For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-44 — Drainage and environmental standards

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 38-44

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/ee99db37-1b0b-48b1-90d8-7d933f5525da

Sec. 38-44. - Drainage and environmental standards.

Sec. 38-44.1. Purpose statement. Drainage and the management of stormwater runoff are critical to providing for the health, safety, and welfare of the community. Drainage from one property to another can substantially affect the use and enjoyment of the property the water is traveling across. Additionally, public creeks and waterways can be negatively affected by increased drainage. Upstream properties and their development have the potential to increase the flow and velocity of water runoff during storm events and thus potentially threaten existing homes and businesses by causing soil and creek erosion. This section (section 38-44) is designed to proactively address drainage for new development. Sec. 38-44.2. Drainage and stormwater management policies and standards. (a) Easements. (1) Easement dedication. Drainage easements shall be dedicated for public drainage features in accordance with requirements of this Subdivision Ordinance. (2) Easement design. a. Drainage easements and features shall be included as a portion of buildable lot(s) and not as a lot by itself unless specifically authorized by the city engineer. b. Easements shall be designed to allow for maintenance and shall meet the standards found in the Engineering Standards Manual and construction details. (b) Stormwater quality. (1) Management of stormwater. Designs for new development shall manage stormwater in a manner that protects water quality by addressing the development's potential to cause erosion, pollution, siltation, and sedimentation in the municipal separate storm sewer system (MS4) and in the 100-year floodplain. (2) Permit standards. It is the developer's responsibility to ensure that designs for new development meet the stormwater management requirements in local and state stormwater discharge permit. Permit requirements include measures that will be installed during construction to control pollutants in stormwater discharges after construction operations have been completed. (c) Stormater runoff. (1) Stormwater runoff shall be calculated anticipating a fully developed watershed. (2) The comprehensive plan, existing land use, and zoning maps shall be used to determine fully developed conditions. (3) The city engineer reserves the right to review the determination of fully developed conditions and may require revisions. (d) Residential lot-to-lot drainage. The following shall apply to residential lot subdivisions: (1) Site grading shall be carried out in such a manner that surface water from each lot will flow directly to a storm sewer, improved channel, or paved street without crossing more than one (1) adjacent lot. (2) No more than one (1) lot may drain onto an adjacent lot (i.e., multiple lots cannot drain onto the same adjacent lot). (3) Subdivisions shall be designed to prevent any surface water within a storm sewer, improved channel, or paved street from flowing onto a residential lot. (e) Finish floor elevations. (1) Finish floor elevations for flood protection. a. The city engineer may require finish floor elevations to provide flood protection on all lots contained within the subdivision. b. The finish floor elevations shall: 1. Be shown on the preliminary plat and site development plan; 2. Incorporate the most current floodplain management criteria or other criteria as necessary to avoid damages; 3. Be one (1) foot above the fully developed 100-year water surface elevation where the finish floor is associated with a 100-year floodplain or open channel; and 4. Be set by the developer's engineer and agreed upon by the city. (2) The following note or an amended version appropriate to the specific plat shall be added to any plat upon which the city engineer requires the establishment of finish floor elevations: a. "The City requires finish floor elevations on all lots contained within this addition. The minimum elevations shown are based on the most current information available at the time the plat is filed and are only subject to change by written request by the Developer's Professional Engineer (P.E.) and approval by the City Engineer." (f) Detention and retention pond design. Storage of stormwater runoff within a stormwater management system is essential to providing the extended detention of stormwater flows for water quality protection and downstream streambank erosion protection, as well as for peak flow attenuation of larger flows for flood protection. Runoff storage can be provided within an on-site system through the use of structural stormwater controls and/or nonstructural features and landscaped areas. Figure 5 illustrates various storage facilities that can be considered for a