§ 32-287 — Optional rigid pavements
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 32-287
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/7857239e-cea9-45d1-954a-836b19224048
Sec. 32-287. - Optional rigid pavements.
The developer may choose to construct (concrete) rigid pavements instead of flexible (asphalt) pavements. Rigid pavement shall be designed and constructed to meet the following requirements: (a) Grading: The grading requirements shall be the same as Section 32-274, except the requirements for liquid limit and plastic index are not applicable. The soils shall have a minimum CBR of three (3). ..... (b) Subgrade: The subgrade requirements shall be the same as Section 32-276 ..... (c) Base: The base requirements shall be the same as Section 32-278. The base thickness shall be a minimum of four (4) inches. ..... (d) Concrete Mix: The concrete mix shall be designed to provide a twenty-eight (28) day compressive strength of four thousand (4,000) pounds per square inch with a four (4) inch (± 1) slump and maximum water cement ration of forty-five-hundredths (0.45). An air entraining agent shall be added to achieve a five percent (5%) air content. The concrete mix shall have a nominal maximum aggregate size of one and one-half (1½) inches. ..... (e) Concrete Design: The concrete thickness shall be six (6) inches. Reinforcing is not required. Control joints shall be spaced regularly in a square pattern as per the PCA recommendations. A longitudinal joint shall be constructed along the centerline. Lateral joints shall be spaced the same as the lane width. Joints shall be sealed using an approved joint sealer. The joint sealer shall be submitted to the Geotechnical Engineer for approval before installation. ..... (f) Concrete Placement: Concrete placement shall be according to ACI 304 Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete. Concrete shall be placed directly on the base. The ambient temperature at the time of placement shall be at least forty degrees (40°) F, and the forecast temperature in the first twenty-four (24) hours after placement shall be at least thirty-two degrees (32°). No standing water or frozen base shall be present at the time of placement. The concrete mix is expected to arrive at the site at the correct slump. If trucks arrive with a slump more than one (1) inch below the specified slump, then a maximum of twenty (20) gallons of water may be added, with the approval of the concrete supplier, to adjust the concrete slump. No water may be added after placement begins. If trucks arrive with a slump more than one (1) inch above the specified slump, the truckload shall be rejected. Concrete shall be placed within ninety (90) minutes of the batch time. ..... (g) Concrete Protection and Curing: ..... (1) Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and with ACI 305R for hot-weather protection. ..... (2) Curing shall be accomplished in strict compliance with ACI 308. ..... (h) Finish: The concrete finish shall provide a durable, smooth surface, free of irregularities, but skid-resistant (such as burlap drag or broom finish). ..... (i) Quality Assurance: An ACI certified representative of the geotechnical engineer shall be present to monitor concrete placement and conduct quality assurance testing. The representative shall keep a record of each truck load of concrete delivered to the site, including the information provided on the batch ticket and the amount of water added at the site. The first load of concrete shall be checked for slump, air content, and unit weight to determine acceptance. Compressive strength samples shall be taken randomly from the first thirty (30) cubic yards, and every fifty (50) cubic yards after that. Compressive strength samples shall include a set of six (6) cylinders. Two (2) cylinders shall be tested at seven (7) days and two (2) at twenty-eight (28) days and two (2) for reserve. The remaining cylinder shall be kept in reserve. Slump and air content tests shall be conducted for each set of compressive strength samples taken, or if visual indications of changes in the slump or other concrete properties are observed. .....
(Ord. No. 11451, § 1, 9-2-03; Ord. No. 11882, § 1, 9-5-06; Ord. No. 14093, § 1, 3-12-24)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
