§ 7.13 — Traffic Impact Analyses
Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, App. A, § 7.13
Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/f7d41528-9ef2-4e84-9590-c943d1389aaf
Sec. 7.13. - Traffic Impact Analyses.
This Section establishes requirements and procedures pertaining to traffic impact analyses. This Section is intended to inform the applicant of the City's expectations to ensure safe and adequate access to development properties, adequate traffic flow on existing and proposed/planned roadways, and sufficient connectivity of the existing and proposed/planned roadway system attributable to their proposal. In addition, this Section is intended to expedite the City's review of traffic impact analysis reports, provide standard criteria for evaluating proposals, and identify some potential mitigation measures. The traffic impact analysis is intended to form the basis for the design of any proposed access/roadway system to ensure coordination of the proposed land use with the transportation needs resulting therefrom. The City and the developer share the responsibility to identify and solve transportation issues arising from land development. The City requires that traffic impact analyses accompany certain zoning applications, certain preliminary plan applications, and certain site plan applications. It is intended that any traffic impact analysis required for any type of land development proposal will complement the overall goal of ensuring that adequate transportation facilities are in place to serve land uses by the time those uses are occupied and generating traffic. These purposes are further amplified below. A. Purpose. 1. Zoning Traffic Impact Analysis. The goal of a traffic impact analysis submitted in conjunction with a zoning request is to determine the effect that uses allowed within various proposed zones will have on existing and/or any proposed/planned roadway systems, and to ensure there is a balance between future land uses and future transportation systems. Zoning applications that are required to have a traffic impact analysis are evaluated using both current and long-term traffic and roadway scenarios. The traffic impact analysis will determine whether acceptable levels of service will be maintained for traffic flow within the proposed project and in its study area. Where service levels fall below acceptable standards, mitigation solutions will be analyzed for their effectiveness. A traffic impact analysis for a zoning request should not recommend mitigation measures that are inconsistent with any traffic or roadway provisions of the UDO or the Comprehensive Plan, including the Thoroughfare Plan. The Planning and Zoning Commission and the City Council shall consider the findings of the traffic impact analysis in approving or disapproving zoning changes to the extent allowed by law. 2. Preliminary Plan Traffic Impact Analysis. The goal of a traffic impact analysis submitted in conjunction with a preliminary plan is twofold: to assess the adequacy and safety of proposed access to adjacent existing or planned roadways (or designs proposed for such access or roadways) and to determine the effects the proposed project may have on current and future land development and roadway systems in its study area. Generally, the traffic impact analysis uses current and anticipated near-term traffic volumes and roadway configurations for the analysis. The process should ensure that the roadway system is, or will be, adequate to accommodate the proposed use and that safe and adequate access will be provided for travel between the site and the public roadway system. Where the traffic impact analysis shows levels of service falling below acceptable minimums on roadway systems in its study area the traffic impact analysis will recommend appropriate mitigation measures and demonstrate their effectiveness. Example mitigation techniques may include adding/lengthening deceleration/turn lanes, improving driveway access, providing connectivity, and modifying traffic control devices. Combinations of these techniques and other techniques can be considered. A traffic impact analysis for a preliminary plan should not recommend mitigation measures that are inconsistent with any traffic or roadway provisions of the UDO or the Comprehensive Plan, including the Thoroughfare Plan. The Planning and Zoning Commission shall consider the findings of the traffic impact analysis in approving or disapproving preliminary plans to the extent allowed by law. 3. Site Plan Traffic Impact Analysis. The goal of a traffic impact analysis submitted in conjunction with a site plan is twofold: to assess the adequacy and safety of proposed access to adjacent existing or planned roadways (or designs proposed for such access or roadways) and to determine the effects the site project may have on current and future land development and roadway systems in its study area. Generally, the traffic impact analysis uses current and anticipated near-term traffic volumes and roadway configurations for the analysis. The process should ensure that the roadway system is, or will be, adequate to accommodate the proposed use and that safe and adequate access will be provided for travel between the site and the public roadway system. Where the traffic impact analysis shows levels of service falling below acceptable minimums on roadway systems in its study area the traffic impact analysis will recommend appropriate mitigation measures and demonstrate their effectiveness. Example mitigation techniques may include adding/lengthening deceleration/turn lanes, improving driveway access, providing connectivity, and modifying traffic control devices. Combinations of these techniques and other techniques can be considered. A traffic impact analysis for a site plan should not recommend mitigation measures that are inconsistent with any traffic or roadway provisions of the UDO or the Comprehensive Plan, including the Thoroughfare Plan. The Planning and Zoning Commission shall consider the findings of the traffic impact analysis in approving or disapproving site plans to the extent allowed by law. B. Definitions. 