For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-42 — General policies

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 38-42

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/ff48e66c-d7b7-4e9f-9b3c-dcba369b37aa

Sec. 38-42. - General policies.

Sec. 38-42.1. Purpose statement. This section (section 38-42) establishes the city's two (2) universal policies for subdivision related public improvements. The first policy requires that all public improvements be in conformance with city plans and codes. This conformance policy enables the Subdivision Ordinance to be a critical tool for enforcing all city standards as new development occurs. The second policy requires all new development to have adequate public facilities to serve the needs of the development. This responsibility is placed on the owner or developer of the land to protect the public health, safety, and welfare of the city as the development occurs. Sec. 38-42.2. Conformance to plans and codes. (a) Public improvements conform to plan and codes. Proposed public improvements serving new development shall conform to and be properly related to the public facilities elements of the city's adopted comprehensive plan, trails master plan, other adopted master plans for public facilities and services, and applicable capital improvements plans, various chapters of the city Code, the Engineering Standards Manual and construction details, and shall at a minimum meet the service levels specified in such plans. (b) Thoroughfares conform to the comprehensive plan and codes. (1) Thoroughfares based on the comprehensive plan. a. All plats and corresponding construction plans shall provide for thoroughfares as shown in the comprehensive plan. b. The alignment and right-of-way width of all proposed thoroughfares shall be in general conformance with the comprehensive plan. 1. Minor adjustments to thoroughfare alignments may be allowed without amending the comprehensive plan if the director of community development believes the new alignment meets the spirit and intent of the comprehensive plan or trails master plan and will not compromise public safety or traffic efficiency. 2. In addition to the standards of this Subdivision Ordinance, the engineering design and construction of all proposed thoroughfares shall be in conformance with the Engineering Standards Manual and construction details, and the trails master plan, and shall be subject to approval by the city engineer. such approvals shall be required prior to any plat approval. (2) Comprehensive plan amendment. If a significantly different roadway alignment or type (from what is shown within the comprehensive plan) is proposed, then the comprehensive plan and its thoroughfare plan shall be amended prior to any plat approval. (c) Water and wastewater systems conform to plans and codes. (1) The design and construction of the water system and wastewater system to serve a development shall be in conformance with: a. The city's master plans for water and wastewater facilities; b. The Engineering Standards Manual and construction details; and c. Chapter 43 and other chapters of the city Code. (2) The design and construction of the water system and wastewater system to serve a development shall be subject to approval by the city engineer prior to approval of the construction plans and the final plat. (d) Storm drainage standards. (1) The design and construction of the storm drainage system to serve a development shall be in conformance with, but not limited to: a. The city's master plans for stormwater drainage; b. Chapter 13 (Drainage and Flood Control), Chapter 43 (Water, Sewer, Sewage Disposal, and Stormwater Quality) and other chapters of the city Code; and c. The Engineering Standards Manual and construction details. (2) The design and construction of the storm drainage system to serve a development shall be subject to approval by the city engineer prior to approval of the construction plans and the final plat. Sec. 38-42.3. Adequate public facilities requirements. (a) Adequate services for areas proposed for development. (1) General requirement. a. Land proposed for development in the city shall be served adequately by essential public facilities and services, including, but not limited to: 1. Water distribution; 2. Wastewater collection and treatment; 3. Roadways; 4. Pedestrian circulation; 5. Storm drainage conveyance; and 6. Park and recreational facilities. b. Land shall not be approved for platting or development until adequate public facilities necessary to serve the development exist or provisions have been made for the facilities, whether the facilities are to be located within the property being developed or off-site. (2) Street access for all lots required. A plat will not be approved unless all of the proposed lots have direct access to an improved or approved public or private street built to the city's minimum design and paving standards, or to an approved public way that is connected to an improved public street. (3) Water. A plat will not be approved unless all of the proposed lots are connected to an approved public water system that is capable of providing adequate water for health and emergency purposes. a. Water flow from two (2) directions or sources required. Except for lots along an approved cul-de-sac, all lots shall be provided service connections from a looped water main providing water flow from two (2) directions or sources, unless water flow is supplied by a larger line as determined by the city engineer. b. Fire flow requirements. Water service shall be sufficient to meet the fire flow requirements of the proposed development, except where a suitable alternative means of fire protection is approved by the fire chief. c. Phasing of development. The city may require the phasing of development and/or improvements to the water system to ensure adequate fire protection. (4) Wastewater. A plat will not be approved unless all of the proposed lots are served by an approved means of wastewater collection and treatment. a. Discharge within capacity. The projected wastewater discharge of a proposed development shall not exceed the proposed capacity of the wastewater system. b. Phasing of development. The city may require the phasing of development and/or improvements to the sanitary sewer system to maintain adequate wastewater capacity. (5) Storm drainage. A plat will not be approved unless all of the proposed lots have adequate storm drainage. a. Impacts to adjoining, upstream or downstream properties. 