§ 27.5-5 — Land disturbance and Erosion Prevention and Sediment Control (EPSC)
Code of Ordinances, City of Murfreesboro, Tennessee (Supp. No. 18: codified through Ordinance No. 26-O-38, enacted September 17, 2026) · Murfreesboro City Code § 27.5-5
Corpus is an independent public-information project, not the official City of Murfreesboro website. Stable reference: corpuslaw.us/code/b832e6b2-47b7-45f3-b136-f41fcaa33c3e
Section 27.5-5 - Land disturbance and Erosion Prevention and Sediment Control (EPSC).
(A) Land disturbance permit. (1) A land disturbance permit shall be required from the City in the following circumstances: (a) Land disturbing activity disturbs one or more acres of land; (b) Land disturbing activity of less than one acre of land if such activity is part of a larger common plan of development that affects one or more acres of land; see exception in subsection (2) below; or (c) Land disturbing activity of less than one acre of land, if in the opinion of the City, such activity poses a unique threat to water, or to public health or safety. (2) Construction of an individual one- or two-family dwelling, or additions or modifications thereto, shall not require issuance of a separate land disturbance permit; compliance with the terms and conditions of a City building permit shall be sufficient to comply with the permitting requirements of this chapter, provided the activity does not pose a unique threat as specified in subsection (A)(1)(c) above. (Note: The State's requirement for issuance of a State permit for disturbance of one acre or more of land is not waived by this provision, nor does this exception excuse the developer from obtaining the land disturbance permit.) (3) Construction of a structure on less than one acre of land shall not require issuance of a land disturbance permit; compliance with the terms and conditions of a City building permit shall be sufficient to comply with the permitting requirements of this chapter, provided the activity does not pose a unique threat as specified in subsection (A)(1)(c) above. (B) Building permit. If a land disturbance permit is required, no building permit shall be issued until the applicant has obtained a land disturbance permit where required by this chapter. (C) Land disturbance permit not required. The following activities do not require a land disturbance permit: (1) Any emergency activity that is immediately necessary for the protection of life, property, or natural resources is temporarily exempt. A land disturbance permit will be required to be obtained within 30 days of emergency activity. (2) Existing nursery and agricultural operations conducted as a permitted principal or accessory use; not included in this exemption is a land disturbance activity for construction of structures and parking areas. (3) Any logging or agricultural activity that is consistent with an approved farm conservation plan or a timber management plan prepared or approved by the regulating agency. (D) Application for a land disturbance permit. (1) Each application shall include the following: (a) Name of applicant; (b) Business or residence address of applicant; (c) Name, address, telephone number(s) and e-mail address of the owner of the property of record in the office of the Register of Deeds; (d) Address and legal description of subject property including the tax reference number and parcel number of the subject property; (e) Name, address, telephone number and email address of the contractor and any subcontractor(s) who shall perform the land disturbing activity and who shall implement the erosion prevention and sediment control plan; (f) A statement indicating the nature, extent and purpose of the land disturbing activity including the size of the area for which the permit shall be applicable and a schedule for the starting and completion dates of the land disturbing activity; (g) In the event a sinkhole is located on the property, evidence the applicant has obtained appropriate permits from the Tennessee Department of Environment and Conservation; (h) In the event a wetland is located on the property, evidence the applicant has obtained appropriate permits from the Tennessee Department of Environment and Conservation; (i) Evidence of any other state or federal environmental permits that pertain to the property. Those permits in the application shall not foreclose the City from imposing additional requirements and conditions, commensurate with this chapter, on the development of property covered by those permits; and, (j) A copy of notice of intent submitted to the Tennessee Department of Environment and Conservation for coverage under its NPDES construction site runoff general permit. (2) Each land disturbance permit application shall be categorized as one of the four identified activities: (a) Land disturbance activity WITH intent to build and WITH construction of public infrastructure. Prior to submitting an application for a land disturbance permit for this category of land disturbance activity, an applicant shall submit: [1] Stormwater concept plan; [2] Stormwater management plan; and [3] Erosion prevention and sediment control plan. (b) Land disturbance activity WITHOUT intent to build and WITH construction of public infrastructure. Prior to submitting an application for a land disturbance permit for this category of land disturbance activity, an applicant shall submit: [1] Stormwater management plan; and [2] Erosion prevention and sediment control plan. (c) Land disturbance activity WITH intent to build and WITHOUT construction of public infrastructure. Prior to submitting an application for a land disturbance permit for this category of land disturbance activity, an applicant shall submit an erosion prevention and sediment control plan. (d) Land disturbance