1. Trip Generation Rates. Trip generation rates are used to estimate the amount of vehicular traffic generated by proposed rezoning or a proposed site plan. For zoning and preliminary plan traffic impact analyses, these rates are shown by zoning district in the table below. Preliminary plan trip generation rates should be based on the underlying zoning district. Site plan traffic impact analyses shall use rates set forth in the latest edition of the Trip Generation Report published by the Institute of Transportation Engineers (ITE) unless said report does not adequately address the type or intensity of the proposed land use. In this event, the applicant or their agent shall submit projected vehicle trips to the Administrator. For land uses adequately represented in said report, alternate trip generation rates shall not be accepted. Trip Generation Rates for Residential Zoning Districts Zoning Classification | Maximum Units/Acre | ITE Land Use Code | Trip Rate/Unit | Trip Rate/Acre R | 0.33 | 210 | 1 | 0.33 WE | 0.5 | 210 | 1 | 0.5 E | 1 | 210 | 1 | 1 WRS | 2 | 210 | 1 | 2 RS | 4 | 210 | 1 | 4 GS | 8 | 210 | 1 | 8 D | 12 | 230 | 0.52 | 6.24 T | 14 | 230 | 0.52 | 7.28 MH | 24 | 230 | 0.52 | 12.48 MF | 30 | 220 | 0.62 | 18.6 MU | Determined by Administrator MHP | Determined by Administrator P-MUD | Determined by Administrator Trip Generation Rates for Non-Residential Zoning Districts Zoning Classification | Maximum Building Area/Acre* | ITE Land Use Code | Trip Rate/1,000 SF | Trip Rate/Acre O | 16,000 SF | 710 | 1.55 | 25 SC | 11,000 SF | 820 | 3.75 | 40 WC | 11,000 SF | 820 | 3.75 | 40 GC | 13,500 SF | 820 | 3.75 | 50 CI | 16,000 SF | 710 | 1.55 | 25 BP | N/A | 130 | 0.85 | 8.85 BPI | N/A | 770 | 1.43 | 19 CU | Determined by Administrator PDD | Determined by Administrator * Density maximum calculated based on existing (2007) developments in the City of College Station. Trip Generation Rates for Retired Zoning Districts Zoning Classification | Maximum Units or Building Area/Acre* | ITE Land Use Code | Trip Rate/1,000 SF | Trip Rate/Acre R-4 | 20 | 220 | 0.62 | 12.4 R-6 | 30 | 220 | 0.62 | 18.6 C-3 | 11,000 SF | 820 | 3.75 | 40 R&D | N/A | 760 | N/A | 16.8 M-1 | N/A | 110 | N/A | 7.5 M-2 | N/A | 120 | N/A | 2.2 * Density maximum calculated based on existing (2007) developments in the City of College Station. 2. Design Year. The design year is the point in time upon which assumptions pertaining to land use, population, employment, and transportation facilities are based. All traffic impact analyses shall use a design year based on the expected date of project occupancy and shall include consideration of nearby development that has been approved and will contribute traffic volume to the proposed project's study area. 3. Peak Periods. Peak periods relate to times of day experiencing the greatest hourly traffic flow rates. Two (2) "peaks" are to be addressed by a traffic impact analysis: The morning and afternoon peak hours (or projected peak hours) of existing (or planned) roadways serving the proposed land development. Typically, roadway peak periods are between 7:00 and 9:00 a.m. and between 4:00 and 6:00 p.m. 4. Base Volumes. Base volumes shall be based on current traffic counts adjusted to the expected date of project occupancy plus volumes generated by nearby future development (all phases) that has been approved by the City. When available, base data will be supplied by the City Traffic Engineer. In all cases where traffic counts are needed and are not available, the developer or their agent shall be required to collect such data according to guidelines approved by the Administrator. 5. Level of Service. Level of service is a measure of the extent of congestion experienced on roadways. It is measured through analysis of traffic operating conditions on roadway links and at intersections, using techniques presented in the latest edition of the Transportation Research Board's Highway Capacity Manual. C. Applicability. 1. Zoning Traffic Impact Analysis. Any zoning request, except for certain redevelopment areas as designated on the Comprehensive Plan Future Land Use & Character Map, which is expected to generate at least one hundred fifty (150) vehicle trips during any peak hour period requires a traffic impact analysis. Where the Comprehensive Plan designates a property as a redevelopment area, a traffic impact analysis is required if the zoning request is expected to generate at least one hundred fifty (150) vehicle trips during any peak hour period more than those generated by the currently approved use(s) on the property. A zoning request involving multiple zoning districts is required to have a traffic impact analysis based on the total traffic generated for all the proposed districts. A traffic impact analysis may be required for a zoning request that generates less than one hundred fifty (150) trips in the peak hour, where the peaking characteristics could have a detrimental impact on the transportation system as determined by the Administrator. A traffic impact analysis shall be required unless the applicant demonstrates to the satisfaction of the Administrator that a traffic impact analysis is not necessary for the proposed rezoning request. In cases where a traffic impact analysis is required, the rezoning application will be considered incomplete until the traffic impact analysis is submitted. 