§ 2.14 — Installation Standards and Specifications

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Backflow Prevention Chapter, § 2.14

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/39111ea9-f743-4ab1-b8eb-0a49a1acbe5f

Section 2.14 Installation Standards and Specifications

A. Reduced pressure principle backflow prevention assemblies (RPZs). RPZs may be utilized at premises where a substance is handled that would be hazardous to health if introduced into the potable water system. The RPZ is normally used in locations where an air gap is impractical. The RPZ is effective against both backsiphonage and backpressure. 1. RPZs shall be sized to provide an adequate supply of water and pressure for the premises being served. Flow characteristics are not standard. Consult manufacturer's specifications for specific performance data. 2. The assembly shall be readily accessible for testing and maintenance and shall be located in an area where water damage to building or furnishing would not occur from relief valve discharge. The property owner assumes all responsibility for any damage caused by water discharge from an RPZ assembly. An approved air gap shall be located at the relief valve orifice of RPZ assemblies. This air gap shall be at least twice the inside diameter of the incoming supply line as measured vertically above the top rim of the drain, and in no case less than one (1) inch. An approved air-gap funnel assembly may be used to direct minor discharges away from the assembly; this assembly will not control flow in a continuous relief situation. Drain lines to accommodate full relief valve discharge flow should be considered. 3. No part of a reduced pressure principle backflow prevention assembly shall be submerged in water or installed in a location subject to flooding. RPZs are typically installed above grade in well-drained areas. The drain shall be of adequate capacity to carry the full rated flow of the assembly and shall be screened on both ends. 4. Enclosures shall be designed for ready access and sized to allow for the minimum clearances established below. Removable protective enclosures are typically installed on the smaller assemblies. Daylight drain ports shall be provided to accommodate full pressure discharge from the assembly. 5. Assemblies two (2) inches and smaller shall have at least six (6) inches clearance on both sides and on top of the assembly, and twelve (12) inches below and behind the assembly. All assemblies larger than two (2) inches shall have a minimum of twelve (12) inches on the back side, twenty-four (24) inches on the test cock side, and the relief valve opening shall be at least twelve (12) inches plus nominal size of assembly above the floor or highest possible water level. Headroom of six (6) feet zero (0) inches is required in vaults without a fully removable top. A minimum access opening of thirty-six (36) inches is required on all vault lids. 6. Vertical installation is prohibited. 7. All RPZ assemblies shall be tested in accordance with this Chapter. Tests are the responsibility of the assembly owner. The owner shall notify the Regulatory Authority upon installation of any backflow prevention assembly. 8. Variances from these specifications will be evaluated on a case-by-case basis. Any deviation shall be prohibited without prior written approval of the Regulatory Authority. B. Double check valve backflow prevention assemblies (DCs). DCs may be utilized at premises where a substance is handled that would be objectionable but not hazardous to health if introduced into the potable water system. 1. DCs shall be sized to provide an adequate supply of water and pressure for the premises being served. Consult manufacturer's specifications for specific performance data. 2. Premises where an uninterrupted water supply is critical should be provided with two (2) assemblies installed in parallel. Assemblies shall be sized in such a manner that either assembly will provide the minimum water requirements while the two (2) together will provide the maximum flow required. 3. The assembly shall be readily accessible with adequate room for testing and maintenance. DCVAs may be installed below grade, providing all test cocks are fitted with brass pipe plugs. All vaults shall be well-drained, constructed of suitable materials, and sized to allow for the minimum clearances established below. 4. Assemblies two (2) inches and smaller shall have at least six (6) inches of clearance below and on both sides of the assembly and, if located in a vault, the bottom of the assembly shall be not more than twenty-four (24) inches below grade. All assemblies larger than two (2) inches shall have a minimum clearance of twelve (12) inches on the back side, twenty-four (24) inches on the test cock side, and twelve (12) inches below the assembly. Headroom of six (6) feet zero (0) inches is required in vaults without a fully removable top. A minimum access opening of thirty-six (36) inches is required on all vault lids. "Y" pattern double check valve assemblies shall be installed so that the checks are horizontal and the test cocks face upward. These clearance standards apply to all assemblies installed in vaults, enclosures, and meter boxes. 5. Vertical installations of DCVAs are only allowed on sizes up to and including four (4) inches that meet the following requirements: a. Internally spring-loaded check valves; b. Flow is upward through assembly; c. Manufacturer and University of Southern California’s Foundation for Cross-Connection Control and Hydraulic Research states the assembly can be used in a vertical position; d. Approved by the Regulatory Authority. 6. All DCVAs shall be tested in accordance with this Chapter. Tests are the responsibility of the assembly owner. The owner shall notify the Regulatory Authority upon installation of any backflow prevention assembly. 7. Variances from these specifications will be evaluated on a case-by-case basis. Any deviation shall be prohibited without prior written approval of the Regulatory Authority. C. Pressure vacuum breaker backflow prevention assemblies (PVBs). PVBs may be utilized at point-of-use protection only and where a substance is handled that would be objectionable but not hazardous to health if introduced into the potable water system. PVBs protect against backsiphonage only and shall not be installed where there is potential for backpressure. 1. The assembly shall be installed a minimum of twelve (12) inches above the highest downstream piping. 2. PVBs shall not be installed in an area subject to flooding or where damage would occur from water discharge. 3. The assembly shall be readily accessible for testing and maintenance, with a minimum clearance of twelve (12) inches all around the assembly. 4. All PVBs shall be tested in compliance with this Chapter. Tests are the responsibility of the assembly owner. The owner shall notify the Regulatory Authority of installation of any backflow prevention assembly. 5. Variances from these specifications will be evaluated on a case-by-case basis. Any deviation shall be prohibited without prior written approval of the Regulatory Authority. D. Spill-resistant pressure vacuum breaker backflow prevention assemblies (SVBs). SVBs may be utilized in all installations requiring a pressure vacuum breaker. SVBs shall comply with the installation requirements applicable for pressure vacuum breaker backflow prevention assemblies. E. Air Gap Separation. Air-gap separations provide maximum protection from backflow hazards and may be utilized at premises where a substance is handled that would be hazardous to health if introduced into the potable water system. 1. An air-gap separation shall be at least twice the diameter of the supply pipeline measured vertically above the top rim of the receiving vessel, and in no case less than one (1) inch. If splashing is a problem, tubular screens may be attached or the supply line may be cut at a forty-five-degree angle. The air gap distance is measured from the bottom of the angle. Hoses are not allowed. 2. Air-gap separations shall not be altered in any way without prior approval from the Regulatory Authority and shall be available for inspection at all reasonable times.

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.