Section 27.5-6 - Waivers.
(A) General. Every applicant shall provide for stormwater management as required by this chapter. The City may not grant waivers from standards set forth by State rule or permit, including the NPDES permit for discharge of runoff from the City's separate storm sewer system. The City may on conditions grant waivers of other (non-NPDES) stormwater management standards. (B) Conditions for waiver. Requirements for stormwater management, except those noted in subsection (A), may be waived in whole or in part upon written request of the applicant, provided that at least one of the following conditions applies: (1) It can be demonstrated that the proposed development is not likely to impair attainment of the objectives of this chapter and compliance with the requirements may create a risk to public safety or to private property (e.g. risk of flooding by adding on site detention to redevelopment project). Risk or a significant hardship (other than cost of compliance) is a prerequisite for a waiver. The standards for granting a waiver may be less restrictive, and the extent of the waiver may be greater, for redevelopment than development. (2) Provisions are made to manage stormwater by an off-site facility. The offsite facility must be in place and designed to provide the level of stormwater control that is equal to or greater than that which would be afforded by onsite practices. Further, the facility must be operated and maintained by an entity that is legally obligated to continue the operation and maintenance of the facility. (C) Downstream damage, etc., prohibited. In order to receive a waiver, the applicant must demonstrate to the satisfaction of the City that the waiver will not lead to any of the following conditions downstream: (1) Deterioration of existing culverts, bridges, dams, and other structures; (2) Degradation of biological functions or habitat; (3) Accelerated stream bank or streambed erosion or siltation; or (4) Increased threat of flood damage to public health, life or property. (D) A land disturbance permit not to be issued where waiver requested. No land disturbance permit shall be issued where a waiver has been requested until the waiver is granted. If no waiver is granted, the plans must be resubmitted with the required plans. (E) Grant of waiver. The applicant must submit a written request for waiver, in a form the City specifies, to which City staff shall respond in writing. If the waiver request is recommended by City staff, a simple majority vote of the Board in favor of granting the waiver shall be sufficient. If the waiver request is not recommended in whole or in part by City staff, a two-thirds vote of the Board shall be required to grant the waiver to which staff objection is made.
(Ord. No. 24-O-24, § 1, 8-22-24)
Ask a question about Murfreesboro law
Corpus searches the Murfreesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.