activity WITHOUT intent to build and WITHOUT construction of public infrastructure. Prior to submitting an application for a land disturbance permit for this category of land disturbance activity, an applicant shall submit an erosion prevention and sediment control plan. (3) Any applicant required under preceding section to submit a stormwater concept plan or a stormwater management plan may request that the plan(s) not be required and the City shall have discretion to grant or deny such requests. At the discretion of the City, any applicant may be required to submit a stormwater concept plan and a stormwater management plan as part of the land disturbance permit application. No land disturbance permit shall be issued until all plans are approved by the City. (4) Each application for a land disturbance permit shall be accompanied by payment of a land disturbance permit fee, and any stormwater management fee, which permit and fee amount shall be set by the City Council. (E) Review and approval of application. (1) After receiving a completed application, the City will review each application for a land disturbance permit to determine its conformance with the provisions of this chapter. Following review and approval by the Stormwater Coordinator and the Engineering Department, the Building and Codes Department shall provide one of the following responses in writing: (a) Approval of the permit application as submitted; (b) Approval of the permit application, subject to such conditions as may be necessary to secure substantially the objectives of this chapter, and issuance of the permit subject to these conditions; (c) Denial of the permit application, indicating the reason(s) for the denial; or (d) A request for additional information. (2) If the City has granted conditional approval of the permit, the applicant shall submit a revised plan that conforms to the conditions established by the City. However, the applicant shall be allowed to proceed with the land disturbing activity so long as it conforms to conditions established by the City. (3) No construction plans for infrastructure will be released by the Planning Director nor will building permits be issued by the Director of Building and Codes until the land disturbance permit has been approved. (4) For any priority construction activity, the City and applicant shall conduct a pre-construction meeting prior to issuance of a land disturbance permit. (F) Permit duration. Every land disturbance permit shall expire and become null and void if substantial work authorized by such permit has not commenced within 180 calendar days of issuance, or is not complete within 18 months from the date of the commencement of construction. Land disturbing activity with no intent to build shall require renewal every six months. (G) Notice of land disturbing activity. The permittee must provide written notification to the Stormwater Coordinator ten working days in advance of the commencement of grading or construction. (H) Inspections of land disturbing activities to be performed by the permittee. (1) The permittee shall conduct and record regular inspections of erosion prevention and sediment control (EP&SC) BMP's, for the purpose of preventing erosion and transport of sediment off the property into the stormwater drainage system and into Waters of the State. (2) Inspections to fulfill the minimum-frequency requirements shall meet the criteria set forth in the Tennessee Department of Environment and Conservation (TDEC) construction activity runoff general permit, and as in the City's erosion and sediment control BMP manual. (3) The inspections and records shall include, but not be limited to, the following: (a) The date and location of the inspection; (b) Any repairs and/or remedies undertaken on EP&SC BMP's; (c) Whether construction is in compliance with the approved plans; (d) Variations from the approved construction plans or specifications; and, (e) Any violations that exist. (4) The permittee shall be responsible for the following: (a) Making records of inspections available to City; (b) Certification of record drawings; and, (c) Investigating any claimed violations identified by the City. (I) Inspections to be performed by the City. (1) The City shall make inspections of land disturbing activity to verify compliance with this chapter at its discretion. (2) The City shall inspect priority construction activities as frequently as required by State and Federal regulations and NPDES permit requirements. (J) Performance bonds. (1) The City may, at its discretion, require the submittal of a performance security or performance bond prior to issuance of a permit to ensure that the stormwater conveyance systems and erosion prevention and sediment controls are installed and maintained by the permit holder as required by the approved plan(s) or by this chapter. The amount of the installation performance security or performance bond shall be the total estimated construction cost of the conveyance systems and the erosion prevention and sediment controls approved under the permit, plus any reasonably foreseeable additional related costs; e.g. additional stabilization costs if the systems or controls are not installed. The performance security shall contain forfeiture provisions for failure to complete work specified in the plan(s). The applicant shall provide an itemized construction cost estimate complete with unit prices which shall be subject to acceptance, amendment or rejection by the City. Alternatively, the City shall have the right to substitute its own calculations for a construction cost estimate. (2) The performance security or performance bond shall be released in full only upon submission of record drawings and written certification by a registered professional engineer