development site. Detention ponds are designed to drain a runoff volume over a specified period of time, typically twenty-four (24) hours, and provide for streambank protection. Detention ponds are designed to completely drain after a storm has passed. Likewise, retention ponds also serve to drain runoff, but have the added feature of a permanent pool. Figure 5: Detention and Retention Pond Examples [image omitted; see the official code] (1) Pond standards. a. Detention shall be required for all subdivisions one (1) acre or larger. b. Ponds shall be built to the capacity to detain the stormwater runoff leaving the development to the "historic value" (before development) of a 100-year storm event. c. Extended detention and release rate. 1. Ponds shall provide for the extended detention of stormwater to be released at a level to protect water quality and prevent streambank erosion. Due to the unique nature of each site and design on the ponds, the release rate may vary. 2. Stormwater runoff may be released over twenty-four (24) hours after a designed storm has passed. d. In addition to showing ponds on the preliminary SWMP and preliminary drainage plan, ponds shall be shown on and approved with construction plans. e. Pond designs shall include a maintenance plan and bond for the removal of sediment and continued operation of the pond in a clean and sanitary manner. f. In order to accommodate subdivisions that are developed in phases, multiple ponds may be constructed and shall detain the runoff from associated phases and any upstream runoff contributing to the inflow of the pond. g. Ponds shall be built in the first phase of the subdivision and maintained throughout construction of all phases of development that have the potential to contribute stormwater runoff into the pond. h. Prior to final plat approval: 1. Notice of termination for all stormwater permits shall be filed and approved; 2. The responsibility for any ponds shall be transferred to the HOA; and 3. All sediment that has been deposited during construction activities shall be removed in order for the pond to operate at the full design capacity and standard. (2) Pond design requirements. a. All ponds shall have a minimum fifteen-foot wide private permanent access easement for maintenance, larger if determined by the city engineer. b. A sediment forebay (i.e., small pool) shall be included near the inlet of the pond to capture silt and other particles before entering the main pond. 1. The sediment forebay shall function as a pretreatment feature for the main pond. 2. Markers or stakes shall be provided within the forebay to indicate the sediment level upon which the removal of sediment from forebay is required by the maintenance plan. 3. Per approval of the director of community development, a sediment forebay may not be required if the pond is to operate solely as a detention pond and not as a retention pond. c. The main pond shall be designed with a higher length to width ratio to eliminate potential for flow to bypass the pond. d. For detention ponds, a concrete lined pilot channel shall be provided to prevent stagnation during low flows. e. Erosion should be minimized at all times, with the outfall area being stabilized to prevent scour. f. An emergency spillway shall be provided to safely convey large flood events. g. Either a micro-pool at the outlet of the main pond, a reverse-sloping pipe, or weir outlet with a trash rack shall be provided to prevent re-suspension of sediment and outlet clogging. h. A landscaping buffer shall be provided around the pond with plants capable of surviving wet and dry periods. No trees shall be planted on the dam or within thirty (30) feet of the toe of the dam. Figure 6: Detention Pond Design Example [image omitted; see the official code] Figure 7: Retention Pond Design Example [image omitted; see the official code] (g) Off-site drainage. (1) Drainage onto adjacent property prohibited. When any proposed development requires off-site grading where stormwater runoff has been collected or concentrated, it shall not be permitted to drain onto adjacent property except in existing 100-year floodplains, channels, storm sewers or streets unless one (1) of the following is provided: a. Notarized document of permission. 1. The document shall state that the permission shall bind the owner of the affected property and be a covenant running with the land. 2. It shall also refer to the plans for the improvements creating the need for the permission. 3. The document shall be filed with the county. b. Drainage easement. 1. A drainage easement shall be dedicated for the 100-year floodplain, ditches, or drainage channels. 