For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-324.2 — Water Quality Buffer

Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-324.2

Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/ee77e078-c9ef-453f-8935-48ee1246e911

Sec. 31-324.2. - Water Quality Buffer.

1. A Water Quality Buffer zone is a strip of undisturbed native (indigenous) vegetation and soil that includes trees, shrubs and herbaceous vegetation either original or re-established that borders waters of the state. ..... 2. A Water Quality Buffer shall be applied to 'waters of the state' including but not limited to streams, rivers, jurisdictional wetlands, springs, reservoirs or lakes and ponds with hydrologic connectivity (streams leading into and out of the pond or spring input) and sinkholes, adjacent to new development or significant redevelopments. The buffer regulations shall require protection and maintenance of existing buffers, including soils and vegetation, on all existing properties, as determined by the city. ..... 3. Water Quality Buffers zones are most effective when stormwater runoff flows into and through them as shallow sheet flow, rather than in concentrated form such as in pipes, channels, gullies, splays, or wet weather conveyances. Therefore, whenever possible, designs should include management practices, to the maximum extent practical, that result in shallow, non-erosive sheet flow through buffers. When this is not possible, every effort shall be made to minimize detrimental effects to the water quality buffer. ..... 4. Water Quality Buffer zones protect the physical and ecological integrity of water bodies from surrounding upland activities in the following ways: ..... A. Filter excess sediment, organic material, nutrients, and other chemicals; ..... B. Reduce storm runoff velocities; ..... C. Provide flood protection; ..... D. Protect channel bank areas from scour and erosion; ..... E. Shade and cool adjacent water allowing it to hold adequate levels of dissolved oxygen; ..... F. Provide leaf litter and large woody debris important to aquatic organisms; and ..... G. Improve stream bank habitat for aquatic organisms. ..... 5. A Water Quality Buffer shall consist of native vegetation along both sides of a stream or around other applicable water resources or waters of the state. The buffer is measured perpendicular from top of bank determined by the break in the slope. The top of bank is the uppermost limit of the active channel, typically indicated by a change in bank slope from steep to gentle. If the top of bank cannot be determined from the above indicator or if there is a dispute in the determination, it can be determined by submitting approved engineering calculations that determine the width of the stream resulting from the two (2) year frequency storm. The city shall make final determinations of buffer delineations, top of bank, areas where the Water Quality Buffer shall apply and buffer widths, based on the applicant's submitted data. ..... 6. The city may approve alternate Water Quality Buffer widths for special circumstances (e.g., existing land cover or existing physical conditions) that preclude the above requirements. ..... 7. Specifically prohibited uses include, but are not limited to: pavements, structures, parking lots, dumpster storage, material storage, grease-bin storage, vehicle storage/maintenance, animal lots or kennels, or other uses known to contribute runoff or pollutants to waterways. ..... 8. Buffer Widths: ..... Buffer widths shall be measured from the edge of the water resource to be protected as defined below. A. Streams: ..... i. For drainage basins less than one (1) square mile: ..... a. The permanent Water Quality Buffer shall be thirty (30) feet measured perpendicular from the top of bank on both sides with no averaging. ..... b. For sites that contain and/or are adjacent to a receiving stream designated as waters having unavailable parameters or Exceptional Tennessee waters, a sixty (60) foot natural riparian construction stream buffer zone adjacent to the receiving stream shall be preserved during construction. The buffer zone shall be established between the top of stream bank and the disturbed construction area. The sixty (60) foot criterion can be established on an average width basis as long as the minimum buffer width is at least thirty (30) feet at any measured location. ..... ii. For drainage basins greater than one (1) square mile, the permanent Water Quality Buffer shall be sixty (60) feet from top of bank on both sides. It can be averaged as long as the minimum is no less than thirty (30) linear feet measured perpendicular from the top of bank on both sides. When the average width method is used, applicant must provide CAD files allowing the measurements to be verified. ..... iii. In accordance with the NPDES permit TNS068063, the Site Development Manager shall develop and apply criteria for determining the circumstances under which averaging may occur. A determination that standards cannot be met may not be based solely on the difficulty or cost associated with implementation. ..... B. Lakes and ponds with hydrologic connectivity: ..... The Water Quality Buffer shall be thirty (30) feet from normal pool. If a flood zone study exists or is prepared, elevations of proposed structures adjacent to the lake or pond setback shall be determined and included in the final design. C. Wetlands: ..... The Water Quality Buffer shall be thirty (30) feet with no disturbance. If the wetland is associated with or within the water quality buffer or other protected waters, then the buffer shall be measured according to the Water Quality Special Buffer Widths defined in this Article. 9. Permanent buffers shall be preserved during development and perpetually afterwards. ..... A. During development, buffers shall be clearly marked, on plans and on site, and protected from construction activities. ..... B. The Water Quality Buffer shall be retained in its natural vegetative state or enhanced. No unapproved clearing of existing native vegetation in the streamside buffer or BMPs/SCMs shall be allowed. The target vegetation is undisturbed mature forest. ..... 