1. Increased stormwater runoff attributable to new development shall not cause impacts to adjoining, upstream, or downstream properties. 2. Impacts are defined as an increase in runoff between pre- and post-development. b. Mitigation of excess runoff. Where the projected runoff from a new development exceeds runoff from pre-development conditions, the city may require: 1. The phasing of development; 2. The use of control methods such as retention or detention; 3. Obtaining off-site drainage easements; and/or 4. The construction of off-site drainage improvements as means of mitigation. (b) Property owner's responsibilities to provide adequate services. The property owner shall be responsible for, but not limited to, the following: (1) Dedication and construction of improvements. The property owner shall dedicate all rights-of-way and easements for, and shall construct and extend, all necessary on-site and off-site public improvements for water distribution, wastewater collection and treatment, streets, storm drainage conveyance, and other improvements that are necessary to adequately serve each phase of a proposed development at service levels that are consistent with the city's applicable master facilities plans and construction design standards. (2) Substandard streets. a. Where a substandard street abuts or traverses a proposed development, the city may require the property owner to dedicate additional right-of-way and to improve the street to the city's current design and construction standards as set forth in the comprehensive plan and Engineering Standards Manual and construction details. b. Such requirements to improve the substandard street to the city's current standards shall only be imposed following careful review of factors including, but not limited to: 1. The impact of the new development on the street; 2. The timing of the development in relation to the need for the street; and 3. The likelihood that adjoining property will develop in a timely manner. c. In the case of frontage or service roads for state or federally designated highways, the entire abutting right-of-way shall be dedicated and improved to that agency's applicable construction design standards if such improvement is approved by the agency. (Also, refer to section 38-45, street requirements.) (3) Facilities impact studies. a. The city may require that a developer prepare a traffic impact analysis (TIA), flood or drainage study or downstream assessment, or other facilities impact study(ies) in order to assist the city in determining whether a proposed development will be supported with adequate levels of public facilities and services concurrent with the demand for the facilities created by the development. b. The study(ies) shall identify, at a minimum: 1. The adequacy and capacities of existing facilities; 2. The nature and extent of any current deficiencies; and 3. The public improvements that will be needed to meet adequate levels of service assuming development at the intensity proposed in the application. c. The study(ies) shall be subject to review and approval by the city engineer prior to approval of the preliminary plat and the construction plans. d. The city also may require, at the time of approval of a subsequent application (e.g., final plat), an update of a facilities impact study(ies) approved in connection with a prior application (e.g., preliminary plat). (4) Future extension of public facilities. The property owner shall make provisions for future expansion of the public facilities as needed to serve future developments. If oversizing of public facilities is deemed necessary by the city engineer for future developments, then the city may participate in such oversizing costs as part of a development agreement. (5) Operations and maintenance of the public facilities. The property owner shall provide for all operations and maintenance of the public facilities, or shall provide proof that a separate entity will be responsible for the operations and maintenance of the facilities. (6) Approvals from utility providers. The property owner shall obtain all necessary approvals from the applicable utility providers other than the city and shall submit written verification of such approvals to the city with the construction plans. (7) Compliance with utility providers. The property owner shall comply with all requirements of the utility providers and city. (c) Rough proportionality and fair share policy statement. (1) There is a direct correlation between the increased demand on public facilities that is created by a new development, and the city's requirements to dedicate rights-of-way and easements and to construct a fair and proportional share of public improvements that are necessary to offset such impacts such that new development does not negatively affect the city as a whole, as determined by the capital improvement program and city council. (2) The city desires that a new development project contribute its fair and proportional share of such costs. (3) A fair and proportional share shall be determined as the level or standard of service that is required to adequately serve a new development. (4) Standards relating to the dedication or construction requirements shall be roughly proportional (see definition proportionality/proportional share) to the nature and extent of the impacts created by the proposed development on the city's water, wastewater, storm drainage, parks or roadway system, as the case may be, or does reasonably benefit the proposed development. (5) See section 38-60, subdivision proportionality appeal for further details.

(Ord. No. 3180, § 2, 8-14-12; Ord. No. 3586, § 1, 2-25-25)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.