2. Preliminary Plan Traffic Impact Analysis. Any proposed development requiring preliminary plan approval, which is expected to generate at least one hundred fifty (150) trips in any peak hour period requires a traffic impact analysis. A traffic impact analysis may be required for preliminary plans that generate less than one hundred fifty (150) trips in any peak hour period where the peaking characteristics could have a detrimental impact on the area's vehicular transportation system as determined by the Administrator. A traffic impact analysis shall be required unless the applicant demonstrates to the satisfaction of the Administrator that a traffic impact analysis is not necessary for the proposed project. In cases where a traffic impact analysis is required, the preliminary plan application must be accompanied by the traffic impact analysis. 3. Site Plan Traffic Impact Analysis. Any proposed development requiring site plan approval, excluding developments located in the zoning classifications of NG-1 Core Northgate, NG-2 Transitional Northgate, or NG-3 Residential Northgate, which is expected to generate at least one hundred fifty (150) trips in any peak hour period requires a traffic impact analysis. A traffic impact analysis may be required for site plans that generate less than one hundred fifty (150) trips in any peak hour period where the peaking characteristics could have a detrimental impact on the area's vehicular transportation system as determined by the Administrator. A traffic impact analysis shall be required unless the applicant demonstrates to the satisfaction of the Administrator that a traffic impact analysis is not necessary for the proposed site project. In cases where a traffic impact analysis is required, the site plan application must be accompanied by the traffic impact analysis. D. Methodology. 1. Professional Engineer to Perform Traffic Impact Analysis. All required traffic impact analyses shall be performed by a professional engineer licensed in the State of Texas and qualified to perform such analysis. Qualifications may include but are not limited to certification as a Professional Traffic Operations Engineer or Professional Transportation Planner by the Institute of Transportation Engineers or certification by the Texas Department of Transportation (TxDOT) to conduct traffic engineering studies. 2. Pre-Submittal Meeting. A pre-submission consultation with the Administrator is required at the time of the pre-application conference to discuss whether a traffic impact analysis is required and, if so, the relevant aspects thereof. The study area will be defined to include nearby land developments (existing or approved), the street network to be examined (the study network), and the minimum extent of analysis. In addition, details of the procedures, assumptions, data collection, and analysis methodologies will be determined at this meeting. Traffic from other nearby developments that have been approved but not yet constructed will be accounted for in the traffic impact analysis as determined by the Administrator. The Administrator may require other specific assumptions such as the percentage of trucks to match local conditions. The City may require analysis of peak fifteen (15) minute intervals for certain types of land uses that generate major traffic surges including but not limited to stadiums, movie theaters, arenas, and schools. 3. Zoning Traffic Impact Analysis Content. a. Study Area. A map(s) will delineate the traffic impact analysis study area, including land areas to be considered and all existing/planned streets therein, and the study network (those streets and intersections requiring specific analysis). The study area shall be determined based on the geographical area most affected by the proposed zoning request as determined by the Administrator after conferring with the applicant's traffic engineer. b. Existing Zoning. A description by zoning classification of the existing zoning in the area proposed for rezoning. c. Proposed Zoning. A description of the proposed zoning including the land area by zoning classification. d. Roadway Network. A description of the existing and proposed/planned roadways of all classifications and traffic volumes on the study network within the study area. e. Impact Determination. An assessment of projected traffic volumes is to be made for all study network roadways, comparing those with allowable volume limits on roadways classed as collector and local, and providing a description of the volume/capacity ratio for all roadways in the study network. In addition, delay projections for signalized and unsignalized intersections in the study network will be determined. Where volume/capacity ratios and intersection delay are the measures of effectiveness level of service D or better must be maintained. The analysis shall contain the following minimum information: 1) Proposed Trip Generation. Show in tabular form trip generation rates (see the tables above in this section) and the total trips generated based on proposed zoning. 2) Existing Trip Generation. Show in tabular form trip generation rates (see the tables above in this section) and the total trips generated based on existing zoning. 3) Net Increased Trip Distribution and Assignment. Show proposed trip generation minus existing trips and the calculation of new trips generated. The net increase in trips generated by the zoning request is to be added to the base volumes projected by design year. Twenty-four (24) hour and peak hour volumes must be calculated. Distribution and assignment calculations must be provided. 