§ 7.14 — Drainage and Stormwater Management
Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, App. A, § 7.14
Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/ef7caa44-a6d1-4be9-a9a1-9707afc99090
Sec. 7.14. - Drainage and Stormwater Management.
A. General. 1. Purpose and Intent. This Section establishes methods for controlling the introduction of pollutants into the municipal stormwater drainage system and establishes legal authority for the City to carry out all inspections, surveillance, monitoring, and enforcement procedures necessary to ensure compliance with the Municipal Separate Storm Sewer System (MS4) permit for industrial and construction activity. 2. Compatibility with Other Regulations. a. This Section is not intended to modify or repeal any other ordinance, rule, regulation, or other provision of law. The requirements of this Section are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this Section imposes the restriction of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. b. Any reference to this Section shall also apply to the Stormwater Discharges Article of Chapter 14, Environment and Natural Resources of the City of College Station Code of Ordinances, and both Sections shall be interpreted and enforced in conjunction with each other, where applicable. 3. General Standards. a. Final stabilization occurs when one of the following conditions has been met for a site: 1) All soil disturbing activities at a site have been completed and either of the two (2) following criteria are met: a) A uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of seventy (70) percent of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures; or b) Equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed. 2) When background native vegetation or other appropriate vegetation will cover less than one hundred (100) percent of the ground (e.g., arid areas, beaches), the seventy (70) percent coverage criteria is adjusted as follows: if the native vegetation or other appropriate vegetation covers fifty (50) percent of the ground, seventy (70) percent of fifty (50) percent (0.70 × 0.50 = 0.35) would require thirty-five (35) percent total cover for final stabilization. On a beach with no natural vegetation, no stabilization is required. 3) For individual lots in residential construction: a) The homebuilder has completed final stabilization as specified above; or b) The homebuilder has established temporary stabilization including perimeter controls for an individual lot prior to occupation of the home by the homeowner and informing the homeowner of the need for, and benefits of, final stabilization. 4) For construction projects on land used for agricultural purposes (e.g., pipelines across crop or range land, staging areas for highway construction, etc.), final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface waters of the State and areas which are not being returned to their preconstruction agricultural use must meet the final stabilization criteria above. b. The following categories of facilities are considered to be engaging in industrial activity: 1) Facilities subject to stormwater effluent limitations guidelines, new source performance standards, or toxic pollutant effluent standards under 40 CFR. subchapter N (except facilities with toxic pollutant effluent standards which are exempted under Subsection 11 below); 2) Facilities classified as Standard Industrial Classifications 24 (except 2434), 26 (except 265 and 267), 28 (except 283), 29, 311, 32 (except 323), 33, 3441, 373; 3) Facilities classified as Standard Industrial Classifications 10 through 14 (mineral industry) including active or inactive mining operations (except for areas of coal mining operations no longer meeting the definition of a reclamation area under 40 CFR § 434.11(1) because the performance bond issued to the facility by the appropriate federal Surface Mining Control and Reclamation Act authority has been released, or except for areas of non-coal mining operations which have been released from applicable state or federal reclamation requirements after December 17, 1990, and oil and gas exploration, production, processing, or treatment operations, or transmission facilities that discharge stormwater contaminated by contact with or that has come into contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; 4) Hazardous waste treatment, storage, or disposal facilities, including those that are operating under interim status or a permit under subtitle C of the Federal Resource Conservation and Recovery Act (RCRA); 5) Landfills, land application sites, and open dumps that receive or have received any industrial wastes (waste that is received from any of the facilities described under this subsection) including those that are subject to regulation under subtitle D of the RCRA; 6) Facilities involved in the recycling of materials, including metal scrap yards, battery reclaimers, salvage yards, and automobile junkyards, including but limited to those classified as Standard Industrial Classification 