10. Water Quality Buffer Allowable Uses: ..... A. Buffer crossings for utilities and infrastructure: To the extent practical, the number and width of water body crossings shall be limited. Whenever feasible, crossings shall occur at right angles. Developments should coordinate infrastructure, utility and road crossings to attempt to have them occur at the same location. ..... B. Passive recreation and footpaths to approach the river without constructed improvements. A plan must be approved by the City. ..... C. A sidewalk, greenway or other paved trail may be considered, if constructed of pervious concrete or other pervious materials, excluding asphalt, approved by the city, and established on a stable stream area no closer than twenty (20) feet from the top of the bank. No equipment larger than a mini-Bobcat or other similarly sized equipment (specifically tasked with pervious material installation) may enter the buffer. Trees over six (6) inches dbh cannot be disturbed in the buffer area, during construction. The width of the pervious sidewalk, and any clearing as a result of construction, shall be added to the width of the water quality buffer. Protection of the existing vegetation is of prime importance. ..... D. Stormwater channels, as approved by city: vegetated channels and use of dissipating and sheet flow arrangements where appropriate to prevent channelization and erosion in the buffer from stormwater runoff adjacent to the buffer from SCMs or any other aspect of the site. ..... E. Landscaping or other related re-vegetation using native vegetation to address erosion, damaged vegetation, restoration, remove exotic species, or other problems; Landscaping, bank stabilization, or other developer proposed restorations to restore a natural stream corridor habitat shall be submitted as a Landscape Management Plan to the city as a supplement to the Land Disturbance Permit. Developers must obtain any related local, state, TVA or federal permits. The City must approve the specific requirements of such plan prior to the issuance of a Land Disturbance Permit and before any work or proposed restoration on the buffer takes place. ..... F. Removal of individual trees that are in danger of falling, causing damage to dwellings or other structures, or blocking the stream; ..... 11. Water Quality Buffers shall be placed in open space easements and recorded with the deed for the property before Certificate of Occupancy is issued. ..... 12. Water Quality Special Buffer Widths. Water Quality Buffer widths shall vary depending on the presence of certain water pollution hazards. The following special buffer widths shall apply: ..... A. Solid waste landfills, outdoor recycling or processing facilities require one hundred fifty (150) feet. ..... B. Salvage yards or automobile recyclers require one hundred fifty (150) feet. ..... C. When wetlands, sinkholes or other water resources are wholly or partially located within a stream or the streamside buffer edge, the streamside buffer width shall be extended by the width of the water resource. ..... D. If more than one (1) of the aforementioned is applicable, the greater width adjustment shall apply. ..... E. Onsite, private septic system drain fields should not automatically be located at the outer edge of property lines adjacent to undisturbed buffers. To the maximum extent possible, drain fields should be located to increase their separation from protected stream side areas. ..... 13. Water Quality Buffer Width Reductions, Clearing Activities, and Crossings. ..... A. Special Buffer Widths may be reduced in conjunction with targeted restoration plans that make comparable improvements to water quality. Restoration plans may include stream bank restoration, re-vegetation, habitat improvements, or other bioengineering methods. The City shall consider such requests upon receipt of a Landscape Management Plan detailing comparable improvements. Special buffer reductions will only be considered for specific areas of an overall development. ..... B. View Corridor: Limited clearing and pruning to establish a view corridor may be permitted with an approved Landscape Management Plan stamped by a registered Landscape Architect. The Plan must leave adequate vegetation in the view corridor to maintain the buffer's function. ..... i. Preferential practices for view enhancement are crown raising, crown lowering, or crown thinning in lieu of tree removal. Any removal of trees shall be in accordance with the City of Chattanooga Municipal Code. The SWPPP or EPSC plan shall demonstrate both effective erosion prevention and sediment control and forestry practices. ..... ii. Removed trees must be replaced. Replacement by shrubs or small trees may be allowed if native plants, approved on the Landscape Management Plan, are used. ..... iii. A Notice of Violation and/or Civil Penalty, as set forth in Section 31-346 shall be issued if clearing exceeds approved Plans. The landowner shall re-plant that segment of the cleared buffer at his/her own expense. ..... C. The City may allow new driveways, road crossings or other access through or across water quality buffer zones on a case-by-case basis. The necessity of buffer access must be demonstrated. Additionally, it must be shown that the buffer zone will not be excessively impacted. Driveway or road crossing shall be constructed perpendicular to the stream or buffer with careful detail to protecting trees and vegetation and minimizing site grades. ..... D. Roadways and lots shall be designed and aligned so streams are either to the rear or to the side of individual lots, and not along the front. Such stream crossings may require federal, state, and/or local permits. ..... 