4) Level of Service Analysis. Show in tabular form the peak hour level of service for existing and proposed zoning. Calculations shall include all thoroughfare links and intersections. Calculate the level of service and percentage change (when compared to base volumes) for each link and intersection. 5) Neighborhood Traffic Analysis. If a proposed rezoning is projected to increase the traffic on an existing or proposed/planned minor collector or local residential street by at least ten (10) percent, a neighborhood traffic analysis shall be performed. This analysis will include an evaluation of existing and projected traffic on the affected roadways. Where the projected traffic exceeds the limits indicated in the Bryan/College Station Unified Design Guidelines, the street network layout must be adjusted to lower this traffic volume. 6) Conclusions. Summarize points of conflict and congestion, identify all thoroughfare links and intersections not achieving a level of service D or better, and the percentage change resulting from the proposed zoning change. The results of examining collector and local residential roadways, including the findings of any neighborhood traffic analysis must also be summarized. f. Mitigation. A description of the mitigation measures proposed for achieving acceptable service thresholds shall be shown. Analysis of the study network as adjusted by the proposed measures must be documented. Traffic produced by the proposed zoning request plus traffic levels projected by the time of project occupancy should result in a level of service D or better. Locations not meeting a level of service D where the proposed zoning contributes five (5) percent or more of the peak hour traffic must be mitigated by the applicant. Acceptable methods of mitigating negative traffic impacts include one (1), or a combination of, the measures listed below but are not limited to those listed. 1) Modifying the zoning request so that resulting traffic volumes yield a level of service D or better throughout the study network. 2) Modify any street network proposed as part of the development project in terms of size, layout, connectivity, intersection layouts, or location of termini with thoroughfares, or any combination of such changes. 3) Limit development densities/intensities within one (1) or more zoning classifications or land parcels to result in acceptable traffic volumes. 4) Making minor thoroughfare or intersection improvements, such as adding/extending or relocating turn lanes, adding/extending acceleration and/or deceleration lanes, adding non-traversable medians, relocating median openings, using special directional median openings, or using special features to facilitate safe U-turn maneuvers. Amendments to the Comprehensive Plan Functional Classification & Context Class Map shall not be accepted as a means of mitigating negative impacts unless the proposed amendment(s) can be shown to enhance capacity and safety and will be constructed as part of the proposed land development project. g. Planning and Zoning Commission Report. The Planning and Zoning Commission shall make a report to the City Council on all traffic impact analyses it considers in conjunction with rezoning requests. The Planning and Zoning Commission may make a recommendation for approval, modification, or denial of the zoning case based on other planning factors in addition to its review of the traffic impact analysis. Where the identified impacts of the proposed zoning cannot be adequately mitigated, the Planning and Zoning Commission may recommend to the City Council one (1) or more of the following actions: 1) Denial of the zoning case in total or in part. 2) Other action(s) deemed appropriate by a study made, or endorsed by, a qualified traffic engineer to mitigate negative traffic impacts. 4. Preliminary Plan Traffic Impact Analysis Content. Submittals of traffic impact analyses for preliminary plan projects shall include the following: a. Study Area. A map(s) delineating the traffic impact analysis study area, including land areas to be considered and all existing/planned roadways therein, and the study network (those roadways and intersections requiring specific analysis). The study area will be determined by identifying the geographical area most affected by the proposed development as determined by the Administrator after conferring with the applicant. In general, the study area will cover all intersections through which at least ten (10) percent of the proposed development's site traffic passes and shall extend to and include at least the first traffic signal in all directions if within one (1) mile of any portion of the site. Existing roadway and intersection capacities shall be shown. b. Existing Zoning. A description of existing zoning in the area included in the preliminary plan. c. Thoroughfare Network. A description of existing thoroughfares, signals, signal phasing, and traffic volumes within the study area. d. Proposed Development. A description of the proposed development including land area (gross and net), square footage, density, dwelling units, etc. Also, a description of anticipated roadway conditions expected by the date of completion of the proposed development shall be included. e. Proposed Roadway Network. Identification of the proposed roadway network for the preliminary plan. This shall include the location of access points, the location and number of lanes of proposed roadways or public ways, and proposed traffic controls. It must also include any proposed modifications to adjacent roadways. f. Impact Determination. A determination of the level of service for all roadways and intersections in the study area shall be included, as shall an evaluation of pedestrian, bicycle, and motor vehicle safety conditions within the preliminary plan. The analysis shall contain the following minimum information: 1) Proposed Trip Generation. A calculation of the total trip generation by use within the study area assuming full development and occupancy, including both peak hour and twenty-four (24) hour information showing any reductions attributed to passers-by, mixed-use, etc. Show trip generation by use in tabular form with land use trip generation rates and trips generated. 