Sec. 31-323.2. - Construction stream buffer zone requirements.
1. Construction stream buffer zones shall be designated on the plans and marked off with high visibility safety fencing before land disturbance or construction commences. ..... 2. The construction stream buffer is required to protect Waters of the State located within or immediately adjacent to boundaries of the project as identified using methodology from Standard Operating Procedures for Hydrologic Determinations (see rules to implement a certification program for Qualified Hydrologic Professionals, TN Rules Chapter 0400 -40-17). ..... 3. A thirty (30) foot natural riparian construction stream buffer zone shall be left undisturbed adjacent to all streams, to the maximum extent practicable, during construction activities at the site. ..... 4. Construction stream buffer zones are not primary sediment control measures and should not be relied on as such. Rehabilitation and enhancement of a natural buffer zone is allowed, if necessary, for improvement of its effectiveness of protection of the Waters of the State. The buffer zone requirement only applies to new construction sites. The riparian buffer zone should be preserved between the top of stream bank and the disturbed construction area. Nothing contained in this paragraph shall be construed to reduce the requirements of the permanent Water Quality Buffer required elsewhere in this Article. ..... 5. For sites that contain and/or are adjacent to a receiving stream designated as having unavailable parameters or Exceptional Tennessee waters, a sixty (60) foot natural riparian construction stream buffer zone adjacent to the receiving stream shall be preserved. The buffer zone should be established between the top of stream bank and the disturbed construction area. The buffer width can be averaged, as long as the minimum width is at least thirty (30) feet at any measured location. If the construction site encompasses both sides of a stream, buffer averaging can be applied to both sides, but must be applied independently. ..... 6. Rehabilitation and enhancement of a natural buffer zone is allowed, if necessary, for improvement of its effectiveness of protection of the Waters of the State. ..... 7. The buffer zone requirement applies to all construction sites. No construction activities or Land Disturbing Activities (including but not limited to: parking, movement of vehicles, storage of materials, clearing, applying gravel, concrete washouts, etc.) shall take place within the buffer zones. ..... 8. Equivalent Buffer Zone BMPs: ..... A. A justification for use and design of equivalent construction stream buffer zone BMPs shall be included in the EPSC Plan or SWPPP. Such equivalent BMPs are expected to be routinely used for installations that typically must be located adjacent to surface waters. These may include, but are not limited to: water distribution and sewer line installations, roadway construction, utility line or equipment installation, greenway construction, construction of a permanent outfall or a velocity dissipating structure, etc. This will be approved by the City on case by case basis. ..... B. This requirement does not apply to any valid ARAP, or equivalent permits issued by federal authorities. Additional buffer zone requirements may be required on a case by case basis depending on slope, land use or other variable. ..... C. Delineate the buffer zones, of thirty (30) or sixty (60) foot, with a single row of high visibility safety construction fencing in addition to any silt fencing that may be required to be installed. ..... D. Buffer zone exemption based on existing uses. ..... E. Buffer zones shall not be required where certain land uses exist and are to remain in place according to the following: ..... i. A use shall be considered existing if it was present within the buffer zone and properly permitted, as applicable, as of the date of the NOI for coverage under the CGP. Existing uses shall include, but not be limited to, buildings, parking lots, roadways, utility lines and on-site sanitary sewage systems. Only the portion of the buffer zone that contains the footprint of the existing land use is exempt from buffer zone development restrictions. Activities necessary to maintain uses are allowed provided that no additional vegetation is removed from the buffer zone. ..... ii. If an area with an existing land use is proposed to be converted to another use or the impervious surfaces located within the buffer area are being removed, then the buffer zone requirements shall apply. .....
(Ord. No. 12900, § 1, 2-3-15; Ord. No. 13251, § 1, 11-28-17)