14. Development Plan and Construction Activity Requirements. ..... A. The parameters and boundaries of the Water Quality Buffer shall be delineated by the applicant and clearly indicated on all three (3) phases of project development plans, on landscape management plans, preliminary plats, final plats, permits and official maps as follows: ..... i. Show the extent of any Water Quality Buffer on the subject property and clearly label as "water quality buffer" including required width. ..... ii. Provide a note to reference the water quality buffer, labeled as: ..... " There shall be no clearing, grading, construction, storage, or disturbance of vegetation except as permitted in writing by the City of Chattanooga's Site Development Manager. " iii. Provide a note to reference protective covenants governing all water quality buffer areas, labeled as: "Any Water Quality Buffer is subject to protective covenants recorded in the Register of Deeds (Hamilton County). Disturbance and use of these areas are restricted. Severe penalties apply." ..... 15. Water Quality Buffer areas shall be protected during all development activities. Construction layout surveys shall include approved fencing and labeling. To insure adequate visibility, a combination of fencing and flagging is required. Signs shall persist before and throughout construction to prevent entry of equipment, materials storage and stockpiling. ..... 16. All Water Quality Buffers shall be placed in recorded easements and be maintained at the property owner's expense. ..... 17. Variance Procedures. ..... A. The applicant shall submit a written request to the Site Development Manager conveying specific reasons and hardships necessitating the variance. It must offer mitigation for the variance relief if granted, and include any other information necessary to evaluate the request. The City may require an alternative analysis. ..... B. The City shall have the authority to grant appeals provided they are consistent with the objectives and policies identified in this Article. ..... C. Variance requests shall be reviewed and may be granted using the following criteria: ..... i. Projects or activities where it can be demonstrated that strict compliance with the ordinance would result in practical difficulty; Each of the following criteria must be satisfied to show practical difficulty: ..... (a) The problem is not self-created. ..... (b) The plight of the landowner is due to the property's unique physical conditions. ..... (c) Compliance will unreasonably prevent use of the property for a permitted purpose or would render conformity with such restrictions unnecessarily burdensome. ..... (d) Project is to repair and maintain public improvements. Avoidance and minimization of adverse impacts to wetlands and associated aquatic ecosystems has been addressed. ..... (e) Those projects or activities serving a public need and/or deemed to be of economic importance to the City, specifically associated with the Tennessee River or associated with or contiguous to the City's Greenway Master Plan, to where no feasible alternative is available. Development along the Tennessee riverfront and the City's greenway system generate economic, social, and cultural benefits that improve the economy and quality of life for an entire region. The intent of this variance is to recognize that Chattanooga's riverfront is one (1) of the greatest assets within the City. Thoughtful alternate measures will ensure that enhancements to the riverfront will protect its unique ecosystem, enhance urban redevelopment, and expand recreational opportunities. ..... (f) Riverfront buffer variances that accommodate economic development along the areas identified in this Section will be considered. Alternate measures might include urban design principles that are respectful of the river by sustaining public access, maintaining view corridors, regulating height and bulk of structures, and permitting a diversity of uses. ..... (g) Development submittals that propose such improvements to areas identified in this Section and increase their value to Chattanooga's citizens and visitors will be encouraged. Successful riverfront development variances will be complementary to and compatible with other successful development projects in Chattanooga. Variances will ensure that our riverfront continues to be a vital and valued component of downtown Chattanooga's urban landscape. ..... ii. The Site Development Manager may also consider the following: ..... (a) The relationship between the proposed use and the comprehensive Land Use Plan; ..... (b) The safety of access to the property in times of flood for ordinary and emergency vehicles; and ..... (c) The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical, water systems, and streets and bridges. ..... iii. Whether issuance of a variance is the minimum necessary so as not to destroy the character and design of an historic building or feature. ..... iv. The decisions of the Site Development Manager are final and conclusive, but may be reviewed by the City Engineer. ..... 18. Other Requirements: ..... A. For new and redevelopments, the project shall be evaluated for stream and stream bank conditions. The project shall address the following to ensure the preservation and propagation of the buffer area: ..... i. Stream bank stabilization and/or restoration; ..... ii. Additional water quality protection; ..... iii. Channel erosion; ..... iv. Stream pollution; ..... v. Habitat degradation; and ..... vi. The enhancement of the successional process such as active reforestation and removal of invasive exotic plants, trash and debris. ..... 19. Conflict with Other Regulations: ..... Where the standards and management requirements of the Water Quality Buffer are in conflict with other laws, regulations, and policies regarding streams, steep slopes, erodible soils, wetlands, floodplains, timber harvesting, land disturbance activities, or other environmental protective measures, the more restrictive requirements, as determined by the City, shall apply.

(Ord. No. 12900, § 1, 2-3-15; Ord. No. 13251, § 1, 11-28-17)

Ask a question about Chattanooga law

Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.