licensed to practice in Tennessee that the systems and controls have been installed in accordance with the approved plan and other applicable provisions of the permit and this chapter. The City will make a final inspection of the systems or controls to ensure that they follow the approved plan(s) and the provisions of this chapter. Provisions for a partial pro-rata release of the performance security or performance bond based on the completion of various development stages can be made at the discretion of the City. (K) Erosion prevention and sediment control plan requirements. The erosion prevention and sediment control plan shall accurately describe the potential for soil erosion and sedimentation problems resulting from land disturbing activity and shall explain and illustrate the measures that are to be taken to control these problems. The length and complexity of the plan is to be commensurate with the size of the project, severity of the site condition, and potential for off-site damage. The plan shall be certified by a registered professional engineer licensed in the State of Tennessee, a Certified Professional in Erosion and Sediment Control (CPESC), or person who has satisfactorily completed the TDEC/UT - sponsored Level I (Fundamentals) and Level II (Design) Erosion Prevention and Sediment Control classes. The plan shall also conform to the criteria and standards set forth in the EPSC-BMP manual, and shall include at least the following: (1) A brief description of the intended project and proposed land disturbing activity including number of units and structures to be constructed and infrastructure required. (2) A topographic map with contour intervals of two feet or less showing present conditions and proposed contours resulting from land disturbing activity. (3) All existing drainage ways, including intermittent and wet-weather, including any designated floodways or floodplains. (4) A general description of existing land cover. Individual trees and shrubs do not need to be identified. (5) Stands of existing trees as they are to be preserved upon project completion, specifying their general location on the property. Differentiation shall be made between existing trees to be preserved, trees to be removed and proposed planted trees. Tree protection measures must be identified, and the diameter of the area involved must also be identified on the plan and shown to scale. Information shall be supplied concerning the proposed destruction of exceptional and historic trees in setbacks and buffer strips, where they exist. (6) Approximate limits of proposed clearing, land disturbance and filling. (7) Approximate flows of existing stormwater leaving any portion of the site. (8) A general description of existing soil types and characteristics and any anticipated soil erosion and sedimentation problems resulting from existing characteristics. (9) Location, size and layout of proposed stormwater and sedimentation control improvements. (10) Proposed drainage network. (11) Proposed drain tile or waterway sizes. (12) Approximate flows leaving site after construction and incorporating water run-off mitigation measures. The evaluation must include projected effects on property adjoining the site and on existing drainage facilities and systems. The plan must address the adequacy of outfalls from the development: when water is concentrated, what measures, including infiltration, sheeting into buffers, etc., are going to be used to prevent the scouring of waterways and drainage areas off-site, etc. (13) The projected sequence of work represented by the grading, drainage and erosion prevention and sediment control plans as related to other major items of construction, beginning with the initiation of excavation and including the construction of any sediment basins or retention facilities or any other structural BMP's. (14) Specific remediation measures to prevent erosion and sedimentation run-off. Plans shall include detailed drawings of all control measures used; stabilization measures including vegetation and non-vegetation measures, both temporary and permanent, will be detailed. Detailed construction notes and a maintenance schedule shall be included for all control measures in the plan. (15) Specific details for the construction of rock pads, wash down pads, and settling basins for controlling erosion and sediment loss; road access points; eliminating or keeping soil, sediment, and debris on streets and public ways at a level acceptable to the City. (16) Soil, sediment, and debris brought onto streets and public ways must be removed by the end of the work day by machine, broom or shovel to the satisfaction of the City. Failure to remove the soil, sediment, or debris shall be deemed a violation of this chapter. Any material creating hazardous roadway conditions shall require immediate clean-up. (17) Proposed structures; location (to the extent possible) and identification of any proposed additional buildings, structures or development on the site. (18) A description of any on-site measures to be taken to recharge surface water into the ground water system through infiltration. (19) Erosion prevention and sediment control measures shall achieve minimum standards of design set forth in the Tennessee Construction General Permit (CGP), in particular the standards of 5.5.3.5 and 6.4.1 regarding design storms, drainage areas, and the different standards for discharges into waters with unavailable parameters and exceptional Tennessee waters. (20) Management practices and controls to prevent waste, including discarded building materials, concrete truck washout, asphaltic concrete mix, chemicals, litter, and sanitary waste, from entering the stormwater drainage system and Waters of the State.
(Ord. No. 24-O-24, § 1, 8-22-24)