For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 355-6 — Plan requirement

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 355-6

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/53521ffa-2bb1-41c7-a5bd-7acd0493b7ba

§ 355-6: Plan requirement.

A. Prior to the initiation of any phase of a land development project, plans as specified herein shall be submitted to the City for review and approval in the following instances: (1) Grading, involving: (a) The following: [1] More than 200 cubic yards on slopes of 0% to 5%. [2] More than 50 cubic yards on slopes of 6% to 15%. [3] More than 20 cubic yards on slopes of 15% or greater; (b) An excavation or fill, five feet or more in vertical depth at its deepest point as measured from the natural ground surface of any slope with a gradient of 15% or more; (c) Excavation below finished grade for basement, cellar and/or foundation of any aboveground structure, swimming pool or underground structure on a lot with an average existing slope with a gradient of 15% or more; (d) An easement for a public sewer, water main, storm drain or power line; (e) An encroachment on or alteration of an existing drainage channel or watercourse. (2) Removal of trees, vegetation or other natural ground cover: (a) Over an area in excess of 45,000 square feet on slopes of 0% to 5%. (b) Over an area in excess of 10,000 square feet on slopes of 6% to 15%. (c) On any slope with a gradient in excess of 15%. (3) Surfacing and paving of land other than streets or ways with hard surface or compacted nonpermeable material such as asphalt, concrete or slag, with area in excess of 10,000 square feet. (4) Transportation of any material for disposal purposes over public streets, in excess of 50 cubic yards total quantity. (5) Any major excavating, grading or filling project as stated in the definitions section of this chapter. B. Plans shall not be required by virtue of this chapter for any of the following: (1) Grading or paving for street improvement, when such improvement is covered by other regulations and permits of the City. (2) An excavation or fill below finished grade for basement and/or foundation of an aboveground structure, swimming pool or underground structure, other than on a lot with an average gradient of 15% or more. (3) When otherwise authorized by a valid building permit and when the plan of such excavation is included in the building permit evaluation and has been approved.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.