§ 3.2.11.10 — Appeals Process
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 3.2.11.10
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/4fa2ddfc-da06-49f8-bc60-f5b0625e583f
Section 3.2.11.10 - Appeals Process
(a) Waiver or Deviation Requests to the Board of Adjustment. (1) In the same manner and under the same circumstances as generally provided by Chapter 1, Article 1, Division 5 and Chapter 2, Article 2, Division 5 [sic], and except as otherwise specified in this Division, the BOA shall: a. Hear and decide requests for variances from the requirements of this Division concerning special flood hazard area regulations; b. Hear and determine an appeal when it is alleged there is an error in any requirement, decision, or determination made by any City of Abilene administrative official in the enforcement of Section 3.2.11.6 relating to the flood hazard area regulations. (2) Waivers or deviations shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (3) Waivers or deviations may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. (4) Generally, waivers or deviations may be issued for new construction and substantial improvements to be erected on a lot of one-half (½) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, providing the relevant factors in Section 3.2.11.6 have been fully considered. As the lot size increases beyond the one-half (½) acre, the technical justification required for issuing the variance increases. (5) Upon consideration of the factors noted above and the intent of this Division 11, the Board of Adjustment may attach such conditions as it deems necessary to further the purpose and objectives of this Division. (6) Prerequisites for granting a waiver or deviation: (a) A waiver or deviation shall only be issued upon a determination that it is the minimum necessary, considering the flood hazard, to afford relief. (b) A waiver or deviation shall only be issued upon: 1. A showing of good and sufficient cause, 2. A determination that failure to grant the waiver or deviation would result in exceptional hardship to the applicant, and 3. A determination that the granting of a waiver or deviation will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud or victimization of the public, or conflict with existing local laws or ordinances. (c) Any applicant to whom a waiver or deviation is granted shall be given written notice that the structure will be permitted to be built with the lowest floor elevation no more than two feet (2') below the base flood elevation, and that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 12-2010, pt. A (Exh. A), 6-10-10)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
