§ 27.5-11 — Post construction requirements

Code of Ordinances, City of Murfreesboro, Tennessee (Supp. No. 18: codified through Ordinance No. 26-O-38, enacted September 17, 2026) · Murfreesboro City Code § 27.5-11

Corpus is an independent public-information project, not the official City of Murfreesboro website. Stable reference: corpuslaw.us/code/699dd614-3a70-428d-90d6-c4e6bccc2bc9

Section 27.5-11 - Post construction requirements.

(A) Certification by engineer. An engineer shall submit a certification that the stormwater system is complete and functional in accordance with the City approved stormwater management plan to the MWRD/Stormwater Coordinator for all developments and redevelopments. The certification is required for stormwater systems which are to be publicly owned or maintained and for stormwater systems which are to be privately owned and maintained. No temporary or permanent certificate of occupancy for any structure in a development or redevelopment shall be issued until such certification is received. (B) As-built plans. The City may request as-built plans as a condition of signing of final plat where stormwater infrastructure will become publicly owned or operated. (C) Final inspections and release of bonds for public stormwater facilities. A final inspection by the City will be required before any performance security will be released on a stormwater facility which is or is to become publicly owned or maintained. The City may, but is not required to, provide for partial, pro-rata releases of the performance security based on completion of various stages of development. (D) Stabilization requirements. (1) Any area of land from which the natural vegetative cover has been either partially or wholly cleared by development activities shall be revegetated according to a schedule approved by the City. The following criteria shall apply to revegetation efforts: (a) Reseeding must be done with an annual or perennial cover crop accompanied by placement of straw mulch or its equivalent of sufficient coverage to control erosion until such time as the cover crop is established over 75% of the seeded area. (b) Replanting with native woody and herbaceous vegetation must be accompanied by placement of mulch or its equivalent of sufficient coverage to control erosion until the plantings are established and are capable of controlling erosion. (c) Any area of revegetation must exhibit survival of a minimum of 75% of the cover crop throughout the year immediately following revegetation. Revegetation must be repeated in successive years until the minimum 75% survival for one year is achieved. (d) Final stabilization shall be accomplished with permanent cover. (2) Developers shall be required to give a warranty for stabilization vegetation as part of their development agreement and to provide a performance security. (E) Inspection of stormwater management facilities. Periodic inspections of facilities shall be performed as required by the City. (F) Failure to meet or maintain maintenance or performance standards. If a responsible party fails or refuses to meet maintenance or performance standards required under this chapter, the City, after reasonable written notice, may correct violations of the standards by performing all necessary work to place the facility in proper working condition. If the stormwater management facility becomes an immediate danger to public safety or public health, the notice may be oral or omitted. The cost of any action by the City under this section shall be charged to the responsible party.

(Ord. No. 24-O-24, § 1, 8-22-24)