluate whether the user is in continued non-compliance or whether they have returned to compliance. (i) Notification of the discharge of hazardous waste. The discharge to the POTW of hazardous wastes which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. is prohibited. Any user who commences the discharge of a hazardous waste must desist and notify the POTW as soon as the prohibited discharge is known. This provision does not create a right to discharge any substance that is not otherwise permitted to be discharged by this article, an individual user permit, or any applicable federal or state law. (j) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of an individual significant user discharge permit application or report shall be performed in accordance with the methods approved in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods proposed by the utilities director and approved by EPA. (k) Sample collection. Samples collected to satisfy reporting requirements in the individual significant user discharge permit must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. A. Except as indicated in subsections B and C below, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the utilities director. Where time-proportional composite sampling or grab sampling is authorized by the city, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the city, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. [40 CFR 403.12(g)(3)] B. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. C. For sampling required in support of baseline monitoring and 90-day compliance reports required in subsections (a) and (c) [40 CFR 403.12(b) and (d)], a minimum of four grab samples must be used for pH, temperature, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the utilities director may authorize a lower minimum. For the reports required by subsection (d) (40 CFR 403.12(e) and 403.12(h)), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements. [40 CFR 403.12(g)(4)] (l) Date of receipt of reports. Written reports will be deemed to have been submitted on the date postmarked. For reports, which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (m) Recordkeeping. Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this chapter, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices established under subsection 28-187(d)C. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by the utilities director. (n) Certification statements. Certification must be provided with all applications for individual user discharge permits and with all SIU reports required by the individual user discharge permit or by any applicable federal or state law. A. Certification of permit applications, user reports and initial monitoring waiver. The following certification statement is required to be signed and submitted by users submitting permit applications in accordance with subsection 28-189(g); users submitting baseline monitoring reports under subsection (a)B(5) [40 CFR 403.12 (l)]; users submitting reports on compliance with the categorical pretreatment standard deadlines under subsection (c) [40 CFR 403.12(d)]; users submitting periodic compliance reports required by subsections (d)A—D [40 CFR 403.12(e) and (h)], and users submitting an initial request to forego sampling of a pollutant on the basis of subsection (d)B(4) [40 CFR 403.12(e)(2)(iii)]. The following certification statement must be signed by an authorized representative as defined in subsection 28-186(d)C: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. B. Annual certification for non-significant categorical industrial users. A facility determined to be a non-significant categorical industrial user by the utilities director pursuant to subsection 28-186(d) and 28-189(e)C [40 CFR 403.3(v)(2)] must annually submit the following certification statement signed in accordance with the signatory requirements in subsection 28-186(d) [40 CFR 403.120(l)]. This certification must accompany an alternative report required by the utilities director: Based on my inquiry of the person or persons directly responsible for managing compliance with the Categorical Pretreatment Standards under 40 CFR _______, I certify that, to the best of my knowledge and belief that during the period from _______, _______ to _______, _______ [months, days, year]: (a) The facility described as ___________ [facility name] met the definition of a Non-Significant Categorical Industrial User as described in section 28-186(d); [See 40 CFR 403.3(v)(2)] (b) The facility complied with all applicable Pretreatment Standards and requirements during this reporting period; and (c) the facility never discharged more than 100 gallons of total categorical wastewater on any given day during this reporting period. This compliance certification is based on the attached information. C. Certification of pollutants not present. Users that have an approved monitoring waiver based on subsection (d)B must certify on each report with the following statement that there has been no increase in the pollutant in its wastestream due to activities of the user. [40 CFR 403.12(e)(2)(v)] Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _______ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of _______ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under Section 28-191(d)A.

(Ord. No. 2488, § II(6), 12-1-08)