5015 and 5093; 7) Steam electric power generating facilities, including coal handling sites; 8) Transportation facilities classified as Standard Industrial Classifications 40, 41, 42 (except 422125), 43, 44, 45, and 5171 which have vehicle maintenance shops, equipment cleaning operations, or airport deicing operations. Only those portions of the facility that are either involved in vehicle maintenance, equipment cleaning operations, airport deicing operations, or which are otherwise identified under Subsections 1-7 above or Subsections 9-11 below are associated with the industrial activity; 9) Treatment works treating domestic sewage or any other sewage sludge or wastewater treatment device or system, used in the storage treatment, recycling, and reclamation of municipal or domestic sewage, including land dedicated to the disposal of sewage sludge that is located within the confines of the facility, with a design flow of one (1) million gallons per day or more, or required to have an approved pretreatment program under 40 CFR part 403. Not included are farmlands, domestic gardens, or lands used for sludge management where sludge is beneficially reused and which are not physically located in the confines of the facility, or areas that comply with Section 405 of the Clean Water Act; 10) Construction activity including clearing, grading, and excavation activities except for operations that result in the disturbance of less than one (1) acre of total land area which are not part of a larger common plan of development or sale; 11) Facilities under Standard Industrial Classifications 20, 21, 22, 23, 2434, 25, 265, 267, 27, 283, 285, 30, 31 (except 311), 323, 34 (except 3441), 35, 36, 37 (except 373), 38, 39, 422125, (and which are not otherwise included within Subsections 2-10 above); c. For the purposes of this section: 1) Construction activity or construction activities include clearing, grading, and excavating that are subject to Texas Pollutant Discharge Elimination System (TPDES) Construction General Permits. It does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, and original purpose of a ditch, channel, or other similar stormwater conveyance. Additionally, it does not include the routine grading of existing dirt roads, asphalt overlays of existing roads, the routine clearing of existing rights-of-way, and similar maintenance activities. 2) Construction site includes any construction site required by the Clean Water Act to operate within the limits of a TPDES permit to discharge stormwater associated with construction activity. 3) Facility includes any facility, industrial facility, or construction site required by the Clean Water Act to have a permit to discharge stormwater associated with industrial or construction activity. 4) Industrial facility includes any facility required by the Clean Water Act to have a permit to discharge stormwater associated with industrial activity subject to TPDES Industrial Permits as defined in 40 CFR, Section 122.26 (b)(14). B. Prohibitions. 1. Unpermitted Discharges Prohibited. It is an offense for an operator or responsible party of a facility to: a. Discharge, or cause to be discharged, stormwater associated with industrial or construction site activity without first having obtained a TPDES permit from the Texas Commission on Environmental Quality (TCEQ). b. Operate a facility that is discharging stormwater associated with a construction site activity without having submitted a copy of the notice of intent or construction site notice to the City. c. Introduce sediment, concrete, asphalt, or any other construction debris into the MS4 from construction activity. The Administrator will provide the operator with a reasonable amount of time to remove any pollutants or debris from the MS4 conveyances. C. Facility Inspection for Stormwater Discharges. 1. Applicability for Industrial and Construction Activity. a. This Section applies to all facilities located within the city limits that have stormwater discharges associated with industrial activity or construction site activity. State regulations require that subject facilities apply for and obtain general permits for industrial facilities (TPDES TXR050000) and construction sites (TXR150000) that have been determined to contribute or have the potential to contribute substantial pollutant loads to the MS4 or waters of the State. The general permits require that the permittee develop, implement, and maintain a stormwater pollution prevention plan (SWP3) and submit a notice of intent notifying the TCEQ and the MS4 operator (City of College Station). b. The MS4 permit issued to the City by the TCEQ mandates the City to "carry out all inspections, surveillance, and monitoring procedures necessary to determine compliance with permit conditions" (Part III (E)(6)) and to implement a program that shall include "inspection of construction sites and enforcement of control measure requirements" (Part III (A)(9)(b)). To meet these requirements, the City must enter the premises of industrial and construction sites to inspect, monitor, and conduct surveillance of requirements mandated by the TCEQ. These requirements include, but are not limited to: 1) Review of the facilities' SWP3 with onsite conditions; 2) Evaluation of best management practices (BMPs) to effectively prohibit the discharge of non-stormwater to the MS4; 3) Inspection for illicit connections and illicit discharges; 4) Self-inspection compliance; and 5) Compliance with the City's MS4 permit and the facilities subject to general permit (TXR150000 or TXR050000). 