Sec. 31-324. - General requirements.
No Land Disturbing Activity shall be conducted within the City except in such a manner that: 1. Stripping of vegetation, re-grading, and other development activities shall be conducted so as to minimize erosion. Clearing and grubbing must be held to the minimum necessary for grading and equipment operation. Pre-construction vegetative ground cover shall not be destroyed, removed or disturbed more than fifteen (15) calendar days prior to grading or earth moving. Construction must be sequenced to minimize the exposure time of cleared surface area. ..... 2. Property owners shall be responsible upon completion of Land Disturbing Activities to stabilize slopes so that they will not erode. BMPs should be employed as described in the Handbook. The objective will be to leave the site as erosion-free and maintenance-free as practicable. ..... 3. Natural vegetation shall be retained, protected, and supplemented, where practicable. ..... 4. After final grading is reached on any portion of a site, permanent soil stabilization shall be installed as soon as practicable. This is accomplished with perennial vegetation (using native herbaceous and woody plants where practicable) or other permanently stable, non-eroding surface. Unpacked gravel containing fines (silt and clay sized particles) or crusher runs are not considered a non-eroding surface. Soil stabilization refers to measures which protect soil from the erosive forces of wind, raindrop impact and flowing water. It includes the growing of grass or sod, application of straw, mulch, fabric mats, and the early application of gravel base on areas to be paved. ..... 5. A permanent vegetative cover shall be established on disturbed areas not otherwise permanently stabilized. Use of native vegetation is encouraged. ..... 6. Neighboring persons and property shall be protected from damage or loss resulting from excessive stormwater runoff, soil erosion or deposition upon private property or public streets of water transported silt and debris. Adjacent property owners shall be protected from land devaluation due to exposed bare banks. ..... 7. Erosion and sediment control measures must be in place and functional before earth moving operations begin. They must be constructed and maintained until permanent stabilization occurs. Temporary measures may be removed at the beginning of the work day, but must be replaced at the end of the work day or before any precipitation event that could cause erosion and/or deposition of sediments off-site. ..... 8. Structural controls shall be designed and maintained as required to prevent pollution. All surface water flowing toward the construction area shall to the extent practicable be diverted by using berms, channels, or sediment traps as necessary. Erosion and sediment control measures shall be designed according to the size and slope of disturbed or drainage areas, to detain runoff and trap sediment. Muddy water to be pumped from excavation and work areas must be held in settling basins or treated by filtration or coagulation prior to its discharge. Discharges from sediment/settling basins and traps must be discharged through a pipe or lined channel so that the discharge does not cause erosion and sedimentation. ..... 9. There shall be no distinctly visible floating scum, oil or other matter contained in the stormwater discharge. The stormwater discharge must not cause an objectionable color contrast in the receiving water. The stormwater discharge must result in no materials in concentrations sufficient to be hazardous or otherwise detrimental to humans, livestock, wildlife, plant life, or fish and aquatic life in the receiving stream. ..... 10. When the land disturbing activity is finished and stable perennial vegetation has been established on all remaining exposed soil, the developer shall notify the City of these facts and request termination of the permit issued under this section. The City shall then inspect the site after receipt of such notice. The City may require ongoing or additional measures to stabilize the soil and prevent erosion. If such requirements are given by the City, the owner or developer shall continue to be covered by the provisions of this section, until a NOT of the permit has been accepted by the City. ..... 11. Stabilization measures shall be initiated as soon as possible in portions of the site where construction activities have temporarily or permanently ceased. Temporary or permanent soil stabilization must be completed no later than fourteen (14) days after the construction activity in that portion of the site has temporarily or permanently ceased. In the following situations, temporary stabilization measures are not required: ..... A. where the initiation of stabilization measures is precluded by snow cover or frozen ground conditions or adverse soggy ground conditions, stabilization measures shall be initiated as soon as practicable; or ..... B. where construction activity on a portion of the site is temporarily ceased, and earth disturbing activities will be resumed within fourteen (14) days. Steep slopes shall be temporarily stabilized not later than seven (7) days after construction activity on the slope has temporarily or permanently ceased. ..... 12. Stabilization of disturbed areas must, at a minimum, be initiated immediately whenever any clearing, grading, excavating or other earth disturbing activities have temporarily or permanently ceased on any portion of the site, and will not resume for a period exceeding fourteen (14) calendar days. Soil stabilization (temporary or permanent) of those disturbed areas must be completed as soon as possible, but not later than fourteen (14) days after the construction activity in that portion of the site has temporarily or permanently ceased. In arid, semiarid, and drought-stricken areas where initiating vegetative stabilization measures immediately are infeasible, alternative stabilization measures (such as, but not limited to: properly anchored mulch, soil binders, matting) must be employed. ..... 13. Dewatering: Discharges from dewatering activities, including dewatering of trenches and excavations, are prohibited unless managed by appropriate controls. Appropriate controls include, but are not limited to: weir tank, dewatering tank, gravity bag filter, sand media particulate filter, pressurized bag filter, cartridge filter, coagulation or other control units providing the level of treatment necessary to comply with permit requirements. ..... 14. Prevent off-site vehicle tracking of sediments and the generation of dust. A stabilized construction access (a point of entrance/exit to a construction site) shall be described and implemented, as needed, to prevent the tracking of mud and dirt onto public roads by construction vehicles. ..... 15. If permanent or temporary vegetation is to be used as a control measure, then the timing of the planting of the vegetation cover must be included in the SWPPP. ..... 16. Litter, construction debris, and construction chemicals exposed to stormwater shall be picked up prior to anticipated storm events or before being carried off site by wind (e.g., forecasted by local weather reports), or otherwise prevented from becoming a pollutant source for stormwater discharges (e.g., screening outfalls, daily pick-up, etc.). After use, materials used for erosion prevention and sediment control (such as silt fence) should be removed or otherwise prevented from becoming a pollutant source for stormwater discharges. ..... 17. Construction Phasing: See CGP for requirements. ..... 18. Construction Staging: See Handbook and CGP for requirements. ..... 19. Sediment Basins: See Handbook for requirements. ..... 20. The City may require stricter land use and/or erosion and sediment control requirements for projects discharging into waters having unavailable parameters or Exceptional Tennessee Waters. .....
(Ord. No. 12900, § 1, 2-3-15; Ord. No. 13251, § 1, 11-28-17)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.