2) Trip Distribution and Assignment. A calculation of trips generated by the proposed development as added to the base volumes projected for the design year. Peak hour volumes must be calculated. Distribution assumptions (and the bases, therefore) and assignment calculations must be provided. 3) Level of Service Analysis. A depiction shown in tabular form, twenty-four (24) hour and peak hour volume/capacity ratios for links and intersections within the study area. This analysis should be done for the following traffic conditions: existing traffic, existing traffic plus projected traffic. 4) Neighborhood Traffic Analysis. If the traffic impact analysis calculations show that a proposed preliminary plan increases traffic on a minor collector or local residential street by at least ten (10) percent, a neighborhood traffic analysis shall be performed. This analysis will include an evaluation of existing and projected traffic on the affected roadways. Where the projected traffic exceeds the limits indicated in the Bryan/College Station Unified Design Guidelines mitigation to lower this traffic may be required. 5) Conclusions. A summary of findings must be reported. It must show all adjacent roadways and intersections noting those that fail to provide a level of service D or better, and the percent increase in total traffic produced by the proposed project. In addition, the report must demonstrate that the proposed roadway network will provide safe and adequate access to the development. It also must identify any safety and operational problems (e.g., driveways, sight distances, median openings, and signalization) within the study area. g. Mitigation. A description of the mitigation measures proposed for meeting acceptable traffic service thresholds shall be shown. Where the development is contributing five (5) percent or more of the traffic at locations failing to meet a level of service D or better the total trips should be mitigated by the applicant to low enough levels to achieve the required standard (or to pre-development levels if the pre-development level is less than a level of service D). Acceptable measures for mitigating negative traffic impacts include one (1), or a combination of, those listed below. 1) Modifying the density or intensity of land use, such as a reduction in square footage or the percentage of commercial use to result in traffic levels meeting a level of service D or better; 2) Phasing approval and construction of a project until additional roadway capacity becomes available; 3) Modifying the proposed street network in terms of size, layout, connectivity, intersection layouts, or location of termini with thoroughfares or any combination of such changes; 4) Making off-site improvements including the construction of additional lanes, increases in storage lane capacities, or modification/installation of signalization, to list some examples. h. Costs of Mitigation. Mitigation improvements that are attributable to the proposed development shall be funded at the developer's expense. Any other improvements shown which are consistent with the Thoroughfare Plan may be repaid by the City in accordance with its cost-sharing policies. 5. Site Plan Traffic Impact Analysis Content. Submittals of traffic impact analyses for site plan projects shall include the following: a. Study Area. A map(s) delineating the traffic impact analysis study area, including land areas to be considered and all existing/planned roadways therein, and the study network (those roadways and intersections requiring specific analysis). The study area will be determined by identifying the geographical area most affected by the proposed development as determined by the Administrator after conferring with the applicant. In general, the study area will cover all intersections through which at least ten (10) percent of the proposed development's site traffic passes and shall extend to and include at least the first traffic signal in all directions if within one (1) mile of any portion of the site. Existing roadway and intersection capacities shall be shown. b. Existing Zoning and Development. A description of existing zoning including land area (gross and net) by zoning classification, square footage, the density of hotel rooms, dwelling units, etc. Also, a description of the development currently within the proposed site plan, including showing how it will be affected by the new development proposal. c. Thoroughfare Network. A description of existing thoroughfares, signals, signal phasing, and traffic volumes within the study area. d. Proposed Development. A description of the proposed development including land area (gross and net), square footage, the density of hotel rooms, dwelling units, etc. Also, a description of anticipated roadway conditions expected by the date of occupancy of the proposed development shall be included. e. Proposed Access. Identification of the proposed access driveways for the site. This shall include the location and number of lanes, proposed