2. Access to Industrial Facilities and Construction Sites. a. The intent of facility inspections shall be to determine compliance with the conditions of the City's TPDES permit, any TPDES general permit the facility is currently obligated to for industrial and construction activities, and this Section. Facility owners and operators will allow the Administrator ready access to applicable sections of public and private premises for the sole purpose of inspection, surveillance, and monitoring for the presence of illegal discharges to the MS4, illicit connections to the MS4, and assessment of any portions of a regulated facility influenced by stormwater runoff that may adversely affect the MS4 or waters of the United States. b. Admittance to the facility shall be requested at a reasonable time during the facility's normal working hours unless it is determined by the Administrator that imminent and substantial danger exists. c. The owner or operator shall make all necessary arrangements to allow access to the Administrator. d. If the owner or operator refuses entry after a request to enter and inspect has been made, the City is hereby empowered to seek assistance from any court of competent jurisdiction in obtaining such entry. e. The Administrator retains the authority to collect samples and photographs from stormwater outfalls or other components of the MS4 as may be deemed appropriate in the administration and enforcement of this Section. f. The Administrator has the authority to establish devices to conduct monitoring of the facility's stormwater discharge on subject facilities as necessary in the opinion of the Administrator. g. The Administrator or the designated inspector must present appropriate credentials to the facility officials at the time of entry to a facility. 3. Review and Modification of Stormwater Pollution Prevention Plans. a. The Administrator has the authority to request to review any documents or plans (stormwater pollution prevention plan, spill prevention control plans, hazardous material plans, waste management documentation, etc.) from a regulated facility that the Administrator deems may affect stormwater discharges to the MS4. b. The Administrator may require an operator of a regulated facility to modify its stormwater pollution prevention plan if the stormwater pollution prevention plan does not comply with the requirements of the facility's TPDES permit to discharge stormwater associated with industrial or construction activity. c. The deficiencies in a facility's stormwater pollution prevention plan will be communicated in writing, and the Administrator will provide the operator a reasonable amount of time to make the necessary changes in the stormwater pollution prevention plan. 4. Review and Modification of Best Management Practices. a. Any person engaged in activities or operation, or owning facilities or property, which will or may result in pollutants entering the MS4 or waters of the United States, shall implement BMPs to the extent they are technologically achievable to prevent and reduce such pollutants. The owner or operator of a regulated facility shall prove reasonable protection from accidental discharge of prohibited materials or other wastes into the MS4 or waters of the United States. Practices implemented to prevent the accidental discharge of prohibited materials or other wastes shall be provided and maintained at the owner or operator's expense. b. The City does not maintain a list of required or approved BMPs for regulated facilities. The Administrator may request facilities to demonstrate the effectiveness of implemented BMPs. Suggested BMPs and a list of prohibited BMPs will be maintained in the Drainage Section of the Bryan/College Station Unified Design Guidelines. c. The Administrator may require an operator of a regulated facility to modify its BMPs if the BMPs do not provide effective protection from accidental discharge of prohibited materials or other wastes from entering into the MS4 or waters of the United States. d. The deficiencies in a facility's BMPs will be communicated in writing, and the Administrator will provide the operator a reasonable amount of time to make the necessary changes in the BMPs. 5. Compliance with Permit. a. A facility shall be operated in strict compliance with the requirements of the TPDES permit to discharge stormwater associated with industrial or construction site activity. b. A person commits an offense if the person operates a facility in violation of a requirement of the facility's TPDES permit to discharge stormwater associated with industrial or construction site activity. D. Stormwater Discharges Associated with Industrial Activity. 