Sec. 32-278. - Base.
(a) All contractors must contact the Geotechnical Engineer prior to beginning the base operation. This is imperative or the work may not be accepted. ..... (b) Before placing base material, the subgrade shall be proof-rolled in the presence of the Geotechnical Engineer. Proof-rolling shall be performed using a fully-loaded, dual-tandem dump truck. The subgrade shall be trafficked by parallel passes of the truck starting at one (1) side of the roadway. Each pass shall overlap the preceding pass to ensure complete coverage of the roadway cross-section. Two (2) complete proof-rolling coverages are required. Any areas that deflect or yield, in the opinion of the Geotechnical Engineer, shall be corrected before base material is placed. ..... (c) Base material shall be a dense-graded mineral aggregate base meeting the requirements of the Tennessee Department of Transportation "Standard Specifications for Road and Bridge Construction" section 303, Type A Grade D. The contractor shall provide a letter of certification from the base material supplier that the materials meet these requirements. Other types of base material may be used, if included in a design by a professional engineer and approved by the Geotechnical Engineer and the Transportation Department. The base material shall be compacted to at least ninety-five percent (95%) of the standard Proctor maximum dry density. ..... (d) The base will be tested for thickness and compaction by the Geotechnical Engineer. Tests will be conducted at a maximum spacing of two hundred (200) feet, staggered right and left of the centerline. ..... (e) Tolerances for base thickness. The minimum base design thickness shall be in accordance with the City of Chattanooga Standard Drawings. The average of all measurements shall be greater than or equal to the design thickness. Any test that is less than the design thickness, but no more than one-half (0.5) inches less than the design thickness, may be evaluated by the Geotechnical Engineer for acceptance or for corrective actions. Any test that is more than one-half (0.5) inches below the design thickness will require corrective actions. .....
(Ord. No. 11451, § 1, 9-2-03; Ord. No. 11882, § 1, 9-5-06; Ord. No. 12823, § 1, 3-25-14; Ord. No. 14093, § 1, 3-12-24)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.