traffic controls, and relationship to on-site circulation features for each proposed point of access. It must also include any proposed modifications to adjacent roadways. Once the traffic impact analysis and an access plan have been approved, the final location and design of all access points shall meet or exceed the current access management and roadway design policies of the entity responsible for the condition of that portion of the adjacent roadway. f. Impact Determination. A determination of the level of service for all roadways and intersections in the study area shall be included, as shall an evaluation of pedestrian, bicycle, and motor vehicle safety conditions along all the roadway frontage of the site. The analysis shall contain the following minimum information: 1) Proposed Trip Generation. A calculation of the total trip generation by use within the study area assuming full development and occupancy, including both peak hour and twenty-four (24) hour information showing any reductions attributed to passers-by, mixed-use, etc. Show trip generation by use in tabular form with land use trip generation rates and trips generated. 2) Trip Distribution and Assignment. A calculation of trips generated by the proposed development as added to the base volumes projected for the design year. Peak hour volumes must be calculated. Distribution assumptions (and the bases, therefore) and assignment calculations must be provided. 3) Level of Service Analysis. A depiction shown in tabular form, twenty-four (24) hour and peak hour volume/capacity ratios for links and intersections within the study area. This analysis should be done for the following traffic conditions: existing traffic, existing traffic plus projected traffic. Capacity analyses must be shown for all points of ingress and egress, median breaks, and turn lanes associated with the proposed site. 4) Neighborhood Traffic Analysis. If the traffic impact analysis calculations show that a proposed site project increases traffic on a minor collector or local residential street by at least ten (10) percent, a neighborhood traffic analysis shall be performed. This analysis will include an evaluation of existing and projected traffic on the affected roadways. Where the projected traffic exceeds the limits indicated in the Bryan/College Station Unified Design Guidelines mitigation to lower this traffic may be required. 5) Conclusions. A summary of findings must be reported. It must show all adjacent roadways and intersections noting those that fail to provide a level of service D or better, and the percent increase in total traffic produced by the proposed site project. In addition, the report must demonstrate that the proposed access design will provide safe and adequate access to the project site. It also must identify any safety and operational problems (e.g., driveways, sight distances, median openings, and signalization) within the study. g. Mitigation. A description of the mitigation measures proposed for meeting acceptable traffic service thresholds shall be shown. Where the development is contributing five (5) percent or more of the traffic at locations failing to meet a level of service D or better the total trips should be mitigated by the applicant to low enough levels to achieve the required standard (or to pre-development levels if the pre-development level is less than a level of service D). Acceptable measures for mitigating negative traffic impacts include one (1), or a combination of, those listed below: 1) Modifying the density or intensity of land use, such as a reduction in square footage or the percentage of commercial use to result in traffic levels meeting a level of service D or better; 2) Phasing approval and construction of a project until additional roadway capacity becomes available; 3) Improving the access plan by dealing with features such as overall site arrangement, the placement and design features of access points, provision of additional access points to roadways not immediately adjacent to the property, provision of alternate controls, or adjustments in the site circulation system; 4) Making off-site improvements including the construction of additional lanes, increases in storage lane capacities, or modification of signalization, to list some examples. h. Costs of Mitigation. Mitigation improvements that are attributable to the proposed development shall be funded at the developer's expense. Any other improvements shown that are consistent with the Thoroughfare Plan may be repaid by the City in accordance with its cost-sharing policies. E. Criteria for Approval. The City shall consider the following standards in determining whether a proposed rezoning or submitted site plan project meets an acceptable level of service: 1. Design Requirement. The proposed rezoning or site plan project is consistent with the City's adopted access management and design requirements and is consistent with the design requirements of the Texas Department of Transportation (TxDOT) on roadways maintained by such agency. 2. Level of Service D. The desirable minimum level of service for the City of College Station is a level of service D as that term is described in the Transportation Research Board's Highway Capacity Manual. 3. Determination of Adequate Mitigation. Notwithstanding anything to the contrary herein, the appropriate Administrator and the appropriate reviewing body, where required, shall, based on recommendations by a qualified traffic engineer, determine whether adequate mitigation has occurred to meet an acceptable level of service utilizing the requirements set forth herein.
(Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.