2. A drainage easement shall be of a width sufficient to comply with the criteria outlined in the Engineering Standards Manual and construction details. Sec. 38-44.3. Preliminary stormwater management plan. (a) Purpose and applicability. (1) The purpose of the preliminary stormwater management plan (SWMP) is to identify permanent water quality features and guide stormwater management design within the related construction plans, final plat, and development plans/permits. (2) A preliminary SWMP shall be prepared for all developments in accordance with the requirements set forth in the application form. (b) Coordination with preliminary drainage plans. (1) The preliminary SWMP shall be prepared in coordination with the preliminary drainage plan on all projects where both are required. (2) The preliminary SWMP and the preliminary drainage plan may be shown on the same sheet. (3) When a preliminary drainage plan is not required, the preliminary SWMP shall indicate the existing drainage patterns, runoff coefficients, and the proposed changes to these items. (c) Standards and criteria. (1) The preliminary SWMP must comply with the standards and criteria outlined in: a. This Subdivision Ordinance; b. The Engineering Standards Manual and construction details; and c. The Code of Ordinances (e.g., chapters 13 and 43), including erosion control/sediment plans. (2) The preliminary SWMP may satisfy the stormwater management portion of the stormwater pollution prevention plan (SWPPP) that is required for construction activities; however, the preliminary SWMP is not a substitution for the SWPPP. (3) The city's review of the preliminary SWMP does not constitute acceptance of the related construction plans or development plans/permits. (d) Proposed area. (1) The developer shall provide a preliminary SWMP for the area proposed for development. (2) For amended plats or plats with a previously accepted preliminary SWMP, the accepted preliminary SWMP shall be enforced unless a revised preliminary SWMP is required. (e) Preliminary SWMP submittal. (1) A digital copy of the preliminary SWMP plan shall be submitted with the submittal of a preliminary plat for review and acceptance; or for a minor plat, as required by city engineer or community development director. (2) The preliminary SWMP shall be labeled as "Preliminary." (3) The preliminary SWMP shall be signed, sealed, and dated by the professional engineer (P.E.), or shall contain a statement showing the professional engineer's name and license number and affirming the preliminary SWMP was prepared under the direction of the engineer and that the plan is preliminary. Sec. 38-44.4. Preliminary drainage plan. (a) Purpose and applicability. (1) The preliminary drainage plan is a guide for the detailed drainage design within the related construction plans, final plat, and development plans/permits. (2) A preliminary drainage plan shall be prepared for all developments in accordance with the requirements set forth in the application form. (b) Plan required, previous plans, and waivers. (1) For any property involved in the development process, a preliminary drainage plan shall be provided, at the developer's expense, for the area proposed for development. (2) For property with a previously accepted preliminary drainage plan, the accepted preliminary drainage plan may be submitted and enforced unless a revised preliminary drainage plan is required by the city due to lot reconfiguration or other conditions created by the new plat. (3) The city engineer may waive the requirement for a preliminary drainage plan if the submitted plat is not anticipated to cause any significant change in runoff characteristics from a previously accepted drainage study or for single residential properties where no drainage problems are anticipated. (4) If the applicant requests a waiver in writing, a copy of any previous drainage plan shall be provided. (c) Standards and criteria. (1) The preliminary drainage plan shall show the watershed affecting the development and how the runoff from the fully-developed watershed will be conveyed to, through, and from the development. (2) The preliminary drainage plan must comply with the standards and outlined in: a. This Subdivision Ordinance. b. The Engineering Standards Manual and construction details. c. The Code of Ordinances (e.g., chapters 13 and 43). (3) The review of the preliminary drainage plan does not constitute final drainage plan approval related to construction plans or development plans/permits or authorize a waiver to this Subdivision Ordinance. (d) Preliminary drainage plan submittal. (1) Three (3) paper copies of the preliminary drainage plan shall be submitted with the submittal of a preliminary plat for review and acceptance; or for a minor plat, as required by city engineer or community development director. (2) The preliminary drainage plan shall be labeled as "Preliminary." (3) The preliminary drainage plan shall be stamped by and dated by the engineer, professional. Sec. 38-44.5. Floodplain development requirements. All development proposed adjacent to or within the 100-year floodplain shall be in accordance with the city's flood hazard prevention ordinance and this Subdivision Ordinance. Sec. 38-44.6. 