§ 355-9: Erosion and sedimentation control measures and facilities.
The erosion and sedimentation control facilities set forth herein shall be appropriately incorporated into all earthmoving activities, unless the designer of the erosion and sedimentation control plan shows to the satisfaction of the City that alteration of these measures and facilities or inclusion of other measures and facilities will prevent accelerated erosion and sedimentation. A. Control measures. (1) All earthmoving activities shall be planned in such a manner as to minimize the extent of disturbed land. (2) All surface water shall be diverted away from the project area in such a manner as to minimize erosion but not create a hazard to persons or property. (3) All permanent facilities for the conveyance of water around, through or from the project area shall be designed or contain facilities to limit the velocity of flow in the facilities to less than 1.5 feet per second. (4) All slopes, channels, ditches or any disturbed area shall be stabilized as soon as possible after the final grade or final earthmoving has been completed. (5) Where it is not possible to permanently stabilize a disturbed area immediately after the final earthmoving has been completed, or where the activity ceases for more than 20 days, interim stabilization measures shall be implemented promptly. (6) All runoff from a project area shall be collected and diverted to facilities for removal of sediment. (7) Runoff from a project area shall not be discharged into any watercourse as defined herein without means to control sedimentation. (8) Measures for the control of runoff or collection of sediment shall be established prior to any other earthmoving activity on the site. B. Control facilities. (1) Diversion terraces. (a) Diversion terraces shall be constructed upgrade of a project area to convey runoff around the project area. For temporary diversion, the channel shall have a capacity to convey 1.6 cubic feet per second per acre of land tributary to it. For permanent diversion, the channel shall have a capacity to convey 2.75 cubic feet per second per acre of land tributary to it. (b) Diversion terraces shall be grassed or lined with erosion-resistant material to prevent accelerated erosion within the channel. (c) Outlet structures shall be designed to maintain a discharge velocity of less than 3.0 feet per second and shall be stabilized before use. (2) Interceptor channels. (a) Interceptor channels may be used within a project area to reduce the velocity of flow and thus prevent accelerated erosion. (b) Water collected by interceptor channels shall be conveyed to sedimentation basins or to vegetated areas but not directly to streams. (c) Outlets to vegetated areas shall be designed to have a velocity of less than three feet per second. (3) Channels of conveyance. All channels used to convey water through a project area shall be designed to have a velocity of less than 1.5 feet per second. Where this is not possible, the channel shall be grassed or lined with erosion-resistant material. (4) Sedimentation basins. (a) A sedimentation basin shall have a capacity of 7,000 cubic feet for each acre of project area tributary to it, and shall be provided with a twenty-four-inch freeboard. (b) The basin shall be cleaned when the storage capacity of the basin is reduced to 5,000 cubic feet per acre of project area tributary to it. (c) Outlet structures shall be designed to pass a minimum flow of 2.0 cubic feet per second for each acre of project area tributary to. (d) The discharge from a sedimentation basin shall be to a watercourse as defined herein. (e) Sedimentation basins shall be structurally sound and protected from unauthorized acts of third parties. (5) Stabilization. Upon completion of the project, all areas where disturbed by the project shall be stabilized so that accelerated erosion will be prevented. (6) Interim control measures. Any erosion and sedimentation control facility required or necessary to protect areas from erosion during the stabilization period shall be maintained until stabilization is completed. (7) Final measures. Upon completion of stabilization, all unnecessary or unusable control facilities shall be removed, the areas shall be graded and the soils shall be stabilized.
Ask a question about Allentown law
Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.