1. Applicability. This Subsection applies to all facilities located within the city limits that have stormwater discharges associated with industrial activity. 2. Industrial and High-Risk Runoff Monitoring. a. All hazardous waste treatment and storage facilities, active municipal landfills, facilities subject to Section 313 of Title III of the Superfund Amendment and Reauthorization Act of 1986, and any other industrial discharger the City determines is contributing a substantial pollutant load to the MS4 shall submit self-monitoring data to the City on an annual basis. The submittal date of self-monitoring data is to be determined by the Administrator. b. The City's MS4 permit requires that all industrial facilities listed above be subject to site inspections of no less than once per permit term (five (5) years). However, the Administrator has the authority to inspect these industrial facilities as often as deemed necessary to assure permit compliance and safety of the MS4 and waters of the United States. c. An unreasonable delay or refusal to submit self-monitoring data to the Administrator is a violation of this Section. A person who is the operator of an industrial facility with a TPDES permit to discharge stormwater associated with industrial activity commits an offense if the person denies the Administrator reasonable access to a facility's self-monitoring data for the purpose of review required by this Section. d. An industrial facility may submit a no-exposure certification to the City in lieu of self-monitoring; however, any facility operating under a no-exposure certification is subject to periodic facility inspections (not less than once per permit term (five (5) years) to verify the facility's no exposure exemption. e. The City may waive monitoring requirements for industrial facilities determined to comply with the TPDES Multi-Sector General Permit Number TXR050000. f. The Administrator has the authority to conduct inspections on any industrial facility subject to the TCEQ's TPDES Multi-Sector General Permit or has been deemed to be, or has the potential to be, contributing a substantial pollutant load to the MS4 to determine compliance and safety of the MS4 and waters of the United States. E. Stormwater Discharges Associated with Construction Activity. 1. Applicability. This Subsection applies to all facilities located within the city limits that have stormwater discharges associated with construction activity. 2. Submission of a notice of intent, a notice of change, a notice of termination, or a construction site notice to the municipal stormwater drainage system operator. a. The operator of a construction site required to have a TPDES permit to discharge stormwater associated with construction activity shall submit a copy of the above notices to the Administrator at the same time the operator submits the original notice to the TCEQ. b. The operator of a construction site that does not require a notice of intent is required to submit a construction site notice to the Administrator per TCEQ's TPDES general permit for construction sites. c. Copies of all notices may be delivered to the Administrator either in person or by mail. F. Stormwater Management for Residential Subdivision Construction Activity. 1. A note shall be placed on all plats stating that residential lots shall be developed in accordance with a master grading plan for the proposed subdivision. A master grading plan shall be prepared and submitted to the City, which indicates lot grading for all lots in the subdivision using typical Federal Housing Administration (FHA) lot grading types (A, B, and C), as depicted below. An alternative grading plan, prepared by a licensed professional engineer or other drainage professional may also be acceptable if approved by the Development Engineer. Federal Housing Administration (FHA) Lot Grading Types A, B, and C [image omitted; see the official code] 2. Construction activities shall match existing adjacent property grades around the perimeter of the property. Retaining walls may be utilized on a case-by-case basis, with the approval of the Development Engineer, if the proposed lot grading is prepared by a licensed professional engineer. In no circumstances shall a fence be utilized as a retaining wall. 3. All drainage, including but not limited to direct roof discharge, gutters, storm drains, and swales shall avoid point discharges that may cause damage to adjacent properties. 4. The maximum slope of grading on a property shall not exceed ten (10) percent unless designed by a professional engineer and approved by the Development Engineer. G. Enforcement. Any person found guilty of violating a provision of this Section may be punished as provided for in Article 10, Enforcement of this UDO.
(Ord. No. 2023-4446, Pt.1 (Exh. A), 6-12-2023; Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.