For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 355-16 — Approval or denial

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 355-16

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/526cc50f-b711-456c-9e34-6eac227c037d

§ 355-16: Approval or denial.

A. In granting any approval, the City may attach such conditions thereto as may be deemed necessary to prevent damage or danger to public or private property, or any sewer, storm drain or watercourse, or to prevent the operation from being conducted in a manner hazardous to life or property, or in a manner likely to create a nuisance. Such conditions may include but are not limited to the erection or installation of walls, drains, dams and structures, plantings, and vegetation, erosion and sediment control measures or devices, furnishing necessary easements, and a specified method of performing the work. No plans shall be approved nor permits issued until grading, erosion and sediment control plans, specifications, timing schedule and cost estimate are approved by the City and the developer certified that all work shall be performed pursuant to the approved plans, specifications and schedules. B. If the plans conform to the requirements of this chapter, the City shall approve the same and forward one copy to the developer within 45 days. If the plans do not conform, they shall be disapproved by the City and the written reasons shall be forwarded to the developer without unreasonable delay. C. After actual work begins, the City may require additional or revised controls from time to time in the event the originally approved plans prove to be inadequate.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.