For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-324.1 — Erosion prevention and sediment controls inspections

Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-324.1

Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/3584b1c7-68ca-47bb-8365-19767a4ee365

Sec. 31-324.1. - Erosion prevention and sediment controls inspections.

Erosion prevention and sediment controls inspections shall be done according to the Handbook. 1. All active construction sites shall be inspected by permittee or his designee twice weekly (performed at least seventy-two (72) hours apart), in accordance with the requirements of the CGP by a person that has an active certification completing the "Fundamentals of Erosion and Sediment Control Level I" course. ..... 2. Inspections are performed to ensure erosion prevention and that sediment controls are not damaged and remain effective. It is not the City's intent to penalize proper maintenance and mitigation of failed management practices, but rather to ensure that potential and actual failures are promptly recognized and addressed expeditiously and effectively. During prolonged rainfall, daily checking and repairing is necessary. The permittee shall maintain records of such checks and repairs. ..... 3. A specific person, that has an active certification completing the "Fundamentals of Erosion and Sediment Control Level I" course, shall be designated by owner to be responsible for erosion and sediment controls on each site. ..... 4. Routine inspections are required. Inspection records and rainfall data shall be maintained on or near the construction site and be accessible. Copies of the written reports must be kept with the EPSC Plan or SWPPP. They must provide enough information that a regulator is given a full picture of the management techniques employed onsite, including problems, maintenance needs, and corrective actions taken. These reports need to clearly note the dates when: ..... A. problems or maintenance needs were identified ..... B. these activities were addressed ..... C. major grading activities occurred ..... D. construction activities temporarily or permanently ceased on a portion of the site ..... E. stabilization measures were initiated ..... 5. Based on inspection results, any control measures that are inadequate or in disrepair shall be replaced or modified, or repaired as necessary, before the next rain event, but in no case more than seven (7) days after the need is identified. Such modifications shall provide for timely implementation (site description identified and Erosion prevention and sediment control measures) of any changes to the SWPPP but in no case later than fourteen (14) days following the inspection. ..... 6. Falsifying inspection records or other documentation or failure to complete inspection documentation shall result in an enforcement action. ..... 7. A construction site rainfall gauge is required. It should be read at least daily at approximately the same time to obtain a twenty-four (24) hour rainfall depth total. In addition, when a rain event occurs, the approximate beginning and ending time should be documented to provide its duration. The rainfall depth and duration together can be used to determine the storm frequency and related back to the permit and design requirements. Rainfall data should be kept with the field EPSC Plan or SWPPP. ..... 8. Erosion prevention and sediment controls shall be designed to minimize erosion and sediment transport resulting from a two (2) year, twenty-four (24) hour storm at a minimum (or five (5) year twenty-four (24) hour storm associated with waters having unavailable parameters or Exceptional Tennessee Waters), either from total rainfall in the designated period or the equivalent intensity. The performance of construction site assessments will provide quality assurances of erosion prevention and sediment controls. Within one (1) month of the commencement of construction, at each portion of the site that drains developed acreage, the site assessment shall be conducted, at each outfall, when drainages total ten (10) or more acres or five (5) or more acres if draining to waters having unavailable parameters or Exceptional Tennessee Waters. The site assessment shall be performed per requirements in the current State CGP. It shall be performed by individuals with the following qualifications: ..... • A licensed professional engineer or landscape architect; • A CPESC; or • A person that successfully completed the "Level II Design Principles for Erosion Prevention and Sediment Control for Construction Sites" course.

(Ord. No. 12900, § 1, 2-3-15; Ord. No. 13251, § 1, 11-28-17)

Ask a question about Chattanooga law

Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.