§ 40-255 — Water distribution infrastructure
Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Code of Ordinances § 40-255
Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/318e09dc-fd7d-4247-9430-01c519682d69
Sec. 40-255. - Water distribution infrastructure.
(a) All water distribution infrastructure must be constructed, installed and tested in accordance with TCEQ Rules and Regulations for Public Water Systems, as amended. (b) Permanent water service shall not be supplied to any newly constructed infrastructure until after the City has received the results of the bacteriological test and the results show that no bacteria is present. (c) Permanent water service shall not be supplied to any newly constructed infrastructure until an inspection is completed by the City to ensure that all State regulations and local codes have been met. (d) Temporary water services which pose a potential cross-connection threat to the potable water supply shall be protected by an approved backflow prevention assembly.
(Code 2011 (Repub.), § 11-10(K))
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.
