For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.2.11.5 — Floodway Development Permits

Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 3.2.11.5

Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/732eeadf-c8f4-4fc4-9072-c1b968e072ec

Section 3.2.11.5 - Floodway Development Permits

(a) Floodway Development Permit Requirements. A Floodway Development Permit, as defined and regulated by this Division, shall be required prior to the commencement of any building construction, or earth change, of any property within a designated floodway. Floodway Development Permits shall not be required for activities listed in 3.2.11.2(b) [3.2.11.5(b)]. A separate permit shall be required for each separate, noncontiguous site or lot, and no permit shall be transferable without the prior written consent of the Floodplain Administrator. (b) Floodway Development Permit Exemptions. A Floodway Development Permit shall not be required for the following activities: (1) Bona fide agricultural and farming operations which constitute the principal use of any lot or tract of ground in the City of Abilene and which meets the requirements of the zoning regulations within Chapter 2 of this LDC. (2) Customary and incidental routine grounds maintenance, landscaping, and home gardening which does not require a permit, a zoning variance, or a building permit, and which does not affect stormwater drainage through the site. (3) Emergency repairs of a temporary nature made on public or private property which are necessary for the preservation of life, health, or property, and which are made under such circumstances where it would be impossible or impracticable to obtain a Floodway Development Permit. (4) Excavation for the purpose of constructing, installing, maintaining, or repairing any public street, public utility facility, or any service lines related thereto. (c) Floodway Development Permit Application. A written application for a Floodway Development Permit shall be filed with the Floodplain Administrator. Applications shall be in such form and content as the Floodplain Administrator shall establish, and shall be accompanied by the payment of a permit fee, the amount of which shall be determined by fee resolution by the City Council and placed on file in the office of the City Secretary. (d) Contents of Permit Application. Each Floodway Development Permit application shall include all the information specified within paragraphs (1) through (6) below. Provided, however, that if the Floodplain Administrator is unable to determine from the application submitted that it meets the policies and standards governing the issuance of the requested permit, the Floodplain Administrator shall request the applicant in writing to furnish such additional information as may be essential to such determination. This Section governing the contents of Floodway Development Permit applications shall not require the resubmission of any documents, drawings, or other information which was previously submitted by the applicant in conjunction with the processing of a Drainage Plan approved since April 30, 1983, by the Floodplain Administrator for the same site and type of development. (1) The name and address of the legal owner of the property for which the permit is requested. (2) A vicinity sketch and boundary line survey of the site for which a permit is requested, including a legal description of such property. (3) Site drawings indicating each separate land area to be excavated, filled, graded, or leveled, the finished depth of each separate land cut or fill, the present and future (as completed) points of entry and discharge for surface water on the subject property and identification of all temporary or permanent structures or other devices to be erected or established for the purpose of controlling or regulating surface water and erosion on such property. (4) The applicant's plans for controlling erosion and sedimentation for the purpose of preventing the deposit of sediment from the lot or tract under application upon any other public or private property or watercourse during all phases of project construction. (5) The applicant's plans for receipt of surface water on his property and discharge of surface water from his property during periods of construction, and a statement specifying the anticipated time period for the completion of all drainage and related improvements. (6) For developments in areas of special flood hazard, the requirements of Section 3.2.11.6 must be addressed within the Floodway Development Permit application. (e) Processing Permits. Within twenty (20) working days after receipt of a complete application for a Floodway Development Permit application (also refer to Chapter 1, Section 1.2.1.2), the Floodplain Administrator shall either approve or deny the permit application. (1) If the required findings cannot be made based upon the information contained in the submitted permit application, the general nature of such additional information as is required by the Floodplain Administrator to make such determination will be identified. In the event that the information deficiency is of a technical nature, the Floodplain Administrator may additionally request an engineering conference with the submitting engineer. (2) If a Floodway Development Permit is denied, the certifying engineer or applicant shall be advised in writing of the denial with an explanation for such. (f) Conditions for Approval. Floodway Development Permits shall meet the following conditions: (1) No earth change shall be permitted which creates a public hazard upon any property within the City of Abilene through the obstruction, impairment, sedimentation, blockage or alteration of any storm sewer drain or any existing surface watercourse. (2) No earth change shall be permitted which will channelize, obstruct, or impede any watercourse in a manner which is inconsistent with accepted engineering practices and/or the adopted Drainage Standards of the City of Abilene. (Also see Site Preparation, Chapter 4, Article 1, Division 2 [Division 3].) (3) All earth changes shall be designed, constructed, and completed in a manner which minimizes the exposure of bare earth to precipitation. (4) No earth change shall be permitted which will increase surface runoff to a level, amount or a rate greater than that existing under natural conditions, except runoff which has been provided for through use of an approved regional detention facility. (5) Construction activity on residential tracts or commercial and industrial tracts shall be conducted only if appropriate sedimentation facilities are installed and maintained throughout the construction period in accordance with the adopted Abilene Drainage Standards. (6) As may be applicable to any lot, parcel, or tract of land for which an approved Drainage Plan exists, the requirements and conditions of the Drainage Plan shall be incorporated as a condition upon the issuance of any Floodway Development Permit. (7) In the regulatory floodway, Floodway Development Permits may not be issued until the standards of this Division have been satisfied and until evidence has been presented demonstrating that the proposed encroachment: a. Will not result in any increase in floodway levels within the community during the occurrence of the base flood discharge; and b. Is consistent with the Abilene Stream Management Plan and Abilene Drainage Standards; and c. Meets the standards of this Division including, specifically, Section 3.2.11.6 concerning special provisions for flood hazard reduction in areas of special flood hazard. (8) Prior to granting any Floodway Development Permit, the Floodplain Administrator shall attach such additional conditions thereto as he may deem reasonable and necessary to prevent hazard to public or private property resulting from the blockage, obstruction, alteration, or impairment of any storm sewer drain or surface watercourse and to prevent the work thereby authorized from being conducted in a manner hazardous to lives or property, or otherwise likely to create a public nuisance. (9) Requirements established and approved by the Floodplain Administrator shall become conditions upon the issuance of the Floodway Development Permit; no changes in approved plans, design standards, or conditions shall be made without prior written approval of the Floodplain Administrator. (g) Map Amendment. Where an approved Floodway Development Permit has been issued and the proposed improvements will result in changes in the floodway boundary, the Floodplain Administrator may immediately take the appropriate steps necessary to secure a map amendment.

(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 12-2010, pt. A (Exh. A), 6-10-10)

Ask a question about Abilene law

Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.