§ 3.2.11.4 — Drainage Plans
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 3.2.11.4
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/32b8ae99-2000-4957-b945-b7cb3851b45c
Section 3.2.11.4 - Drainage Plans
(a) Drainage Plans. A Drainage Plan, as defined and regulated by the provisions of this Section, shall be submitted to and approved by the Floodplain Administrator as part of the requirements for Construction Plans for any subdivision of land or site plan. Property not located in areas of special flood hazard as defined herein, and where no improvements are required, shall not be required to submit a Drainage Plan. (b) Responsible Official. The Floodplain Administrator shall be the responsible official for a Drainage Plan. (c) Determination of Requirement in Relation to a Floodway Development Permit. Prior to the Floodplain Administrator's approval of any Floodway Development Permit, and prior to the issuance of a building permit or a Site Development Permit for the construction of a parking lot, when a Drainage Plan has not been previously required under the terms of this Section, the Floodplain Administrator shall determine whether a Drainage Plan should be required and may require such plan in such instances where the same is necessary to meet the purposes of this Section. (1) In general, development on a tract of less than one-half (½) acre that has less than forty-five percent (45%) impervious surface will not be required to submit a formal Drainage Plan. (2) Development which creates less than twenty thousand (20,000) total square feet of impervious surface on the site will not be required to submit a formal Drainage Plan. This calculation is determined as new impervious surface from its natural state as defined in Section 3.2.11.1(b) Definitions for "Natural". (3) Development located within the following designated infill areas will not be required to submit a formal Drainage Plan: a. The Central Business District, as defined in the City's adopted Comprehensive Plan. b. Infill development corridors, as defined in the City's Infill Development Strategy, excluding East Highway 80. (4) When a Drainage Plan is required prior to issuance of a Building Permit, the structure for which the Building Permit has been obtained shall not be used or occupied until the facilities as shown on the approved Drainage Plan have been completed by the permit applicant and accepted by the Floodplain Administrator. (5) An updated Drainage Plan is required when associated with a revised site plan where drainage plans have been previously approved. (d) Required Submissions and Technical Data. All Drainage Plans shall be prepared by a registered professional engineer licensed by the State of Texas. (1) Drainage Plans submitted for final approval shall bear the signature of the submitting engineer and the following certification: "I hereby certify that I am familiar with the adopted ordinances and regulations of the City of Abilene governing detention and drainage facilities; that these plans have been prepared under my direct engineering supervision; and that the above and foregoing Drainage Plan complies with all governing ordinances and the adopted drainage standards of the City of Abilene pertaining to detention and drainage facilities to the best of my knowledge, information and belief." (2) Upon completion of the proposed improvements, a certification from a contractor or registered professional engineer shall be provided similar to the following certification: "I hereby certify that the detention improvements were constructed and completed in accordance with the approved Drainage Plans." (e) Plan Elements. A Drainage Plan shall consist of engineering drawings, contour maps, and all supporting engineering calculations, as applicable to the land area covered by the Plan which are required to demonstrate full compliance with the requirements of this Division and Abilene's adopted Drainage Standards. (f) Requirements in Areas of Special Flood Hazards. Drainage Plans for developments in areas of special flood hazard shall also contain the following: (1) Elevation in relation to mean sea level of the lowest habitable floor (including basement) of all proposed structures; (2) Elevation in relation to mean sea level to which any residential and nonresidential structure shall be floodproofed; (3) A certificate from a registered professional engineer or architect that to the best of their knowledge the nonresidential floodproofed structure shall meet the floodproofing criteria of Section 3.2.11.6 and applicable building codes; and (4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development. (g) Administration of Drainage Plans. (1) Processing of Drainage Plans. All Drainage Plans as required by this Section shall be submitted to and received by the Floodplain Administrator. A conference to discuss the Drainage Plan may be held with the Floodplain Administrator, but only after Construction Plans have been officially submitted. a. Within ten (10) working days after receipt of a properly completed Drainage Plan (also refer to Chapter 1, Section 1.2.1.2), the Floodplain Administrator shall either approve or deny the submitted plan. b. Approval of a submitted Drainage Plan shall only constitute acceptance by the Floodplain Administrator of the certification of the submitting engineer and such acceptance shall not operate to remove any requirement of Abilene's adopted Drainage Standards which are not specifically considered in the approved plan. c. Drainage Plans which meet the requirements of this ordinance and which conform to all requirements of the adopted Abilene Drainage Standards shall be approved. d. If the required findings cannot be made based upon the information contained in the submitted plan, such additional information as is required by the Floodplain Administrator to make such determination will be identified; in the event that the information deficiency is of a technical nature, the Floodplain Administrator may request an engineering conference with the submitting engineer. e. If a submitted Drainage Plan is denied, the certifying engineer or applicant, as applicable, shall be advised in writing of the disapproval.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 12-2010, pt. A (Exh. A), 6-10-10; Ord. No. 27-2015, pt. 1(Exh. A), 5-14-15; Ord. No. 39-2015, pt. 1(Exh. A), 8-13-15)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
