For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 355-8 — Erosion and sedimentation control plan

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 355-8

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/e6905cc7-cad0-49a0-929e-5136e93a0a37

§ 355-8: Erosion and sedimentation control plan.

A. The erosion and sedimentation control plan shall be prepared by a registered professional, as defined herein, trained and experienced in erosion and sedimentation control methods and techniques. B. The erosion and sedimentation control plan shall be designed to prevent accelerated erosion and sedimentation and shall consider all factors which contribute to erosion and sedimentation including, but not limited to, the following: (1) Hydrology. Analysis of natural drainage patterns and water resources including an analysis of streams, natural drainage swales, ponds or lakes, marsh areas, floodplain areas, permanent high water table areas, seasonal high water table areas throughout the site and amount of runoff from the project area and the upstream watershed area. (2) Geology. Analysis of characteristics of rock formations underlying the site including defining aquifers, particularly those locally subject to pollution, shallow bedrock areas and areas in which rock formations are unstable. (3) Soils. Analysis of types of soils present in the site area including delineation of prime agricultural soil areas, aquifer recharge soil areas, unstable soils, soils most susceptible to erosion and soil limitations for urban development. The analysis of soils will be based on the County Soil Survey of the United States Department of Agriculture Natural Resources Conservation Service. (4) Topography. Analysis of terrain of the site including delineation of elevation and slope areas. (5) Vegetation. Analysis of tree and plant cover of the site, emphasizing plant species to be retained. (6) The proposed alteration to the site. (7) The staging of earthmoving activities. (8) Temporary control measures and facilities for use during earthmoving. (9) Permanent control measures and facilities for long-term protection. (10) A maintenance program for the control facilities including disposal of materials removed from the control facilities or project area.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.