100-year floodplains. (a) Floodway restrictions. (1) Development within a floodway prohibited. For the health, safety, and welfare of residents and for the conservation of water, storm drainage, and sanitary sewer facilities, development of any portion of a property that lies within the floodway of any 100-year floodplain shall be prohibited. (b) 100-year floodplain restrictions. (1) All 100-year floodplains shall be maintained in an open natural condition, unless authorized in writing by the city. (2) Certain activities within the 100-year floodplain prohibited. a. 100-year floodplains shall be protected from destruction or damage resulting from clearing, grading, and dumping of earth, waste or other foreign materials. b. Clearing, grading, excavation or filling of any area within the 100-year floodplain shall be prohibited unless authorized in writing by the city. (3) All 100-year floodplains are subject to the following requirements for all types of development: a. The 100-year floodplain shall be dedicated on the final plat to the city as a single lot or may be owned and maintained by an HOA, pursuant to section 38-50, Homeowners' association (HOA) requirements, of this Subdivision Ordinance. b. At no time shall any portion of the 100-year floodplain exist or be within any single-family or two-family residential lot. Figure 8: 100-Year Flood Elevation Example [image omitted; see the official code] (c) Flood access and maintenance easement. A fifteen-foot wide maintenance easement shall be required for maintenance purposes as required by the city engineer adjacent to the floodway (See Figure 57: Streets Adjacent to the Floodplain). (d) Retaining wall(s). A retaining wall(s) may be allowed between a house and the 100-year floodplain as approved by the city engineer. (e) Adjacent street(s) widths. The size of streets adjacent to a 100-year floodplain shall have a minimum right-of-way width of fifty (50) feet. (f) Adjacent street types. (1) Phases. Street requirements shall be reviewed per development phase. (2) Parallel streets. A minimum sixty (60) percent of the linear frontage of the 100-year floodplain shall be adjacent to a parallel street (See Figure 57: Streets Adjacent to the Floodplain). (3) Cul-de-sac streets. a. No more than one (1) cul-de-sac in a row. b. Culs-de-sac shall comply with the following criteria (See Figure 58: Culs-de-Sac Adjacent to a 100-Year Floodplain): 1. A minimum fifty (50) percent of an adjacent cul-de-sac bulb shall be open to the 100-year floodplain and no residential lot shall encroach within the area between this line and the major creek. 2. An entry monument(s) or feature(s) as well as landscaping shall be provided at the end of the cul-de-sac and a pathway of a minimum twelve (12) feet in width shall be provided to the major creek as approved by the director of community development. (g) Fences. Fences adjacent to a 100-year floodplain shall comply with the following criteria (See Figure 59: Fencing Options for Lots Abutting a 100-Year Floodplain): (1) Have a maximum fifty (50) percent opacity; (2) Have a height of six (6) feet to eight (8) feet as measured from grade at that location; (3) Ornamental metal fences, with either masonry columns or a masonry base of a maximum three (3) feet in height shall be located along the rear and side of the lots, are subject to city review and approval by the director of community development; and (4) The lot owner is responsible for the maintenance of the fence. (h) Exceptions for planned unit development. For properties that have an approved planned unit development (PUD) ordinance adopted prior to the effective date of this Subdivision Ordinance, subsection (f) above (Adjacent street types) shall not apply; provided, however, said properties are subject to the following conditions: (1) Any lot that backs to the 100-year floodplain shall have a minimum rear yard setback of twenty-five (25) feet; (2) Any lot that sides to the 100-year floodplain shall have a minimum side yard setback of fifteen (15) feet; (3) Alternating culs-de-sac and looped streets shall be provided at intervals not to exceed one thousand five hundred (1,500) feet for access to the 100-year floodplain; and (4) The 100-year floodplain shall be available to public access from the end of a cul-de-sac. (i) Additional studies. At the request of the city, the property owner shall submit additional studies, including but not limited to the following, as deemed appropriate and necessary by the city, as part of the preliminary plat submittal requirements. These studies shall be considered during review and approval of the preliminary plat: (1) Wetland delineation study; (2) Habitat study; (3) Vegetative study; (4) Storm drainage study; (5) Riparian (i.e., tributary) study; (6) Flood study; and (7) Downstream assessment study.

(Ord. No. 3180, § 2, 8-14-12; Ord. No. 3502, § 8, 1-10-23)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.